KAPTUR PROJECT STEERING GROUP      18TH JULY 2012        LONDONVADS : GSA : GOLDSMITHS : UAL : UCA : JISC
Agenda• Welcome and introductions.• What has KAPTUR achieved so far?• Lessons learned from developing draft RDM policies?•...
Project OverviewOBJECTIVES• To investigate the nature of research data in the visual arts.• To consider the application of...
Project OverviewBACKGROUND• Research outputs are varied and complex in the visual arts.• Little is known about the state o...
Project OverviewMETHOD• Environmental analysis.• User requirement, systems evaluation and piloting.• Policy formation.• To...
Project DirectionUSER REQUIREMENT, SYSTEMS EVALUATION AND PILOTING• User requirement.• Systems evaluation.• Pilot research...
Project DirectionPOLICY FORMATION• Partner institutional working groups established.• Recommendations made to respective R...
Project DirectionCAPACITY BUILDING• Internal dissemination.  • Creation of toolkits and training materials for researchers...
PlenaryWORKING TOGETHER• Policy Formation.• Capacity Building.• Sustaining and embedding practice - post KAPTUR.          ...
KAPTUR PROJECT STEERING GROUP      18TH JULY 2012        LONDONVADS : GSA : GOLDSMITHS : UAL : UCA : JISC
Upcoming SlideShare
Loading in...5
×

Kaptur lgarrett 18th july 2012

270

Published on

2nd KAPTUR Steering Group presentation by Leigh Garrett, VADS Director and Project Director for KAPTUR

Published in: Education, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
270
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Kaptur lgarrett 18th july 2012

  1. 1. KAPTUR PROJECT STEERING GROUP 18TH JULY 2012 LONDONVADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  2. 2. Agenda• Welcome and introductions.• What has KAPTUR achieved so far?• Lessons learned from developing draft RDM policies?• Technical report and demonstration.• How will KAPTUR support researchers and data managers?• Sustainability of RDM practice post-KAPTUR?• Plenary. KAPTUR STEERING GROUP : 18TH JULY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  3. 3. Project OverviewOBJECTIVES• To investigate the nature of research data in the visual arts.• To consider the application of technology to support collection, discoverability, usage and preservation of research data in the area.• To establish appropriate policies, procedures and systems within the four partner institutions.• To provide case studies and showcase good practice to the wider higher education sector. KAPTUR STEERING GROUP : 18TH JULY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  4. 4. Project OverviewBACKGROUND• Research outputs are varied and complex in the visual arts.• Little is known about the state of research data in the visual arts.• None of the specialist arts institutions have research data management policies or infrastructure. KAPTUR STEERING GROUP : 18TH JULY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  5. 5. Project OverviewMETHOD• Environmental analysis.• User requirement, systems evaluation and piloting.• Policy formation.• Toolkits and training materials.• Dissemination. KAPTUR STEERING GROUP : 18TH JULY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  6. 6. Project DirectionUSER REQUIREMENT, SYSTEMS EVALUATION AND PILOTING• User requirement.• Systems evaluation.• Pilot research data management system.• Deadline: October 2012.• Partner institution adoption. KAPTUR STEERING GROUP : 18TH JULY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  7. 7. Project DirectionPOLICY FORMATION• Partner institutional working groups established.• Recommendations made to respective Research Committees.• High level strategy based on the University of Edinburgh model.• Deadline: December 2012. KAPTUR STEERING GROUP : 18TH JULY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  8. 8. Project DirectionCAPACITY BUILDING• Internal dissemination. • Creation of toolkits and training materials for researchers and professional support staff.• External dissemination. • Partner institutional case studies.• Project conference.• Deadline: March 2013. KAPTUR STEERING GROUP : 18TH JULY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  9. 9. PlenaryWORKING TOGETHER• Policy Formation.• Capacity Building.• Sustaining and embedding practice - post KAPTUR. KAPTUR STEERING GROUP : 18TH JULY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  10. 10. KAPTUR PROJECT STEERING GROUP 18TH JULY 2012 LONDONVADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×