20130108 kaptur technical_cs

245 views
225 views

Published on

Technical update given by Carlos Silva at the KAPTUR Steering Group meeting, 8th January 2013.

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
245
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

20130108 kaptur technical_cs

  1. 1. Technical Report KAPTUR Carlos Silva 8th January 2013 - London KAPTUR STEERING GROUP:8TH JANUARY:LONDONVADS : GSA: GOLDSMITHS : UAL : UCA : JISC
  2. 2. Objectives• Environmental Assessment Report - Data gathered from interviews with researchers• Technical Analysis Report - Technical requirements - Technical systems - Selection of software• Costing Model - Institutionally hosted vs. cloud hosted• Pilot Demonstration Service - Figshare - Datastage - Eprints - CKAN KAPTUR STEERING GROUP:8TH JANUARY:LONDON VADS : GSA: GOLDSMITHS : UAL : UCA : JISC
  3. 3. Environmental Assessment Report• Formed the basis of the technical side of the project• The report outlined: - Issues with how researchers handle research data - Creation of visual arts research data - Use/reuse of research data not only from them but from other researchers - Preservation issues• The conclusions were: - Researchers agree research data is important for them, students, other researchers and the general public - Researchers want to share data, but with caveats for sensitive information - VA researchers document their research process, however this is following a situated rather than normative archival practice KAPTUR STEERING GROUP:8TH JANUARY:LONDON VADS : GSA: GOLDSMITHS : UAL : UCA : JISC
  4. 4. Technical Analysis Report• Research Question: - Which technical system is most suitable for managing visual arts research data?• User Requirements Document• Analysis and assessment of 17 different systems• The conclusions were: - Three systems were very close in terms of grading by partner institutions - It was recommended piloting of two systems side by side - Risks to be considered - Plans to mitigate existing risks if the likelihood increases KAPTUR STEERING GROUP:8TH JANUARY:LONDON VADS : GSA: GOLDSMITHS : UAL : UCA : JISC
  5. 5. Costing Model• Previous Steering Group Meeting• Institutional Vs Cloud Hosting• IT Cost Template KAPTUR STEERING GROUP:8TH JANUARY:LONDON VADS : GSA: GOLDSMITHS : UAL : UCA : JISC
  6. 6. Costing Model (cont)• Considerations - Identify a clear integration strategy for moving applications to the cloud - Identify resources needed to monitor the points of integration - Security plan in place to protect sensitive information - Understand risks associated with cloud computing - Understand integration (issues of how to integrate data and applications does not simply “go away” with cloud computing) - Costs including maintenance of all of the above KAPTUR STEERING GROUP:8TH JANUARY:LONDON VADS : GSA: GOLDSMITHS : UAL : UCA : JISC
  7. 7. Pilot System – Figshare KAPTUR STEERING GROUP:8TH JANUARY:LONDON VADS : GSA: GOLDSMITHS : UAL : UCA : JISC
  8. 8. Pilot System – Figshare (cont)How is your uploaded data licensed? KAPTUR STEERING GROUP:8TH JANUARY:LONDON VADS : GSA: GOLDSMITHS : UAL : UCA : JISC
  9. 9. Pilot System – DataStage KAPTUR STEERING GROUP:8TH JANUARY:LONDON VADS : GSA: GOLDSMITHS : UAL : UCA : JISC
  10. 10. Pilot System – EPrints KAPTUR STEERING GROUP:8TH JANUARY:LONDON VADS : GSA: GOLDSMITHS : UAL : UCA : JISC
  11. 11. Pilot System – CKAN – Orbital KAPTUR STEERING GROUP:8TH JANUARY:LONDON VADS : GSA: GOLDSMITHS : UAL : UCA : JISC
  12. 12. Pilot System – CKAN – Orbital (cont) http://orbital.blogs.lincoln.ac.uk/ KAPTUR STEERING GROUP:8TH JANUARY:LONDON VADS : GSA: GOLDSMITHS : UAL : UCA : JISC
  13. 13. Technical Report KAPTUR Carlos Silva 8th January 2013 - London KAPTUR STEERING GROUP:8TH JANUARY:LONDONVADS : GSA: GOLDSMITHS : UAL : UCA : JISC

×