SlideShare a Scribd company logo
1 of 22
1
1. History Of Indian Railway 
2. Types of Traction System 
3. Non Electric traction system coaches 
4. System Of Track Electrification 
5. Power Supply For Jaipur Railway Station 
6. Control Panel 
7. AC generator 
8. Single Line Diagram of non AC coaches 
9. AC System and AC coaches load. 
10. Major Equipments. 
11. Conclusion. 
. 
2
 Railway was introduced in madras in 1832. First train in Indian 
Railway between Mumbai to Thana on 16th April 1853.Now 17 
zones in Indian Railway one is NWR Jaipur and Jaipur Junction 
established in 1875 and in 2002 it made a NWR zone . 
 One of India’s most famous and luxurious train The Palace On 
Wheels stop at Jaipur. 
 Indian railway is second biggest electrified system in the world 
after Russia. In India 21,000KM of total routes are electrified. 
3
System of Traction : 
1. Non Electric traction system 
Ex. Direct steam engine drive. 
2. Electric traction system. 
a) Self-contained locomotives. 
b) Electric Vehicle fed from distribution networks. 
4
 Advantages and Disadvantages of non electric traction system 
over electric traction system- 
 Advantages : Disadvantages : 
1. Capital cost. 1. Cleanliness. 
2. Failure of power. 2. Starting time. 
3. Interference to communication lines. 3. Braking. 
4. Limitation. 4. limitation of fuel. 
5. Problem of Regeration. 5. Maintenance cost. 
5
6
 On the self generating two tier air conditioned coaches, Chair cars 
and compressor coaches, 2 brush less alternators of 18 KW capacities 
each provided. 
 The DC outputs from the two alternators are paralleled with the 
battery. 
 In mid on generating coaches usually 30KVA brush less alternator 
used and generation is at 415V,3-phase,50 cycles. And in EOG 
coaches power at 750VAC or 415VAC stepped down 110VAC. 
 Express trains having heavy load use EOG coaches. Both EOG and 
MOG coaches the lights and fan are operated 110VAC. 
7
Alternator RRU & ERRU 
Inverter Battery Bank 
Power Pannel 
Control Pannel 
Equipments 
AC Plant
 The track electrification system are categorized into: 
1. DC system. 
2. Single phase AC system. 
3. Three phase AC system. 
4. Composite system 
a) Single phase-Three phase system. 
b) Single phase-Direct current system. 
9
 The electrical power supplies arrangement for the station: 
 Light , fan , LED display and other electrical equipment. 
 To junction offices, DRM office and railway colonies. 
 The panels are: 
o Loco colony panel. 
o Station panel. 
o Ganpati nagar panel. 
10
11
12
13
14 
Motor types used in AC 
Name of 
Motor 
Coaches 
Motor 
Ratings 
No. of 
Motors 
Blower 1.5 HP 1 
Compressor 7 HP 2 
Condenser 1.5 HP 2
 Brushless Alternators : - 
 Induction type Alternators used in non AC coaches are 
4.5KW/37.5A/120V DC.18KW 2 unit in parallel with 
RRU,battery, brush less alternators are used on AC 
coaches. 
 The brushless alternator with the help of static rectifier cum 
regulator unit is capable of developing voltage from 
minimum speed to maximum speed. 
. 15
 Rectifier Cum Regulator Unit : - 
 RRU is connected just beside the alternator to rectify the output of 
the generator. 
 A magnetic amplifier is connected which convert the 3-phase input to 
110V DC 
 A safety fuse of 10amp is connected to prevent the RRU box from 
abnormal conditions. 
 The RRU has following functions: 
1. To rectify the 3-phase AC output of the alternator through DC full wave bridge rectifier. 
2. Regulator the voltage generated by the alternator at the set value. 
3. Regulating the output current. 
16
 Battery and Battery Charging Terminals: - 
 The output of the RRU is given to battery box to charge the battery . 
 In a non AC coaches a battery box consist of 18 cells(6V/120Ah 
each) ,In AC coaches 2 battery box 56 cells(2V/1100Ah each) used. 
 BCT is provided for external charging of the batteries at stations or 
maintenance lines. 
 Used Battery in train is VRLA (Valve Regulated Lead Acid) types 
advantages - 
1. Topping up with water is not required. 
2. Periodical checking of specific gravity is not required. 
3. Regular maintenance to avoid sulphation of terminals and connections not required. 
17
 Rotary Junction Box : - 
 Rotary Junction Box is provided inside the coaches. 
 It is used to arrange and control the power supply to various 
circuit of the coaches (e.g. light, fan) with the help of rotary 
switches and HRC fuses. 
 4 Rotary switches are connected in Rotary Junction Box: 
1. The first switch is used to supply 70% light load in coach. 
2. The second switch is used to supply 30% light load in coach. 
3. . The third switch is used to supply fan load in coach. 
4. The fourth switch is known as EFT switch. 
18
 Fluorescent Tube Light : - 
 It is a 2 feet long,18 Watt fluorescent tube light provided in 
the coach for the sitting gallery light and 11watt for toilet 
light. 
 It works at 110V DC supply. 
 It gives good light with 30% and 70% power supply. 
19
 Emergency Feed Terminals : - 
 It is provided at the both end of the coach to feed the 
additional supply to the adjacent coach in case of 
emergency. 
 Supply from the healthy coach may be extended to 
him/dark coach by connecting wire(1.5x2 meter) for supply 
to the positive and negative terminals of the EFT. 
20
21
22

More Related Content

What's hot

Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineeringYogesh Jadoun
 
Summer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfSummer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfAbhisheksamal22
 
Electric Traction System
Electric  Traction  SystemElectric  Traction  System
Electric Traction Systemsahotaharman
 
Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)shovandey07
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting bookfiroj shaik
 
Electric Traction
Electric TractionElectric Traction
Electric TractionNawaz Nz
 
Gorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training reportGorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training reportGALGOTIAS UNIVERSITY
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiPrabjeet Singh
 
Diesel locomotive
Diesel locomotiveDiesel locomotive
Diesel locomotiveCyber4Tech
 
Summer training report on electric loco shed
Summer training report on electric loco shedSummer training report on electric loco shed
Summer training report on electric loco shedTarang Mittal
 
Northern railway
Northern railwayNorthern railway
Northern railwaysometech
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final studentsPiyush Saini
 
Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadVishal Dubey
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-systemMasterhead Jack
 
Indian railway final report
Indian railway  final reportIndian railway  final report
Indian railway final reportashwani kumar
 

What's hot (20)

Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineering
 
Summer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfSummer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdf
 
electric traction
electric tractionelectric traction
electric traction
 
Electric Traction System
Electric  Traction  SystemElectric  Traction  System
Electric Traction System
 
Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting book
 
Electric Traction
Electric TractionElectric Traction
Electric Traction
 
Gorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training reportGorakhpur mechanical workshop summer training report
Gorakhpur mechanical workshop summer training report
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
Railway training
Railway trainingRailway training
Railway training
 
6 train lighting
6 train lighting6 train lighting
6 train lighting
 
Diesel locomotive
Diesel locomotiveDiesel locomotive
Diesel locomotive
 
Summer training report on electric loco shed
Summer training report on electric loco shedSummer training report on electric loco shed
Summer training report on electric loco shed
 
Northern railway
Northern railwayNorthern railway
Northern railway
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final students
 
Sandeep
SandeepSandeep
Sandeep
 
Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, Ghaziabad
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-system
 
Indian railway final report
Indian railway  final reportIndian railway  final report
Indian railway final report
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 

Similar to NWR summer training ppt

ppt of summer traning nwr jaipur
ppt of summer traning nwr jaipurppt of summer traning nwr jaipur
ppt of summer traning nwr jaipur7597861730
 
Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)shovandey07
 
Railway coaches
Railway coachesRailway coaches
Railway coachesnoor patel
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)99sunilkumar
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPURShivesh Ranjan
 
electriclocomotive-180426201206.pdf
electriclocomotive-180426201206.pdfelectriclocomotive-180426201206.pdf
electriclocomotive-180426201206.pdfVara Prasad
 
Electric locomotive ppt
Electric locomotive pptElectric locomotive ppt
Electric locomotive pptSubhash kumar
 
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhiyoy18481
 
AWPnMNai2WYl8BLH499.pptx
AWPnMNai2WYl8BLH499.pptxAWPnMNai2WYl8BLH499.pptx
AWPnMNai2WYl8BLH499.pptxVishuBaniyan
 
Electric traction
Electric tractionElectric traction
Electric tractionManish Sahu
 
electric locomotive
electric locomotiveelectric locomotive
electric locomotivesiva1501
 
Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Deo Nath Jha
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railwayssuresh shindhe
 
Electric traction
Electric tractionElectric traction
Electric tractionDipak Meher
 
Noida Metro Rail Corporation
Noida Metro Rail CorporationNoida Metro Rail Corporation
Noida Metro Rail CorporationAnkit Chaudhary
 
Utilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdfUtilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdfhomanathmore
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-systembabu yadav
 

Similar to NWR summer training ppt (20)

ppt of summer traning nwr jaipur
ppt of summer traning nwr jaipurppt of summer traning nwr jaipur
ppt of summer traning nwr jaipur
 
Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)
 
Railway coaches
Railway coachesRailway coaches
Railway coaches
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
 
electriclocomotive-180426201206.pdf
electriclocomotive-180426201206.pdfelectriclocomotive-180426201206.pdf
electriclocomotive-180426201206.pdf
 
Electric locomotive ppt
Electric locomotive pptElectric locomotive ppt
Electric locomotive ppt
 
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
 
AWPnMNai2WYl8BLH499.pptx
AWPnMNai2WYl8BLH499.pptxAWPnMNai2WYl8BLH499.pptx
AWPnMNai2WYl8BLH499.pptx
 
Electric traction
Electric tractionElectric traction
Electric traction
 
electric locomotive
electric locomotiveelectric locomotive
electric locomotive
 
Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)Chittaranjan locomotive works (Summer Training Report)
Chittaranjan locomotive works (Summer Training Report)
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Bharat singh 1
Bharat singh 1Bharat singh 1
Bharat singh 1
 
Noida Metro Rail Corporation
Noida Metro Rail CorporationNoida Metro Rail Corporation
Noida Metro Rail Corporation
 
Utilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdfUtilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdf
 
Main Parts of Electric Locomotive
Main Parts of Electric LocomotiveMain Parts of Electric Locomotive
Main Parts of Electric Locomotive
 
Chic export company_catalogue
Chic export company_catalogueChic export company_catalogue
Chic export company_catalogue
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-system
 

Recently uploaded

Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMMchpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMMNanaAgyeman13
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxNiranjanYadav41
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Cooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptxCooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptxmamansuratman0253
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 

Recently uploaded (20)

Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMMchpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
chpater16.pptxMMMMMMMMMMMMMMMMMMMMMMMMMMM
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Cooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptxCooling Tower SERD pH drop issue (11 April 2024) .pptx
Cooling Tower SERD pH drop issue (11 April 2024) .pptx
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 

NWR summer training ppt

  • 1. 1
  • 2. 1. History Of Indian Railway 2. Types of Traction System 3. Non Electric traction system coaches 4. System Of Track Electrification 5. Power Supply For Jaipur Railway Station 6. Control Panel 7. AC generator 8. Single Line Diagram of non AC coaches 9. AC System and AC coaches load. 10. Major Equipments. 11. Conclusion. . 2
  • 3.  Railway was introduced in madras in 1832. First train in Indian Railway between Mumbai to Thana on 16th April 1853.Now 17 zones in Indian Railway one is NWR Jaipur and Jaipur Junction established in 1875 and in 2002 it made a NWR zone .  One of India’s most famous and luxurious train The Palace On Wheels stop at Jaipur.  Indian railway is second biggest electrified system in the world after Russia. In India 21,000KM of total routes are electrified. 3
  • 4. System of Traction : 1. Non Electric traction system Ex. Direct steam engine drive. 2. Electric traction system. a) Self-contained locomotives. b) Electric Vehicle fed from distribution networks. 4
  • 5.  Advantages and Disadvantages of non electric traction system over electric traction system-  Advantages : Disadvantages : 1. Capital cost. 1. Cleanliness. 2. Failure of power. 2. Starting time. 3. Interference to communication lines. 3. Braking. 4. Limitation. 4. limitation of fuel. 5. Problem of Regeration. 5. Maintenance cost. 5
  • 6. 6
  • 7.  On the self generating two tier air conditioned coaches, Chair cars and compressor coaches, 2 brush less alternators of 18 KW capacities each provided.  The DC outputs from the two alternators are paralleled with the battery.  In mid on generating coaches usually 30KVA brush less alternator used and generation is at 415V,3-phase,50 cycles. And in EOG coaches power at 750VAC or 415VAC stepped down 110VAC.  Express trains having heavy load use EOG coaches. Both EOG and MOG coaches the lights and fan are operated 110VAC. 7
  • 8. Alternator RRU & ERRU Inverter Battery Bank Power Pannel Control Pannel Equipments AC Plant
  • 9.  The track electrification system are categorized into: 1. DC system. 2. Single phase AC system. 3. Three phase AC system. 4. Composite system a) Single phase-Three phase system. b) Single phase-Direct current system. 9
  • 10.  The electrical power supplies arrangement for the station:  Light , fan , LED display and other electrical equipment.  To junction offices, DRM office and railway colonies.  The panels are: o Loco colony panel. o Station panel. o Ganpati nagar panel. 10
  • 11. 11
  • 12. 12
  • 13. 13
  • 14. 14 Motor types used in AC Name of Motor Coaches Motor Ratings No. of Motors Blower 1.5 HP 1 Compressor 7 HP 2 Condenser 1.5 HP 2
  • 15.  Brushless Alternators : -  Induction type Alternators used in non AC coaches are 4.5KW/37.5A/120V DC.18KW 2 unit in parallel with RRU,battery, brush less alternators are used on AC coaches.  The brushless alternator with the help of static rectifier cum regulator unit is capable of developing voltage from minimum speed to maximum speed. . 15
  • 16.  Rectifier Cum Regulator Unit : -  RRU is connected just beside the alternator to rectify the output of the generator.  A magnetic amplifier is connected which convert the 3-phase input to 110V DC  A safety fuse of 10amp is connected to prevent the RRU box from abnormal conditions.  The RRU has following functions: 1. To rectify the 3-phase AC output of the alternator through DC full wave bridge rectifier. 2. Regulator the voltage generated by the alternator at the set value. 3. Regulating the output current. 16
  • 17.  Battery and Battery Charging Terminals: -  The output of the RRU is given to battery box to charge the battery .  In a non AC coaches a battery box consist of 18 cells(6V/120Ah each) ,In AC coaches 2 battery box 56 cells(2V/1100Ah each) used.  BCT is provided for external charging of the batteries at stations or maintenance lines.  Used Battery in train is VRLA (Valve Regulated Lead Acid) types advantages - 1. Topping up with water is not required. 2. Periodical checking of specific gravity is not required. 3. Regular maintenance to avoid sulphation of terminals and connections not required. 17
  • 18.  Rotary Junction Box : -  Rotary Junction Box is provided inside the coaches.  It is used to arrange and control the power supply to various circuit of the coaches (e.g. light, fan) with the help of rotary switches and HRC fuses.  4 Rotary switches are connected in Rotary Junction Box: 1. The first switch is used to supply 70% light load in coach. 2. The second switch is used to supply 30% light load in coach. 3. . The third switch is used to supply fan load in coach. 4. The fourth switch is known as EFT switch. 18
  • 19.  Fluorescent Tube Light : -  It is a 2 feet long,18 Watt fluorescent tube light provided in the coach for the sitting gallery light and 11watt for toilet light.  It works at 110V DC supply.  It gives good light with 30% and 70% power supply. 19
  • 20.  Emergency Feed Terminals : -  It is provided at the both end of the coach to feed the additional supply to the adjacent coach in case of emergency.  Supply from the healthy coach may be extended to him/dark coach by connecting wire(1.5x2 meter) for supply to the positive and negative terminals of the EFT. 20
  • 21. 21
  • 22. 22