Sitka's Blue Lake Project - by Dean Orbison

  • 3,088 views
Published

A presentation by Sitka Electric Dept. generation engineer Dean Orbison to the Chamber of Commerce on 2-13-13.

A presentation by Sitka Electric Dept. generation engineer Dean Orbison to the Chamber of Commerce on 2-13-13.

Published in News & Politics
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
3,088
On SlideShare
0
From Embeds
0
Number of Embeds
2

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide
  • Let’s show a plan view or photograph. So far it is not obvious that this dam is curved with a rather short radius.

Transcript

  • 1.  Project Description Reservoir Operation Level Generation Outage Critical Aspects Schedule for Construction Photos of Work
  • 2. Project Description Upper Tunnel Penstock New Crossing Intake Dam Penstock Drainage Tunnel Lower Tunnel Surge Chamber Proposed 15.9 MW Powerhouse
  • 3. Project Description
  • 4. DRAINAGE TUNNEL Project Description
  • 5. Project Description
  • 6. Project Description
  • 7. Project Description
  • 8. Project Description
  • 9.  Blue Lake is Sitka’s drinking water source. The water must meet drinking water standards during construction and commissioning. The Blue Lake hydro project must be operated to meet existing electrical loads during construction. We have limited ability to control lake level. The timing of the Generation Outage is established by the seasonal reservoir inflow not our ability to prepare for the outage.
  • 10. GENERATION OUTAGE MUST GO LIKE CLOCKWORK AT MULTIPLE SITES – MAJOR WORK ITEMS ARE: INTAKE TUNNEL CONNECTION; PLUG OLD TUNNEL; OPEN UP NEW ONE STEEL LINER INSTALL AT NORTH AND SOUTH PORTALS (NEAR FVU) SURGE SHAFT CONNECTION STEEL LINER AT LOWER PORTAL PENSTOCK SECTIONS REMOVAL AND REPLACEMENT WITH ANCHOR BLOCKS WET TEST FIXED WHEEL GATE; FILL POWER TUNNEL WET TEST NEW TURBINE AND GENERATOR – ONE UNIT ONLY COMPLETE MILESTONE 5 – OPERATION OF FIRST UNIT AT 75% GATE BY OWNER FOR 12 HOURS