Bill Keenen  Professional Project Portfolio Photographs
Vista Ridge Mall Phase II <ul><li>160,000 SF Addition for Homart Development. Completed on time & within budget. </li></ul>
Foley’s @ Vista Ridge <ul><li>180,000 SF Anchor Department Store for the Vista Ridge Phase II Mall Expansion Built for the...
AMI Fab 10 <ul><li>Class 1 Ballroom Style Microelectronics Cleanroom with a Clear Span of 181 LF. </li></ul>
AMI Fab 10 <ul><li>Class 10 Clean Interconnect Corridor between Existing Fab 9 & the New Fab 10 that saves time in the mov...
AMI Fab 10  <ul><li>Bulk Gas Back Pad for the Generation of High Purity Nitrogen. It also supports the Fab with other nece...
AMI Fab 10 <ul><li>Pressurized Plenum Utilizing Custom Recirculation Air Handling Units Producing 30,000 CFM of HEPA Filte...
AMI Fab 10 <ul><li>A View of the Sub-Fab Piping Racks and Electrical Bus Looking up to the Production Floor from the Sub-F...
AMI Fab 10 – Beta Tool Set <ul><li>Initial Production Process Tool Set. Installed proximate to  an Emergency Eyewash Stati...
HISUS A/O Building <ul><li>45,000 SF 3 Story Structural Steel Frame with Granite Clad GFRC Panels.  Included 8000 SF Class...
HISUS A/O Building <ul><li>Book Matched Marble on the Reception Desk. Polished Stainless Steel Stair with Radius Glass.  <...
HISUS Clean Room Remodel – Bay & Chase <ul><li>Class 100 Process Equipment Chase prior to the Process Tool Installation.  ...
HISUS Clean Room Remodel – Bay & Chase <ul><li>Class 10 Production Bay prior to Tool Installation with Integral Ionization...
HISUS U4 – Construction Progress Photo <ul><li>Breaking Ground and Excavation Begins. </li></ul>
HISUS U4 – Construction Progress Photo <ul><li>Piers Drilling, Vertical Formwork, and Shear Wall Placement in the Crawl Sp...
HISUS U4 – Construction Progress Photo <ul><li>Vertical Formwork coming out of the Ground from the Piers through the Crawl...
HISUS U4 – Construction Progress Photo <ul><li>Concrete Placement and Finishing of the Waffle Slab while Formwork is Progr...
HISUS U4 – Construction Progress Photo <ul><li>Concrete Shear Wall Construction and Vertical Concrete Placement from the C...
HISUS U4 – Construction Progress Photo <ul><li>Concrete Slab Placement for the Support Services like Chemical Distribution...
HISUS U4 – Construction Progress Photo <ul><li>Clear Span Truss Erection Continues. The Waffle Slab Elevation is Decked in...
HISUS U4 – Construction Progress Photo <ul><li>Structural Steel Erection Continues with the Truss Members Being Staged on ...
HISUS U4 – Construction Progress Photo <ul><li>Structural Steel Installation Secondary Framing Progressing while Roof Deck...
HISUS U4 – Construction Progress Photo <ul><li>View From the Waffle Slab Elevation up to the Clear Span Trusses and MAHU A...
HISUS U4 – Construction Progress  Photo <ul><li>Construction of the Masonry 4 Hour Fire Separation Walls that also Create ...
HISUS U4 - Substation <ul><li>138 KV Dual Feed Substation on Site Dedicated for the support of Hitachi Semiconductor Plant...
HISUS U4 – Electrical Room <ul><li>Electrical Distribution at Medium Voltage 13.8 KV with Redundant Service Feeders & Unin...
HISUS U4 – Fab Level Ballroom <ul><li>Fab Level Ballroom with Fan Filter Unit Plenum Ceiling with Integrated Lights and Io...
HISUS U4 – Support Area <ul><li>Class 100 Wafer Test Area with 2’ x 2’ Static Dissipative Raised Floor System. </li></ul>
HISUS U4 – Sub-Fab <ul><li>Sub-Fab View Looking up at the Gold Guard Unistrut Rack System  Supporting  the Process Piping ...
HISUS U4 – Central Plant <ul><li>Plant Chiller Capacity  7000 Tons </li></ul><ul><li>Vibration Isolation on all Rotating E...
HISUS U4 – D.I. Water Plant <ul><li>D.I. Water Plant Producing 18 Mega-Ohm Water with a UDI Water Pretreatment System. </l...
HISUS U4 – Central Plant <ul><li>Central Plant Service Aisle to Service and Pull the Chiller Tubes. Notice the Vibration I...
HISUS U4 – Fan Filter Deck <ul><li>Bill Keenen Fully Gowned and Inspecting the Clean Air Plenum  utilizing the Fan Filter ...
SRX Project <ul><li>Office Warehouse Manufacturing Facility with 2 nd  Floor Mezzanine. Tilt Wall Panels with full Face Br...
Clarke Checks <ul><li>40,000 SF Build to Suit Office, Warehouse, and Checking Printing Facility. Mezzanine Office Areas wi...
Northgate Phase II – Building 15 <ul><li>Brick and Tilt-Wall Building with Low Clear Height and Dock High Rear Entry. Face...
Summit Business Park – Plano TX – Building 5 <ul><li>104,000 SF High Bay Tilt-Wall Warehouse with Face Down Panels and Lab...
Summit Business Park –  Plano TX – Building 2 <ul><li>Buildings 1 – 4 were single story low clear height which were opposi...
Upcoming SlideShare
Loading in...5
×

Bill Keenen Project Slideshow R2

1,017

Published on

Project Portfolio Photo Highlights

Published in: Career, Business, Design
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,017
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Bill Keenen Project Slideshow R2

  1. 1. Bill Keenen Professional Project Portfolio Photographs
  2. 2. Vista Ridge Mall Phase II <ul><li>160,000 SF Addition for Homart Development. Completed on time & within budget. </li></ul>
  3. 3. Foley’s @ Vista Ridge <ul><li>180,000 SF Anchor Department Store for the Vista Ridge Phase II Mall Expansion Built for the May Company. </li></ul>
  4. 4. AMI Fab 10 <ul><li>Class 1 Ballroom Style Microelectronics Cleanroom with a Clear Span of 181 LF. </li></ul>
  5. 5. AMI Fab 10 <ul><li>Class 10 Clean Interconnect Corridor between Existing Fab 9 & the New Fab 10 that saves time in the movement of people between the Fabs by eliminating unnecessary smock changes. </li></ul>
  6. 6. AMI Fab 10 <ul><li>Bulk Gas Back Pad for the Generation of High Purity Nitrogen. It also supports the Fab with other necessary Bulk Gases such as Oxygen & Argon. </li></ul>
  7. 7. AMI Fab 10 <ul><li>Pressurized Plenum Utilizing Custom Recirculation Air Handling Units Producing 30,000 CFM of HEPA Filtered Air Directed to the Production Area Below. </li></ul>
  8. 8. AMI Fab 10 <ul><li>A View of the Sub-Fab Piping Racks and Electrical Bus Looking up to the Production Floor from the Sub-Fab below. </li></ul>
  9. 9. AMI Fab 10 – Beta Tool Set <ul><li>Initial Production Process Tool Set. Installed proximate to an Emergency Eyewash Station. Notice the Amber Lenses in the Photolithography Area. </li></ul>
  10. 10. HISUS A/O Building <ul><li>45,000 SF 3 Story Structural Steel Frame with Granite Clad GFRC Panels. Included 8000 SF Class 100 Wafer Test Clean Room. </li></ul>
  11. 11. HISUS A/O Building <ul><li>Book Matched Marble on the Reception Desk. Polished Stainless Steel Stair with Radius Glass. </li></ul>
  12. 12. HISUS Clean Room Remodel – Bay & Chase <ul><li>Class 100 Process Equipment Chase prior to the Process Tool Installation. </li></ul>
  13. 13. HISUS Clean Room Remodel – Bay & Chase <ul><li>Class 10 Production Bay prior to Tool Installation with Integral Ionization System in the HEPA Ceilings. </li></ul>
  14. 14. HISUS U4 – Construction Progress Photo <ul><li>Breaking Ground and Excavation Begins. </li></ul>
  15. 15. HISUS U4 – Construction Progress Photo <ul><li>Piers Drilling, Vertical Formwork, and Shear Wall Placement in the Crawl Space. </li></ul>
  16. 16. HISUS U4 – Construction Progress Photo <ul><li>Vertical Formwork coming out of the Ground from the Piers through the Crawl Space up to the Subfab Floor Elevation. </li></ul>
  17. 17. HISUS U4 – Construction Progress Photo <ul><li>Concrete Placement and Finishing of the Waffle Slab while Formwork is Progressing in the Service Areas and the Scaffold Shores are being Erected. </li></ul>
  18. 18. HISUS U4 – Construction Progress Photo <ul><li>Concrete Shear Wall Construction and Vertical Concrete Placement from the Crawl Space through to the Subfab Elevation. </li></ul>
  19. 19. HISUS U4 – Construction Progress Photo <ul><li>Concrete Slab Placement for the Support Services like Chemical Distribution Rooms and Specialty Gas Distribution Rooms. </li></ul>
  20. 20. HISUS U4 – Construction Progress Photo <ul><li>Clear Span Truss Erection Continues. The Waffle Slab Elevation is Decked in Protective Plywood while the Subfab elevation is Visible Below. </li></ul>
  21. 21. HISUS U4 – Construction Progress Photo <ul><li>Structural Steel Erection Continues with the Truss Members Being Staged on the next Waffle Slab. MAHU Ductwork Installation is Installed. </li></ul>
  22. 22. HISUS U4 – Construction Progress Photo <ul><li>Structural Steel Installation Secondary Framing Progressing while Roof Decking is being Installed Above and MAHU Ductwork is Being Installed within the Truss. </li></ul>
  23. 23. HISUS U4 – Construction Progress Photo <ul><li>View From the Waffle Slab Elevation up to the Clear Span Trusses and MAHU Air Handler Deck. </li></ul>
  24. 24. HISUS U4 – Construction Progress Photo <ul><li>Construction of the Masonry 4 Hour Fire Separation Walls that also Create the Return Air Chase from the Subfab Return Air Grill to the Fan Filter Plenum Deck. </li></ul>
  25. 25. HISUS U4 - Substation <ul><li>138 KV Dual Feed Substation on Site Dedicated for the support of Hitachi Semiconductor Plant Operations with Architectural Screen Wall and Lightning Protection Systems. </li></ul>
  26. 26. HISUS U4 – Electrical Room <ul><li>Electrical Distribution at Medium Voltage 13.8 KV with Redundant Service Feeders & Uninterruptable Power Supply for Critical Systems. </li></ul>
  27. 27. HISUS U4 – Fab Level Ballroom <ul><li>Fab Level Ballroom with Fan Filter Unit Plenum Ceiling with Integrated Lights and Ionization Systems. Nickel Chrome Plated 2’ x 2’ Grated Floor Panels. </li></ul>
  28. 28. HISUS U4 – Support Area <ul><li>Class 100 Wafer Test Area with 2’ x 2’ Static Dissipative Raised Floor System. </li></ul>
  29. 29. HISUS U4 – Sub-Fab <ul><li>Sub-Fab View Looking up at the Gold Guard Unistrut Rack System Supporting the Process Piping Systems and Stainless Exhaust Ductwork. Chemical Resistant Floor Coatings with Containment Curbs at each Column Sealing the Isolation Joints. </li></ul>
  30. 30. HISUS U4 – Central Plant <ul><li>Plant Chiller Capacity 7000 Tons </li></ul><ul><li>Vibration Isolation on all Rotating Equipment </li></ul><ul><li>Advanced Building Automation System </li></ul>
  31. 31. HISUS U4 – D.I. Water Plant <ul><li>D.I. Water Plant Producing 18 Mega-Ohm Water with a UDI Water Pretreatment System. </li></ul>
  32. 32. HISUS U4 – Central Plant <ul><li>Central Plant Service Aisle to Service and Pull the Chiller Tubes. Notice the Vibration Isolation Inertia Bases on the rotating Equipment. </li></ul>
  33. 33. HISUS U4 – Fan Filter Deck <ul><li>Bill Keenen Fully Gowned and Inspecting the Clean Air Plenum utilizing the Fan Filter Unit Walkable Deck. </li></ul>
  34. 34. SRX Project <ul><li>Office Warehouse Manufacturing Facility with 2 nd Floor Mezzanine. Tilt Wall Panels with full Face Brick Façade Poured Face Down with ¾” Reveals on a 2’x2’ Grid. </li></ul>
  35. 35. Clarke Checks <ul><li>40,000 SF Build to Suit Office, Warehouse, and Checking Printing Facility. Mezzanine Office Areas with 3 Story Entrance, Brick Paver Accent Band on Exposed Aggregate Panels. </li></ul>
  36. 36. Northgate Phase II – Building 15 <ul><li>Brick and Tilt-Wall Building with Low Clear Height and Dock High Rear Entry. Face Brick Façade Radius Columns over Concrete Columns with Steel Lintels for the Brick and Block Above. </li></ul>
  37. 37. Summit Business Park – Plano TX – Building 5 <ul><li>104,000 SF High Bay Tilt-Wall Warehouse with Face Down Panels and Labrado Ribbed Texture. </li></ul>
  38. 38. Summit Business Park – Plano TX – Building 2 <ul><li>Buildings 1 – 4 were single story low clear height which were opposite hand mirror images of one another. Face Down Panels with Labrado Ribbed Texture. </li></ul>