Los Alamos National Lab (LANL)
Scope: Formality of Operations Support in the NMSM-SMF Program Office
Provided support in the NMSM-SMF Program Office in the Formality of Operations programs at all Stockpile
Management Facilities (CMR, TA-55, TA-18, WETF, and SIGMA). Work included support of the CMR resumption
activities, Operability Assessments development of Corrective Action Plans, and implementation. Supported the
following areas:

LINK ACTIVITIES

IN THE FOLLOWING PROGRAMS

 Analysis and Assessment

 Quality Management Systems

 Planning & Reviews

 Safety Systems

 Training

 Facility Safety Basis

 ISM Implementation

 Work Authorization

 Reporting and Issue Resolution

 Work Control

 Developing/Using Quality
Management System Tools

 Conduct of Operations

Activities also included support of Readiness Assessments, Operational Readiness Reviews, Performance
Assurance, Corrective Action Planning and Implementation assurance, and support to Program Management
processes including DOE interface, prioritization of activities and problem resolution. Prepared draft materials and
stand-alone reports to support CMR resumption activities and Operability Assessments. In addition, deliverables
defined by LANL included analyses, calculations, review comments, monthly status reports, and participation in
LANL meetings and processes such as quality improvement teams. Assisted or developed and implemented specific
training packages as requested. Assisted in the development of the Safety Assessment Plan for CMR Facility
Operations.

125 TownPark Drive, Suite 300

Kennesaw, Georgia 30144

770-919-7070
Idaho Nuclear Technology and Engineering Center (INTEC)
Scope: Technical Service Support for INTEC Compliance
1. Introduction
The Idaho Nuclear Technology and Engineering Center (INTEC) required technical experts to assess/verify Conduct
of Operations and compliance issues at INTEC. Link evaluated Conduct of Operations implementation and
Procedure Compliance to define areas for improvement and readiness for ISMS Phase II verification. Also evaluated
the necessary organizational and/or cultural changes that needed to take place to ensure INTEC operated efficiently
and in compliance with applicable laws, regulations, and DOE Orders.
2. Scope/Technical Requirements
Link provided support to the INTEC Site Area Director, Site Area Deputy Director, and supporting managers. Link
efforts included the following task areas:

• Monitored operations at INTEC with the intent to provide guidance for improvements to
Conduct of Operations, communication, compliance, safety, quality, and efficiency.
• Interfaced with BBWI management at INTEC regarding interpretation, effectiveness, and
degree of compliance with respect to procedure requirements and other directives.
• Reviewed work at INTEC for compliance, and verify status and completion of performance
agreements, corrective actions, and procedure compliance.
• Provided oversight of work scope at INTEC and monitor performance.
• Selected Oversight Responsibilities will be delegated by the INTEC SAD.
3. Deliverables:
Link provided INTEC with the following:

• On-site subject matter participation, as requested by the INTEC Site Area Director.
• Monthly compliance status reports to include identification of issues, recommended action
plans, and final issue resolution.

125 TownPark Drive, Suite 300

Kennesaw, Georgia 30144

770-919-7070
Fluor
Scope: Technical Support as SNF Project Coach/Mentor for Operational
Readiness Review
l. Provided support for the FH SNF for Operational Readiness Review (ORR) support as the Coach Mentor.
2. Provided technical support services to the FH Office of the President in determining the effectiveness and the
degree of compliance by the Spent Nuclear Fuels Project with applicable laws, regulations, and DOE Orders
contained in FH manuals. The work was performed through the following task areas:

• Monitored the routine project operations with the intent to provide guidance for
improvements to safety, quality, and efficiency. Support IS also provided for planning
and conducting non-routine activities as necessary.
• Interfaced with DOE-RL and project management regarding interpretation and
implementation of regulatory commitments and other directives.
• Reviewed the project work for compliance, and verify status and completion of
performance agreements, Corrective Actions, and milestones.
• Provided Oversight of work scope and Performance Monitoring. Select oversight
responsibilities may be delegated from the FH Project Support Vice President.
• Integrated subproject activities within project by facilitating effective communications
and resolving issues among projects, ES&H, PHMC support organizations,
management, and DOE-RL clients.
• Provided the FH Office of the President with a field presence for project activities and
processes related to maintenance, operation, startup, and shutdown,
• Notified the FH Office of the President of any activities or practices requiring either
immediate or long-term corrective actions. Prepare periodic reports of field
monitoring and oversight activities as required by the FH Chief Operating Officer
• Readiness Support: Provide Coach/Mentoring to the facility for pre-ORR preparations.

BWXT Y-12
Scope: Restart of Enriched Uranium Operations
Link provided support to the restart of Enriched Uranium Operations (EUO) for Environmental Safety & Health
(ESH) disciplines with specific emphasis in areas of Conduct of Operations (COO) and Operational Readiness (OR).
This support encompassed Facility Safety, Fire Protection, Criticality Safety, Industrial Safety and Radiological
Controls that was effective and integrated into the Restart Planning for EUO. Link evaluated existing plans and
modified to specifically delineate needed controls, including activity-based startup processes.

 Monthly summary reports of progress and issues
 Written report of findings relative to the restart plans for EUO as the plans address ESH
 Written report of recommendations for inclusion in restart plans
125 TownPark Drive, Suite 300

Kennesaw, Georgia 30144

770-919-7070
Fluor Hanford
Scope: Operational Readiness and Review Support- W-460 Project
Provided Operational Readiness Review support as required by the SRID team member and assistant Team Leader
for the Fluor Hanford (FH) Material Packaging Project.
Provided technical support services to the FH Materials Packaging Project in determining the Readiness to Start Up
the W-460 Plutonium Stabilization, Handling and Packaging Project by the Plutonium Finishing Plant (PFP). The
work performed included the following task areas:

• Reviewed assigned functional areas contained in the Plan of Action.
• Assessed Organizational Effectiveness in establishing and implementing programs that
achieved compliance with applicable laws, regulations, DOE Orders, and FH
requirements.
• Prepared documentation of Identified Adverse Conditions, and assist in the preparation and
issuance of the Formal Assessment Reports.
• Provided other general support as requested.
• Provided Cost Estimating and Support Scheduling for the work scope.
The deliverables included:
1. Assisted ORR Team Leader in preparing for review,

2. Operational review (maximum 5 days in the field
3. Preparation of final report,
4. Preparation and presentation of readiness post-review briefings as requested and as needed
to support required presentation schedules as determined by FH Material Packaging
Project.
5. Project support. Any comments incorporated into the final deliverable.

BWXT Y-12
Scope: Infrastructure Reduction
Provided support for Infrastructure Reduction for activities associated with the readiness to complete the Argon
Glovebox activities. Provided a senior readiness team to the project manager to ensure 9206 is ready to declare goahead for an Operational Readiness Review (ORR) that was required by the National Nuclear Security
Administration (NNSA). Developed an Activity-based Readiness Process to ensure that 9206 is ready in all aspects.
Supported development and institutionalization of the Y-12 site-wide readiness process (this was the same process
that is being utilized in 9206). Provided senior advisor team for the readiness activities associated with Beta 2E and
the actions to recover from the unsuccessful Readiness Assessment. Status and progress reports provided to the
project managers for these activities.
Provided procedures and other documentation to institutionalize the processes.

125 TownPark Drive, Suite 300

Kennesaw, Georgia 30144

770-919-7070
Los Alamos National Labs (LANL)
Scope: Conduct of Operations
LANL was Implementing Conduct of Operations (DOE O 5480.19) in accordance with Conduct
of Operations Implementation Plan - Los Alamos National Laboratory (FWO-DO:O1-100), to support
implementation of this effort, LANL/FWO requested and Link provided the following technical support for FY02.
Assisted the effort to Implement Conduct of Operations (COO) at LANL in accordance with the ambitious schedule
in the Implementation Plan (IP), as specified below:
1. Provided Technical Assistance to Facilities in conducting the Gap Analysis and Implementation Verification
(COO IP WBS 2.2) as specified by the OIC for COO Implementation through the UTR.
2. Provided Technical Assistance to the OIC in completing the Institutional Gap Analysis (COO IP WBS 1.8) as
specified by the OIC for COO Implementation through the UTR.
3. Provided Technical Assistance in formulating specific Corrective Action Plans (CAPs) for gaps in the
institutional implementation of COO for entry into ITRAC (COO IP WBS 1.9) as specified by the OIC for COO
Implementation through the UTR
4. Provided Technical Assistance to the OIC in the Institutional Analysis of Facility Level Implementation (Step 5
of the COO Implementation Notice dtd July 17, 2001) (COO IP WBS x.y) as specified by the OIC for COO
Implementation through the UTR.

Fluor Hanford
Scope: Technical Support to SNF Construction Projects, including ORR
The contract supported the SNF Construction Projects, Project Director in the conduct of
the Operational Readiness Review as required by DOE Orders, including DOE 0 5480.31
and DOE 0 425.1, and guided by the associated DOE-STD-306-95. The contractor was
required to provide personnel with the technical knowledge, required security clearances,
and experience to meet the qualification requirements specified in DOE Order 5480.31
and DOE 0 425.1 for subject matter technical experts and senior members.
The contractor provided support to prepare the facility to complete their Operational
Readiness Review that complied with DOE policy that readiness reviews be conducted
prior to the startup or restart of DOE nuclear facilities. Provided additional technical
support services to the SNF Construction Projects and as deemed necessary by the
Project Director, SNF Construction Projects, in determining the effectiveness and the
degree of compliance with applicable laws, regulations, and DOE Orders contained in FH
manuals. The work included the following task areas:
A. Monitored the routine project operations with the intent to provide guidance for
improvements to safety, quality, and efficiency. Support is also provided for planning and
conducting nonroutine activities as necessary.
125 TownPark Drive, Suite 300

Kennesaw, Georgia 30144

770-919-7070
B. Interfaced with DOE-RL and FH project management regarding interpretation and
implementation of regulatory commitments and other directives.
C. Reviewed the SNF Construction Projects work for compliance, and verified status and
completion of performance incentives.
D. Provided oversight of work scope and performance monitoring as delegated from the SNF
Construction Projects, Project Director
E. Monitored vendors’ performance at vendor’s place of business, as directed by the SNF
Construction Project, Project Director
F. Notified the SNF Construction Projects, Project Director of any activities or practices
requiring either immediate or long-term corrective actions.
G. Prepared periodic reports of field monitoring and oversight activities as required by the
SNF Construction Projects, Project Director.
H. Provided coach/mentor technical support as needed by SNF Construction Projects.

Bechtel BWXT Idaho
Scope: OU 7-10 GEM Project, Operations Readiness Technical Services
The OU 7-10 Glovebox Excavator Method Project was breaking new ground in the early involvement of Operations.
Part of the project's operational philosophy was that preparations for the Management Self-Assessment (MSA) and
the Operational Readiness Review (ORR) should begin with the commencement of the project. In order to meet the
objective of an expedited, effective MSA and ORR, Operations required the services of a subcontractor.
Link facilitated, augmented, and audited all preparations for an expedited MSA and ORR. The primary objective of
this scope is to reduce operational risk and operational costs.
Link reported to and received direction from the Pit-9 (GEM) Operations Department Manager, providing expert
level technical services in the following areas:

 Provided expertise in nuclear plant start-up, especially as coupled with CERCLA
regulations.
 Conducted an extended, expert-level, independent audit of operational readiness to ensure
consistent and adequate progress.
 Assisted in the development of a Plan of Action required by Bechtel BWXT Idaho, LLC
(BBWI) MCP-2783.
 Assisted with managing MSA and ORR operational risks and document mitigating actions.
 Provided expertise to ensure that all MSA and ORR requirements are fulfilled, verified,
objectively documented, organized and controlled in a manner that demonstrates
accountability and supports an expedited MSA and ORR.
• Served as the ORR Team Leader, per appointment by the Pit-9 (GEM) Operations Manager.
Link provided level-of-effort technical services assistance in preparing all Operations MSA and ORR deliverables as
directed by the Pit-9 (GEM) Operations Manager.

125 TownPark Drive, Suite 300

Kennesaw, Georgia 30144

770-919-7070
Fluor
Scope: Startup Review Strategy for PFP Decommissioning
• Reviewed and updated Accelerated Decommissioning Plan including scope of work and
schedule.
• Reviewed current version of Startup Readiness (HNF-PRO-055).
• Develop and issue Startup Review Strategy for Accelerated PFP Decommissioning. The
strategy will support the accelerated project plan and be in full compliance with HNFPRO-055.
• The Startup Review Strategy will identify the type of review for a specific scope of work
such that all Decommissioning work is covered.
DELIVERABLES / SCHEDULE OR OBJECTIVE ACCEPTANCE CRITERIA

• Startup Review Strategy due January 17, 2003
• Startup Notification Technical Description and Score sheet for each identified startup due
January 17, 2003

LATA/Parallax Portsmouth, LLC (LPP)
Scope: Proposal Assistance, Transition Planning, and Transition Implementation
for the Portsmouth Gaseous Diffusion Facility
Background:
The Portsmouth Gaseous Diffusion Plant (part of the Portsmouth site) is a uranium enrichment plant that was
constructed in the mid 1950's and operated by the Department of Energy (DOE) and its predecessor agencies to
supply both high-and low-enriched uranium for defense purposes and commercial nuclear fuel sales. The uranium
enrichment program utilizing the gaseous diffusion process resulted in the generation of significant quantities of
radioactive, hazardous, and mixed waste, which is referred to as legacy waste, and other contaminants. Waste and
contaminants at the site include those regulated under the Resource Conservation and Recovery Act (RCRA), the
Toxic Substances Control Act (TSCA), and the Atomic Energy Act (AEA), including construction debris, sanitary
waste, hazardous waste (HW), radioactive low-level waste (LLW), and mixed low-level waste (MLLW).
LATA/Parallax Portsmouth developed and submitted a winning proposal to the Department of Energy in response to
Request for Proposal to replace the Bechtel Jacobs Company whose contract was expiring. The Scope included the
Clean Up and Remediation/Environmental Management Services at the Portsmouth Gaseous Diffusion Plant.

Link Scope:
In support of the requirements of LPP’ efforts to respond to DOE’s RFP and to execute the awarded contract:


Link provided an estimate of all employee and labor related transition costs in sufficient detail to be
included in the target cost of this contract. Provided support to LPP in determining other transition costs.
Proposed costs were broken down by the following major cost elements: direct labor (including labor

125 TownPark Drive, Suite 300

Kennesaw, Georgia 30144

770-919-7070
categories, and labor hours in each category), relocation, travel, materials, supplies, subcontracts, and all
other costs.


Link led the development of a Transition Plan, supported LPP to allow submittal within 3 days after any
award to LPP. Detail and scope had to be sufficient to meet the requirements of DOE. The objectives were:
(1) achieve an orderly transition; (2) be fair to incumbent employees and maintain a productive and flexible
work force; (3) minimize the cost of the transition and its impacts on other DOE programs; (4) promote
those practices which will result in stable collective bargaining relationships; (5) adhere to DOE’s
Workforce Restructuring Plan for the facility; (6) integrate ES&H into the transition phase to ensure safety
and regulatory compliance; and (7) ensure compliance with DOE’s Request for Proposal. The Plan had to
address LPP’s approach, methods and processes for the integration and interfaces with other contactors and
private corporations on site. This included LPP’s organizational structure, strategy and understanding of
respective site roles, methods of resolving disputes and addressing issues, and approach to transition
including continuation of remediation activities, seamless transition of human resources, and strategy for
assumption of the directed or any other subcontracts. It was also understood that Link’s main focus and
responsibility as it related to the Transition Plan was focused on employee and labor related transition
activities.
 Link managed the Transition Team during the transition period to ensure all Transition Objectives were
achieved while also ensuring transition costs incurred are allowable, allocable, and reasonable. Transition
Objectives can be summarized as:
o



Informing incumbent employees about the transition and various stages of the review and hiring
process through various means of communication
o Engaging Union Labor leadership to achieve mutual understanding early in the transition
o Achieving seamless transition of payroll and benefits
o Initiating alignment with DOE (PPPO and POOG) and other site contractors through a series of
meetings and MOUs to ensure clarity of interfaces, jurisdictions, protocols, and continuity of
support
o Maintaining tight accountability of nuclear material and the security of all site assets
o Preparing to maintain safety envelope for all facilities and operations
o Ensuring readiness to maintain compliance with DOE Orders, local, state, and federal regulations,
and all remediation requirements
o Transitioning (“blue-sheeting”) all existing Policies & Procedures (several thousands) to ensure
compliance while streamlining and adapting to a new culture
o Setting the stage for future rejuvenation of people and processes to achieve DOE objectives.
Link assisted LPP in conducting labor relations in accordance with applicable laws and DOE’s intent that
labor relations policies and practices reflect the best experience of American industry in aiming to achieve
the stable labor-management relations essential to successful accomplishment of DOE’s programs at
reasonable cost. Link provided assistance in recruiting, interviewing, and selecting the LPP staff.
Thereafter, Link provided ongoing labor relations and HR consultation and advice as needed.

125 TownPark Drive, Suite 300

Kennesaw, Georgia 30144

770-919-7070
U.S. Department of Energy, Golden Field Office
Scope: Technical Support re: Recovery Act - Demonstration of
Integrated Biorefinery Operations; Renewable Energy Research and
Development
Background:
The Department of Energy, Office of Energy Efficiency and Renewable Energy (EERE), announced a notice of
availability of funding for financial assistance from the Office of the Biomass Program. DOE was funding
biorefinery technology development projects to meet two of the EERE performance goals: 1) dramatically reduce, or
even end, dependence on imported oil; and 2) spur the creation of the domestic bio-industry. DOE solicited
participation from industry experts to review offerings from interested parties and select the technologies and
companies who presented the most credible proposals for a path forward to commercially viable projects.
Link Scope:
Link was selected by DOE to review multiple and competing Proposals for the construction
of pilot programs, demonstration projects, test plants, and/or commercial facilities that met
the above performance goals. Link subsequently provided its conclusions and technical
advice via participation in multi-disciplined teams chartered to select the winning offerings.
Link’s experience in the following technologies and projects was critical to its award as well as the credibility of its
technical advice during the project:













Municipal Solid Waste (burning, gasification, and/or cellulosic conversion to ethanol)
Vegetable oils (to biodiesel)
Animal oils (to biodiesel),
Forest floor waste (charcoal conversion),
Wood chips/prunings (burning and gasification),
Waste sludge from paper mills (ethanol conversion from cellulosic component),
Lignin (burning),
Sewage sludge (burning),
Black/green liquor (boilers),
Waste coal (burning and gasification),
Low-grade petroleum products (boilers, turbines, and reciprocating engines),
Biochemical Conversion/Processes such:
o Transesterification of oils into biodiesel,
o Cellulosic ethanol conversion (primarily strong/weak acid conversion, but some
enzyme/bacterial),
o Combustion in fluid bed and conventional boilers,
o Pretreatment (including MSW sorting, washing, drying, acid treatment, deacidification,
distillation, bleaching, storage, material handling, conveyance, etc.)

125 TownPark Drive, Suite 300

Kennesaw, Georgia 30144

770-919-7070
CONTACT INFORMATION


CEO:

Kirk D. Belmont

kbelmont@linkresources.com
Office:
+1 (770) 919-7070
Fax:
+1 (770) 919-9200


President: Gary A. Sanden
gsanden@linkresources.com
Office:
+1 (770) 919-7070
Fax:
+1 (770) 919-9200

125 TownPark Drive, Suite 300

Kennesaw, Georgia 30144

770-919-7070

More Related Content

What's hot

Consultancy brochure_Europe (final)
Consultancy brochure_Europe (final)Consultancy brochure_Europe (final)
Consultancy brochure_Europe (final)Anthony Davies
 
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTHOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTAlessandro Rinaldi
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in constructionKartikeya Pandey
 
Responsibilities as vice president projects at jacobs 1.9.16
Responsibilities as vice president projects at jacobs 1.9.16Responsibilities as vice president projects at jacobs 1.9.16
Responsibilities as vice president projects at jacobs 1.9.16Ravi Sharma
 
Recovery Scheduling
Recovery SchedulingRecovery Scheduling
Recovery SchedulingChris Carson
 
Lakshmi_Reddy_Resume
Lakshmi_Reddy_ResumeLakshmi_Reddy_Resume
Lakshmi_Reddy_ResumeLakshmi Reddy
 
Six Sigma BB Project Update
Six Sigma BB Project UpdateSix Sigma BB Project Update
Six Sigma BB Project Updatecybermetheus
 
Resume AshokHasija 2016Oct
Resume AshokHasija 2016OctResume AshokHasija 2016Oct
Resume AshokHasija 2016OctAshok Hasija
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-Alana Miles
 
Lisa Cole's Resume 2017
Lisa Cole's Resume 2017Lisa Cole's Resume 2017
Lisa Cole's Resume 2017Lisa Cole
 
Buchanan Resume Deputy Program Manager -Oct 16
Buchanan Resume Deputy Program Manager -Oct 16Buchanan Resume Deputy Program Manager -Oct 16
Buchanan Resume Deputy Program Manager -Oct 16R. Bruce Buchanan
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical CompletionsAndy Lang
 
2010 AACEi Great Debate - Approval of Schedule Revisions
2010 AACEi Great Debate - Approval of Schedule Revisions2010 AACEi Great Debate - Approval of Schedule Revisions
2010 AACEi Great Debate - Approval of Schedule RevisionsChris Carson
 

What's hot (17)

Consultancy brochure_Europe (final)
Consultancy brochure_Europe (final)Consultancy brochure_Europe (final)
Consultancy brochure_Europe (final)
 
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTHOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in construction
 
Schedule Review
Schedule ReviewSchedule Review
Schedule Review
 
commissioning c-3
commissioning c-3commissioning c-3
commissioning c-3
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
Responsibilities as vice president projects at jacobs 1.9.16
Responsibilities as vice president projects at jacobs 1.9.16Responsibilities as vice president projects at jacobs 1.9.16
Responsibilities as vice president projects at jacobs 1.9.16
 
Recovery Scheduling
Recovery SchedulingRecovery Scheduling
Recovery Scheduling
 
Lakshmi_Reddy_Resume
Lakshmi_Reddy_ResumeLakshmi_Reddy_Resume
Lakshmi_Reddy_Resume
 
Six Sigma BB Project Update
Six Sigma BB Project UpdateSix Sigma BB Project Update
Six Sigma BB Project Update
 
Resume AshokHasija 2016Oct
Resume AshokHasija 2016OctResume AshokHasija 2016Oct
Resume AshokHasija 2016Oct
 
CV_Alana Miles-2015-
CV_Alana Miles-2015-CV_Alana Miles-2015-
CV_Alana Miles-2015-
 
Lisa Cole's Resume 2017
Lisa Cole's Resume 2017Lisa Cole's Resume 2017
Lisa Cole's Resume 2017
 
Buchanan Resume Deputy Program Manager -Oct 16
Buchanan Resume Deputy Program Manager -Oct 16Buchanan Resume Deputy Program Manager -Oct 16
Buchanan Resume Deputy Program Manager -Oct 16
 
Revised.SOOFI_2016.A
Revised.SOOFI_2016.ARevised.SOOFI_2016.A
Revised.SOOFI_2016.A
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical Completions
 
2010 AACEi Great Debate - Approval of Schedule Revisions
2010 AACEi Great Debate - Approval of Schedule Revisions2010 AACEi Great Debate - Approval of Schedule Revisions
2010 AACEi Great Debate - Approval of Schedule Revisions
 

Viewers also liked

Energy Consulting SDVOSB Transition Planning
Energy Consulting SDVOSB Transition PlanningEnergy Consulting SDVOSB Transition Planning
Energy Consulting SDVOSB Transition PlanningLink Resources
 
Link Resources Past Performance Summaries
Link Resources Past Performance SummariesLink Resources Past Performance Summaries
Link Resources Past Performance SummariesLink Resources
 
5.2 pedoman teknis-agroindustri-horti
5.2 pedoman teknis-agroindustri-horti5.2 pedoman teknis-agroindustri-horti
5.2 pedoman teknis-agroindustri-hortiAndi Firman
 
Energy Consulting SDVOSB Transition Management
Energy Consulting SDVOSB Transition ManagementEnergy Consulting SDVOSB Transition Management
Energy Consulting SDVOSB Transition ManagementLink Resources
 
Energy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsEnergy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsLink Resources
 
Introducing DealCuaTui
Introducing DealCuaTuiIntroducing DealCuaTui
Introducing DealCuaTuivanductai
 
Energy Consulting SDVOSB Human Capital Management
Energy Consulting SDVOSB Human Capital ManagementEnergy Consulting SDVOSB Human Capital Management
Energy Consulting SDVOSB Human Capital ManagementLink Resources
 
Energy Consulting SDVOSB Sustain Industry
Energy Consulting SDVOSB Sustain IndustryEnergy Consulting SDVOSB Sustain Industry
Energy Consulting SDVOSB Sustain IndustryLink Resources
 
Energy Consulting SDVOSB Sustain Utility
Energy Consulting SDVOSB Sustain UtilityEnergy Consulting SDVOSB Sustain Utility
Energy Consulting SDVOSB Sustain UtilityLink Resources
 
Energy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement CorporateEnergy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement CorporateLink Resources
 
Telemarc Product Guide
Telemarc Product GuideTelemarc Product Guide
Telemarc Product GuideCharlie Stone
 
Final Presentation for Speedo HQ
Final Presentation for Speedo HQFinal Presentation for Speedo HQ
Final Presentation for Speedo HQCharlie Stone
 

Viewers also liked (16)

Harley-Davidson
Harley-DavidsonHarley-Davidson
Harley-Davidson
 
Energy Consulting SDVOSB Transition Planning
Energy Consulting SDVOSB Transition PlanningEnergy Consulting SDVOSB Transition Planning
Energy Consulting SDVOSB Transition Planning
 
Link Resources Past Performance Summaries
Link Resources Past Performance SummariesLink Resources Past Performance Summaries
Link Resources Past Performance Summaries
 
5.2 pedoman teknis-agroindustri-horti
5.2 pedoman teknis-agroindustri-horti5.2 pedoman teknis-agroindustri-horti
5.2 pedoman teknis-agroindustri-horti
 
Energy Consulting SDVOSB Transition Management
Energy Consulting SDVOSB Transition ManagementEnergy Consulting SDVOSB Transition Management
Energy Consulting SDVOSB Transition Management
 
Energy Consulting SDVOSB Projects
Energy Consulting SDVOSB ProjectsEnergy Consulting SDVOSB Projects
Energy Consulting SDVOSB Projects
 
Introducing DealCuaTui
Introducing DealCuaTuiIntroducing DealCuaTui
Introducing DealCuaTui
 
Energy Consulting SDVOSB Human Capital Management
Energy Consulting SDVOSB Human Capital ManagementEnergy Consulting SDVOSB Human Capital Management
Energy Consulting SDVOSB Human Capital Management
 
Energy Consulting SDVOSB Sustain Industry
Energy Consulting SDVOSB Sustain IndustryEnergy Consulting SDVOSB Sustain Industry
Energy Consulting SDVOSB Sustain Industry
 
Energy Consulting SDVOSB Sustain Utility
Energy Consulting SDVOSB Sustain UtilityEnergy Consulting SDVOSB Sustain Utility
Energy Consulting SDVOSB Sustain Utility
 
Energy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement CorporateEnergy Consulting SDVOSB Capability Statement Corporate
Energy Consulting SDVOSB Capability Statement Corporate
 
Romaničko slikarstvo
Romaničko slikarstvoRomaničko slikarstvo
Romaničko slikarstvo
 
Company
CompanyCompany
Company
 
Telemarc Product Guide
Telemarc Product GuideTelemarc Product Guide
Telemarc Product Guide
 
эок
эокэок
эок
 
Final Presentation for Speedo HQ
Final Presentation for Speedo HQFinal Presentation for Speedo HQ
Final Presentation for Speedo HQ
 

Similar to Energy Consulting SDVOSB DOE Experience

Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011tigcap
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011tigcap
 
Eric Zagata 10-10-2015 Resume_
Eric Zagata 10-10-2015 Resume_Eric Zagata 10-10-2015 Resume_
Eric Zagata 10-10-2015 Resume_Eric Zagata
 
Shannon's Resume Financial2
Shannon's Resume Financial2Shannon's Resume Financial2
Shannon's Resume Financial2Shannon Grice
 
Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01Jose Antonio de Jesus
 
Monitoring and evaluation1
Monitoring and evaluation1Monitoring and evaluation1
Monitoring and evaluation1PCPD Palestine
 
WBHigh Resume 2015-Rev 2
WBHigh Resume 2015-Rev 2WBHigh Resume 2015-Rev 2
WBHigh Resume 2015-Rev 2Bennie High
 
Monitor and Control Process Group - Part One
Monitor and Control Process Group - Part OneMonitor and Control Process Group - Part One
Monitor and Control Process Group - Part OneHossam Maghrabi
 
Resume Juvena Naidoo
Resume Juvena NaidooResume Juvena Naidoo
Resume Juvena NaidooJuvena Naidoo
 
Paul Capello Cerner Health Conference
Paul Capello Cerner Health ConferencePaul Capello Cerner Health Conference
Paul Capello Cerner Health Conferencetigcap
 
Paul Capello CHC 2010 Final
Paul Capello CHC 2010 FinalPaul Capello CHC 2010 Final
Paul Capello CHC 2010 Finaltigcap
 
Melanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CVMelanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CVMelanie Manalo
 
Joe Munoz Resume - Oct 2016 (Ops)
Joe Munoz Resume - Oct 2016 (Ops)Joe Munoz Resume - Oct 2016 (Ops)
Joe Munoz Resume - Oct 2016 (Ops)Joe Munoz
 
Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016Mohamed Sajid Maqba
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final reporthydrologywebsite1
 
Shanda Mattis Resume 1
Shanda Mattis Resume 1Shanda Mattis Resume 1
Shanda Mattis Resume 1shanda_mattis
 
Clemmie Crocker Resume 2-10-2017
Clemmie Crocker Resume  2-10-2017Clemmie Crocker Resume  2-10-2017
Clemmie Crocker Resume 2-10-2017Clemmie Crocker
 

Similar to Energy Consulting SDVOSB DOE Experience (20)

Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011
 
Capello Pw 2011
Capello Pw 2011Capello Pw 2011
Capello Pw 2011
 
Eric Zagata 10-10-2015 Resume_
Eric Zagata 10-10-2015 Resume_Eric Zagata 10-10-2015 Resume_
Eric Zagata 10-10-2015 Resume_
 
Shannon's Resume Financial2
Shannon's Resume Financial2Shannon's Resume Financial2
Shannon's Resume Financial2
 
Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01
 
Monitoring and evaluation1
Monitoring and evaluation1Monitoring and evaluation1
Monitoring and evaluation1
 
WBHigh Resume 2015-Rev 2
WBHigh Resume 2015-Rev 2WBHigh Resume 2015-Rev 2
WBHigh Resume 2015-Rev 2
 
Monitor and Control Process Group - Part One
Monitor and Control Process Group - Part OneMonitor and Control Process Group - Part One
Monitor and Control Process Group - Part One
 
Resume Juvena Naidoo
Resume Juvena NaidooResume Juvena Naidoo
Resume Juvena Naidoo
 
Paul Capello Cerner Health Conference
Paul Capello Cerner Health ConferencePaul Capello Cerner Health Conference
Paul Capello Cerner Health Conference
 
Paul Capello CHC 2010 Final
Paul Capello CHC 2010 FinalPaul Capello CHC 2010 Final
Paul Capello CHC 2010 Final
 
Melanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CVMelanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CV
 
Joe Munoz Resume - Oct 2016 (Ops)
Joe Munoz Resume - Oct 2016 (Ops)Joe Munoz Resume - Oct 2016 (Ops)
Joe Munoz Resume - Oct 2016 (Ops)
 
Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016Resume of Mohamed Sajid Maqba_2016
Resume of Mohamed Sajid Maqba_2016
 
James L Harris CV
James L Harris CVJames L Harris CV
James L Harris CV
 
JakeA_resume Oct14
JakeA_resume Oct14JakeA_resume Oct14
JakeA_resume Oct14
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final report
 
PMP PMBOK5 project management processes
PMP PMBOK5 project management processesPMP PMBOK5 project management processes
PMP PMBOK5 project management processes
 
Shanda Mattis Resume 1
Shanda Mattis Resume 1Shanda Mattis Resume 1
Shanda Mattis Resume 1
 
Clemmie Crocker Resume 2-10-2017
Clemmie Crocker Resume  2-10-2017Clemmie Crocker Resume  2-10-2017
Clemmie Crocker Resume 2-10-2017
 

More from Link Resources

Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...Link Resources
 
Energy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past PerformanceEnergy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past PerformanceLink Resources
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentLink Resources
 
Energy Consulting SDVOSB Nuclear
Energy Consulting SDVOSB NuclearEnergy Consulting SDVOSB Nuclear
Energy Consulting SDVOSB NuclearLink Resources
 
Energy Consulting SDVOSB NAICS Experience
Energy Consulting SDVOSB NAICS ExperienceEnergy Consulting SDVOSB NAICS Experience
Energy Consulting SDVOSB NAICS ExperienceLink Resources
 
Energy Consulting SDVOSB Merger Acquisition Planning
Energy Consulting SDVOSB Merger Acquisition PlanningEnergy Consulting SDVOSB Merger Acquisition Planning
Energy Consulting SDVOSB Merger Acquisition PlanningLink Resources
 
Energy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceEnergy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceLink Resources
 
Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013Link Resources
 
Link Resources Nuclear Energy
Link Resources Nuclear EnergyLink Resources Nuclear Energy
Link Resources Nuclear EnergyLink Resources
 
Link Resources NAICS Experience
Link Resources NAICS ExperienceLink Resources NAICS Experience
Link Resources NAICS ExperienceLink Resources
 

More from Link Resources (10)

Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
Link Resources exhibiting at Tennessee Valley Authority’s 3rd Annual Supplier...
 
Energy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past PerformanceEnergy Consulting SDVOSB Past Performance
Energy Consulting SDVOSB Past Performance
 
Energy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational AssessmentEnergy Consulting SDVOSB Organizational Assessment
Energy Consulting SDVOSB Organizational Assessment
 
Energy Consulting SDVOSB Nuclear
Energy Consulting SDVOSB NuclearEnergy Consulting SDVOSB Nuclear
Energy Consulting SDVOSB Nuclear
 
Energy Consulting SDVOSB NAICS Experience
Energy Consulting SDVOSB NAICS ExperienceEnergy Consulting SDVOSB NAICS Experience
Energy Consulting SDVOSB NAICS Experience
 
Energy Consulting SDVOSB Merger Acquisition Planning
Energy Consulting SDVOSB Merger Acquisition PlanningEnergy Consulting SDVOSB Merger Acquisition Planning
Energy Consulting SDVOSB Merger Acquisition Planning
 
Energy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel ExperienceEnergy Consulting SDVOSB Biofuel Experience
Energy Consulting SDVOSB Biofuel Experience
 
Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013Link Resources Capabilities Statement 2013
Link Resources Capabilities Statement 2013
 
Link Resources Nuclear Energy
Link Resources Nuclear EnergyLink Resources Nuclear Energy
Link Resources Nuclear Energy
 
Link Resources NAICS Experience
Link Resources NAICS ExperienceLink Resources NAICS Experience
Link Resources NAICS Experience
 

Recently uploaded

Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 

Recently uploaded (20)

Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 

Energy Consulting SDVOSB DOE Experience

  • 1. LINK RESOURCES INC. DOE Experience The following are examples of Link's experience for DOE, DOE Labs, or major DOE contractors: Los Alamos National Lab (LANL) Scope: Formality of Operations Support in the NMSM-SMF Program Office Provided support in the NMSM-SMF Program Office in the Formality of Operations programs at all Stockpile Management Facilities (CMR, TA-55, TA-18, WETF, and SIGMA). Work included support of the CMR resumption activities, Operability Assessments development of Corrective Action Plans, and implementation. Supported the following areas: LINK ACTIVITIES IN THE FOLLOWING PROGRAMS  Analysis and Assessment  Quality Management Systems  Planning & Reviews  Safety Systems  Training  Facility Safety Basis  ISM Implementation  Work Authorization  Reporting and Issue Resolution  Work Control  Developing/Using Quality Management System Tools  Conduct of Operations Activities also included support of Readiness Assessments, Operational Readiness Reviews, Performance Assurance, Corrective Action Planning and Implementation assurance, and support to Program Management processes including DOE interface, prioritization of activities and problem resolution. Prepared draft materials and stand-alone reports to support CMR resumption activities and Operability Assessments. In addition, deliverables defined by LANL included analyses, calculations, review comments, monthly status reports, and participation in LANL meetings and processes such as quality improvement teams. Assisted or developed and implemented specific training packages as requested. Assisted in the development of the Safety Assessment Plan for CMR Facility Operations. 125 TownPark Drive, Suite 300 Kennesaw, Georgia 30144 770-919-7070
  • 2. Idaho Nuclear Technology and Engineering Center (INTEC) Scope: Technical Service Support for INTEC Compliance 1. Introduction The Idaho Nuclear Technology and Engineering Center (INTEC) required technical experts to assess/verify Conduct of Operations and compliance issues at INTEC. Link evaluated Conduct of Operations implementation and Procedure Compliance to define areas for improvement and readiness for ISMS Phase II verification. Also evaluated the necessary organizational and/or cultural changes that needed to take place to ensure INTEC operated efficiently and in compliance with applicable laws, regulations, and DOE Orders. 2. Scope/Technical Requirements Link provided support to the INTEC Site Area Director, Site Area Deputy Director, and supporting managers. Link efforts included the following task areas: • Monitored operations at INTEC with the intent to provide guidance for improvements to Conduct of Operations, communication, compliance, safety, quality, and efficiency. • Interfaced with BBWI management at INTEC regarding interpretation, effectiveness, and degree of compliance with respect to procedure requirements and other directives. • Reviewed work at INTEC for compliance, and verify status and completion of performance agreements, corrective actions, and procedure compliance. • Provided oversight of work scope at INTEC and monitor performance. • Selected Oversight Responsibilities will be delegated by the INTEC SAD. 3. Deliverables: Link provided INTEC with the following: • On-site subject matter participation, as requested by the INTEC Site Area Director. • Monthly compliance status reports to include identification of issues, recommended action plans, and final issue resolution. 125 TownPark Drive, Suite 300 Kennesaw, Georgia 30144 770-919-7070
  • 3. Fluor Scope: Technical Support as SNF Project Coach/Mentor for Operational Readiness Review l. Provided support for the FH SNF for Operational Readiness Review (ORR) support as the Coach Mentor. 2. Provided technical support services to the FH Office of the President in determining the effectiveness and the degree of compliance by the Spent Nuclear Fuels Project with applicable laws, regulations, and DOE Orders contained in FH manuals. The work was performed through the following task areas: • Monitored the routine project operations with the intent to provide guidance for improvements to safety, quality, and efficiency. Support IS also provided for planning and conducting non-routine activities as necessary. • Interfaced with DOE-RL and project management regarding interpretation and implementation of regulatory commitments and other directives. • Reviewed the project work for compliance, and verify status and completion of performance agreements, Corrective Actions, and milestones. • Provided Oversight of work scope and Performance Monitoring. Select oversight responsibilities may be delegated from the FH Project Support Vice President. • Integrated subproject activities within project by facilitating effective communications and resolving issues among projects, ES&H, PHMC support organizations, management, and DOE-RL clients. • Provided the FH Office of the President with a field presence for project activities and processes related to maintenance, operation, startup, and shutdown, • Notified the FH Office of the President of any activities or practices requiring either immediate or long-term corrective actions. Prepare periodic reports of field monitoring and oversight activities as required by the FH Chief Operating Officer • Readiness Support: Provide Coach/Mentoring to the facility for pre-ORR preparations. BWXT Y-12 Scope: Restart of Enriched Uranium Operations Link provided support to the restart of Enriched Uranium Operations (EUO) for Environmental Safety & Health (ESH) disciplines with specific emphasis in areas of Conduct of Operations (COO) and Operational Readiness (OR). This support encompassed Facility Safety, Fire Protection, Criticality Safety, Industrial Safety and Radiological Controls that was effective and integrated into the Restart Planning for EUO. Link evaluated existing plans and modified to specifically delineate needed controls, including activity-based startup processes.  Monthly summary reports of progress and issues  Written report of findings relative to the restart plans for EUO as the plans address ESH  Written report of recommendations for inclusion in restart plans 125 TownPark Drive, Suite 300 Kennesaw, Georgia 30144 770-919-7070
  • 4. Fluor Hanford Scope: Operational Readiness and Review Support- W-460 Project Provided Operational Readiness Review support as required by the SRID team member and assistant Team Leader for the Fluor Hanford (FH) Material Packaging Project. Provided technical support services to the FH Materials Packaging Project in determining the Readiness to Start Up the W-460 Plutonium Stabilization, Handling and Packaging Project by the Plutonium Finishing Plant (PFP). The work performed included the following task areas: • Reviewed assigned functional areas contained in the Plan of Action. • Assessed Organizational Effectiveness in establishing and implementing programs that achieved compliance with applicable laws, regulations, DOE Orders, and FH requirements. • Prepared documentation of Identified Adverse Conditions, and assist in the preparation and issuance of the Formal Assessment Reports. • Provided other general support as requested. • Provided Cost Estimating and Support Scheduling for the work scope. The deliverables included: 1. Assisted ORR Team Leader in preparing for review, 2. Operational review (maximum 5 days in the field 3. Preparation of final report, 4. Preparation and presentation of readiness post-review briefings as requested and as needed to support required presentation schedules as determined by FH Material Packaging Project. 5. Project support. Any comments incorporated into the final deliverable. BWXT Y-12 Scope: Infrastructure Reduction Provided support for Infrastructure Reduction for activities associated with the readiness to complete the Argon Glovebox activities. Provided a senior readiness team to the project manager to ensure 9206 is ready to declare goahead for an Operational Readiness Review (ORR) that was required by the National Nuclear Security Administration (NNSA). Developed an Activity-based Readiness Process to ensure that 9206 is ready in all aspects. Supported development and institutionalization of the Y-12 site-wide readiness process (this was the same process that is being utilized in 9206). Provided senior advisor team for the readiness activities associated with Beta 2E and the actions to recover from the unsuccessful Readiness Assessment. Status and progress reports provided to the project managers for these activities. Provided procedures and other documentation to institutionalize the processes. 125 TownPark Drive, Suite 300 Kennesaw, Georgia 30144 770-919-7070
  • 5. Los Alamos National Labs (LANL) Scope: Conduct of Operations LANL was Implementing Conduct of Operations (DOE O 5480.19) in accordance with Conduct of Operations Implementation Plan - Los Alamos National Laboratory (FWO-DO:O1-100), to support implementation of this effort, LANL/FWO requested and Link provided the following technical support for FY02. Assisted the effort to Implement Conduct of Operations (COO) at LANL in accordance with the ambitious schedule in the Implementation Plan (IP), as specified below: 1. Provided Technical Assistance to Facilities in conducting the Gap Analysis and Implementation Verification (COO IP WBS 2.2) as specified by the OIC for COO Implementation through the UTR. 2. Provided Technical Assistance to the OIC in completing the Institutional Gap Analysis (COO IP WBS 1.8) as specified by the OIC for COO Implementation through the UTR. 3. Provided Technical Assistance in formulating specific Corrective Action Plans (CAPs) for gaps in the institutional implementation of COO for entry into ITRAC (COO IP WBS 1.9) as specified by the OIC for COO Implementation through the UTR 4. Provided Technical Assistance to the OIC in the Institutional Analysis of Facility Level Implementation (Step 5 of the COO Implementation Notice dtd July 17, 2001) (COO IP WBS x.y) as specified by the OIC for COO Implementation through the UTR. Fluor Hanford Scope: Technical Support to SNF Construction Projects, including ORR The contract supported the SNF Construction Projects, Project Director in the conduct of the Operational Readiness Review as required by DOE Orders, including DOE 0 5480.31 and DOE 0 425.1, and guided by the associated DOE-STD-306-95. The contractor was required to provide personnel with the technical knowledge, required security clearances, and experience to meet the qualification requirements specified in DOE Order 5480.31 and DOE 0 425.1 for subject matter technical experts and senior members. The contractor provided support to prepare the facility to complete their Operational Readiness Review that complied with DOE policy that readiness reviews be conducted prior to the startup or restart of DOE nuclear facilities. Provided additional technical support services to the SNF Construction Projects and as deemed necessary by the Project Director, SNF Construction Projects, in determining the effectiveness and the degree of compliance with applicable laws, regulations, and DOE Orders contained in FH manuals. The work included the following task areas: A. Monitored the routine project operations with the intent to provide guidance for improvements to safety, quality, and efficiency. Support is also provided for planning and conducting nonroutine activities as necessary. 125 TownPark Drive, Suite 300 Kennesaw, Georgia 30144 770-919-7070
  • 6. B. Interfaced with DOE-RL and FH project management regarding interpretation and implementation of regulatory commitments and other directives. C. Reviewed the SNF Construction Projects work for compliance, and verified status and completion of performance incentives. D. Provided oversight of work scope and performance monitoring as delegated from the SNF Construction Projects, Project Director E. Monitored vendors’ performance at vendor’s place of business, as directed by the SNF Construction Project, Project Director F. Notified the SNF Construction Projects, Project Director of any activities or practices requiring either immediate or long-term corrective actions. G. Prepared periodic reports of field monitoring and oversight activities as required by the SNF Construction Projects, Project Director. H. Provided coach/mentor technical support as needed by SNF Construction Projects. Bechtel BWXT Idaho Scope: OU 7-10 GEM Project, Operations Readiness Technical Services The OU 7-10 Glovebox Excavator Method Project was breaking new ground in the early involvement of Operations. Part of the project's operational philosophy was that preparations for the Management Self-Assessment (MSA) and the Operational Readiness Review (ORR) should begin with the commencement of the project. In order to meet the objective of an expedited, effective MSA and ORR, Operations required the services of a subcontractor. Link facilitated, augmented, and audited all preparations for an expedited MSA and ORR. The primary objective of this scope is to reduce operational risk and operational costs. Link reported to and received direction from the Pit-9 (GEM) Operations Department Manager, providing expert level technical services in the following areas:  Provided expertise in nuclear plant start-up, especially as coupled with CERCLA regulations.  Conducted an extended, expert-level, independent audit of operational readiness to ensure consistent and adequate progress.  Assisted in the development of a Plan of Action required by Bechtel BWXT Idaho, LLC (BBWI) MCP-2783.  Assisted with managing MSA and ORR operational risks and document mitigating actions.  Provided expertise to ensure that all MSA and ORR requirements are fulfilled, verified, objectively documented, organized and controlled in a manner that demonstrates accountability and supports an expedited MSA and ORR. • Served as the ORR Team Leader, per appointment by the Pit-9 (GEM) Operations Manager. Link provided level-of-effort technical services assistance in preparing all Operations MSA and ORR deliverables as directed by the Pit-9 (GEM) Operations Manager. 125 TownPark Drive, Suite 300 Kennesaw, Georgia 30144 770-919-7070
  • 7. Fluor Scope: Startup Review Strategy for PFP Decommissioning • Reviewed and updated Accelerated Decommissioning Plan including scope of work and schedule. • Reviewed current version of Startup Readiness (HNF-PRO-055). • Develop and issue Startup Review Strategy for Accelerated PFP Decommissioning. The strategy will support the accelerated project plan and be in full compliance with HNFPRO-055. • The Startup Review Strategy will identify the type of review for a specific scope of work such that all Decommissioning work is covered. DELIVERABLES / SCHEDULE OR OBJECTIVE ACCEPTANCE CRITERIA • Startup Review Strategy due January 17, 2003 • Startup Notification Technical Description and Score sheet for each identified startup due January 17, 2003 LATA/Parallax Portsmouth, LLC (LPP) Scope: Proposal Assistance, Transition Planning, and Transition Implementation for the Portsmouth Gaseous Diffusion Facility Background: The Portsmouth Gaseous Diffusion Plant (part of the Portsmouth site) is a uranium enrichment plant that was constructed in the mid 1950's and operated by the Department of Energy (DOE) and its predecessor agencies to supply both high-and low-enriched uranium for defense purposes and commercial nuclear fuel sales. The uranium enrichment program utilizing the gaseous diffusion process resulted in the generation of significant quantities of radioactive, hazardous, and mixed waste, which is referred to as legacy waste, and other contaminants. Waste and contaminants at the site include those regulated under the Resource Conservation and Recovery Act (RCRA), the Toxic Substances Control Act (TSCA), and the Atomic Energy Act (AEA), including construction debris, sanitary waste, hazardous waste (HW), radioactive low-level waste (LLW), and mixed low-level waste (MLLW). LATA/Parallax Portsmouth developed and submitted a winning proposal to the Department of Energy in response to Request for Proposal to replace the Bechtel Jacobs Company whose contract was expiring. The Scope included the Clean Up and Remediation/Environmental Management Services at the Portsmouth Gaseous Diffusion Plant. Link Scope: In support of the requirements of LPP’ efforts to respond to DOE’s RFP and to execute the awarded contract:  Link provided an estimate of all employee and labor related transition costs in sufficient detail to be included in the target cost of this contract. Provided support to LPP in determining other transition costs. Proposed costs were broken down by the following major cost elements: direct labor (including labor 125 TownPark Drive, Suite 300 Kennesaw, Georgia 30144 770-919-7070
  • 8. categories, and labor hours in each category), relocation, travel, materials, supplies, subcontracts, and all other costs.  Link led the development of a Transition Plan, supported LPP to allow submittal within 3 days after any award to LPP. Detail and scope had to be sufficient to meet the requirements of DOE. The objectives were: (1) achieve an orderly transition; (2) be fair to incumbent employees and maintain a productive and flexible work force; (3) minimize the cost of the transition and its impacts on other DOE programs; (4) promote those practices which will result in stable collective bargaining relationships; (5) adhere to DOE’s Workforce Restructuring Plan for the facility; (6) integrate ES&H into the transition phase to ensure safety and regulatory compliance; and (7) ensure compliance with DOE’s Request for Proposal. The Plan had to address LPP’s approach, methods and processes for the integration and interfaces with other contactors and private corporations on site. This included LPP’s organizational structure, strategy and understanding of respective site roles, methods of resolving disputes and addressing issues, and approach to transition including continuation of remediation activities, seamless transition of human resources, and strategy for assumption of the directed or any other subcontracts. It was also understood that Link’s main focus and responsibility as it related to the Transition Plan was focused on employee and labor related transition activities.  Link managed the Transition Team during the transition period to ensure all Transition Objectives were achieved while also ensuring transition costs incurred are allowable, allocable, and reasonable. Transition Objectives can be summarized as: o  Informing incumbent employees about the transition and various stages of the review and hiring process through various means of communication o Engaging Union Labor leadership to achieve mutual understanding early in the transition o Achieving seamless transition of payroll and benefits o Initiating alignment with DOE (PPPO and POOG) and other site contractors through a series of meetings and MOUs to ensure clarity of interfaces, jurisdictions, protocols, and continuity of support o Maintaining tight accountability of nuclear material and the security of all site assets o Preparing to maintain safety envelope for all facilities and operations o Ensuring readiness to maintain compliance with DOE Orders, local, state, and federal regulations, and all remediation requirements o Transitioning (“blue-sheeting”) all existing Policies & Procedures (several thousands) to ensure compliance while streamlining and adapting to a new culture o Setting the stage for future rejuvenation of people and processes to achieve DOE objectives. Link assisted LPP in conducting labor relations in accordance with applicable laws and DOE’s intent that labor relations policies and practices reflect the best experience of American industry in aiming to achieve the stable labor-management relations essential to successful accomplishment of DOE’s programs at reasonable cost. Link provided assistance in recruiting, interviewing, and selecting the LPP staff. Thereafter, Link provided ongoing labor relations and HR consultation and advice as needed. 125 TownPark Drive, Suite 300 Kennesaw, Georgia 30144 770-919-7070
  • 9. U.S. Department of Energy, Golden Field Office Scope: Technical Support re: Recovery Act - Demonstration of Integrated Biorefinery Operations; Renewable Energy Research and Development Background: The Department of Energy, Office of Energy Efficiency and Renewable Energy (EERE), announced a notice of availability of funding for financial assistance from the Office of the Biomass Program. DOE was funding biorefinery technology development projects to meet two of the EERE performance goals: 1) dramatically reduce, or even end, dependence on imported oil; and 2) spur the creation of the domestic bio-industry. DOE solicited participation from industry experts to review offerings from interested parties and select the technologies and companies who presented the most credible proposals for a path forward to commercially viable projects. Link Scope: Link was selected by DOE to review multiple and competing Proposals for the construction of pilot programs, demonstration projects, test plants, and/or commercial facilities that met the above performance goals. Link subsequently provided its conclusions and technical advice via participation in multi-disciplined teams chartered to select the winning offerings. Link’s experience in the following technologies and projects was critical to its award as well as the credibility of its technical advice during the project:             Municipal Solid Waste (burning, gasification, and/or cellulosic conversion to ethanol) Vegetable oils (to biodiesel) Animal oils (to biodiesel), Forest floor waste (charcoal conversion), Wood chips/prunings (burning and gasification), Waste sludge from paper mills (ethanol conversion from cellulosic component), Lignin (burning), Sewage sludge (burning), Black/green liquor (boilers), Waste coal (burning and gasification), Low-grade petroleum products (boilers, turbines, and reciprocating engines), Biochemical Conversion/Processes such: o Transesterification of oils into biodiesel, o Cellulosic ethanol conversion (primarily strong/weak acid conversion, but some enzyme/bacterial), o Combustion in fluid bed and conventional boilers, o Pretreatment (including MSW sorting, washing, drying, acid treatment, deacidification, distillation, bleaching, storage, material handling, conveyance, etc.) 125 TownPark Drive, Suite 300 Kennesaw, Georgia 30144 770-919-7070
  • 10. CONTACT INFORMATION  CEO: Kirk D. Belmont kbelmont@linkresources.com Office: +1 (770) 919-7070 Fax: +1 (770) 919-9200  President: Gary A. Sanden gsanden@linkresources.com Office: +1 (770) 919-7070 Fax: +1 (770) 919-9200 125 TownPark Drive, Suite 300 Kennesaw, Georgia 30144 770-919-7070