Architectural Project : Prar0023 …

Architectural Project : Prar0023
Architects : AFF Architekten ( Martin Fröhlich, Sven Fröhlich, Alexander Georgi )
Designation : Castle Freudenstein; Freiberg, Germany.

Published in: Design
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,114
On Slideshare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
21
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Progetti126 Projects AFF Architekten Castle Freudenstein text by Rossella Mombelli Località Location Schlossplatz 4, Freiberg, Germany Progettisti Architects AFF Architekten Martin Fröhlich, Sven Fröhlich, Alexander Georgi Collaboratori Collaborators Thomas Barth, Uli Dix, Monic Frahn, Agnes Hartmann, Kerstin Herget, Nicole Jeltsch, Torsten Lockl, Jan Musikowski, Michael Shacke, Tilman Siegler, Robert Zeimer Committente Client Stadt Freiberg Utente User Sächsisches Staatsarchiv_Bergarchiv Freiberg TU Bergakademie Freiberg_Mineralogische Sammlung Strutture Structural engineering Dr.Krämer GmbH Impiantistica Technical equipment Zammit Zibell Willner & Partner AFF Architekten Paesaggista Landscaping Birgit Hammer Progetto Project time 2005 (competition) 2006-2008 (construction) Superficie complessiva Total floor area 8,500m2 1MAT60_126-135_AFF.indd 126 13-11-2008 17:19:45
  • 2. MAT60_126-135_AFF.indd 127 13-11-2008 17:19:53
  • 3. Progetti Castello Freudenstein AFF Architekten 2128 1 The atrium and the stair distribution of offices administrative dyed of green 2 The bridge access on the moat and the wall with the “Hutzen” that anticipates the architectural vision of 5 space inside the walls 3 Plant floor: 1. lateral entry: administration and delivery; 2. entry archive 3. main entrance; 4. main court; 5. deliveries 4 3 2 Projects Castle Freudenstein 1 0 5 10m 3MAT60_126-135_AFF.indd 128 13-11-2008 17:19:58
  • 4. 1 Il castello di Freudenstein si erge dominante veridicità nella materia: in questa prospettiva L’atrio e la scala di distribuzione degli uffici sullo skyline di Freiberg, nel cuore della città si legge il nuovo „abito“ assegnato al “Neue amministrativi si tinge di storica. Le funzioni assolte nel corso dei se- Schlosshof” o nuova corte di forma rettango- verde coli dal maniero hanno comportato interventi lare caratterizzato a pavimento da grandi la- 2 di conversione della sostanza storica e di mo- stre in granito giallo che emergono ritagliate Il ponte d’accesso sul fossato e la parete con le difica dell’identità del luogo: eretto nel 1168 dal piano richiamando la forma a cristallo dei “Hutzen” che anticipa la come postazione fortificata e rappresentativa, minerali. Due estensioni di volume in calce- visione architettonica dello diventa residenza ducale ma poi nei secoli struzzo nero completano il complesso carat- spazio dentro le mura decade in arsenale prima, ospedale e grana- terizzato sulle facciata delle “Kirchenflügel” 3 Pianta piano terra: io poi. Come altri palazzi e castelli signorili a dagli “Hutzen” moderna reinterpretazione 1. ingresso laterale: seguito della deposizione dei monarchi subi- della finestra storica, elementi a cannocchiale amministrazione e scono la trasformazione in istituzioni museali di geometria estrema che sforano dalla pelle consegne; 2. ingresso o versano in condizione di rovina in attesa di originaria ristrutturata creando un motivo che archivio; 3. ingresso principale; 4. corte una rifunzionalizzazìone, anche Freudenstein, si ripete sia all’interno che all’esterno. L’ele- principale; 5. consegne dopo un lungo periodo di abbandono, nel 2005 mento conico di nuova concezione stabilizza 4 è oggetto di un concorso internazionale di pro- le mura storiche abbracciando in una armo- Vista della corte interna gettazione vinto dallo studio AFF Architekten niosa unità il corpo del castello e interagendo con le pareti traforate dalle “Hutzen”, i corpi d’accesso di Berlino. Con una festosa consegna di chiavi con il disegno del pavimento della corte. in calcestruzzo e l’ala che il 17 gennaio 2008 termina la ristrutturazione La torre che domina il complesso, un tem- conserva un aspetto storico e il risanamento del Castello, mentre dall’au- po camera dei principi elettori di Sassonia, 5 tunno 2008 si inaugurano 2000 mq di archivio assume come attuale destinazione quella di Pianta secondo piano: 6. Archivio; 7. “Grosse documentario della montagna in Sassonia, spazio amministrativo del “Saxon Archive for Turm”: ingresso uffici 2000 mq dedicati alla vasta Raccolta Minera- Mining”. Un foyer centrale funziona da atrio amministrativi logica allestita dall’Università e un ristorante. per l’area reception, zona lettura e spazio 6 Il progetto di AFF si muove tra restauro con- espositivo. Vista dell’ingresso principale, interno tinto servativo e realizzazione di elementi di in- Pochi arredi bianchi a corollario di un’atmo- di lilla tensa contemporaneità. Iscrivendo volumi sfera di concentrazione e lavoro che non tra- 7 monolitici in calcestruzzo nero nell’esistente lascia accenti di estrema eleganza. A contra- Sezione longitudinale, e relazionandosi con spazi cromatici di parti- sto, si inseriscono tre spazi peculiari sia per in nero il corpo di nuova edificazione dell’archivio colare espressività, AFF indaga il concetto di l’uso del colore che formalmente: l’atrio per AFF Architekten 4MAT60_126-135_AFF.indd 129 13-11-2008 17:20:09
  • 5. Progetti Castello Freudenstein 6 0 5 7 10m 5130 4 Freudenstein castle rises up dominant on the a new court of rectangular cut forms charac- View of the courtyard with Freiberg skyline, in the heart of the historic terized by a floor made of large yellow gran- the walls pierced by the “Hutzen”, the bodies for city. The different functions performed by the ite slabs that emerge recut from the surface, access in concrete and the manor over the centuries have led to changes recalling the crystal form of minerals. Two old part that preserves an in the historical substance and modification black concrete volume extensions complete historical aspect of the identity of the place: erected in 1168 the complex, characterized on the facades of 5 Plan of the second floor: as a fortified and symbolically powerful po- “Kirchenflügel” by “Hutzen”, a modern re- 6. archive; 7. “Grosse sition, becoming a ducal residence but then, interpretation of historic windows, elements Turm” entrance for the after centuries of decline becoming an arse- that resemble telescopes with extreme geom- administrative offices nal, then a hospital, and then a granary. Like etry, that puncture the original skin, restruc- 6 View of the interior of the other noble palaces and castles that, following tured to create a pattern that is repeated both main entrance, dyed lilac the deposition of monarchs, undergo transfor- inside and outside. The conical element of the 7 mation into museums or remain in a state of new concept stabilizes the historic walls, em- Longitudinal section, in ruin awaiting refunctionalization, Freuden- bracing a harmonious unity in the body of the black the body of the new building stein also, after a long period of neglect, in castle and interacting with the design of the 8 2005 became the subject of an international floor of the court. The reading room, in project competition, won by the studio AFF The tower that dominates the complex, once the foreground the area Architekten in Berlin. A ceremonial hand- the room of the Saxon princes, assumes the of delivery and on top the reading area more ing over of the keys on January 17th, 2008, role of administrative space for the “Saxon secluded marked the end of the restructuring and reha- Mining Archive.” A central foyer works as an 9 bilitation of the Castle; then in the autumn of atrium for the reception area, reading area Projects Castle Freudenstein The cross section shows the 2008 the inauguration of 2000 square meters and exhibition space. inclusion of the “Hutzen” and the volume of the of documentary archive space for the Saxon A few pieces of white furniture complete an integrated as a box in the mountains, 2000 square meters dedicated to atmosphere of concentration and work that, ancient volume the large Mineralogy collection setup by the however, does not omit accents of extreme el- 10 university, and a restaurant . egance. In contrast, there are three peculiar Cross-section: the body atrium and stairs of The project by AFF moves between conser- areas that interject themselves for the use of administrative offices vation restoration and the implementation of color as well as form: the atrium of the adminis- 11 elements of intense contemporaneity. Putting trative offices is tinged with green and ribbons View of the reading room, monolithic volumes of black concrete in the of light, a yellow herringbone patterned wall in the foreground, the area of open space and existing space, and relating them with partic- is a place for the transmission and selection of consulting and in the ulary expressive chromatic spaces, AFF ques- archival documentation, while the reception background, the box for the tions the concept of the veracity of material. and technical assistance area is purple. study and consultation From this perspective one can read the new In the “Langes Haus” where there are traces of “dress” assigned to the “Neue Schlosshof” or Gothic windows, Renaissance accents and XVI-MAT60_126-135_AFF.indd 130 19-11-2008 17:25:49
  • 6. AFF Architekten 6 10m 5 0 7MAT60_126-135_AFF.indd 131 19-11-2008 17:25:53
  • 7. 132 Projects Castle Freudenstein Progetti Castello Freudenstein 8 AFF ArchitektenMAT60_126-135_AFF.indd 13213-11-2008 17:20:29
  • 8. 8 Sala lettura, in primo piano lo spazio di consegna dei testi d’archivio e sovrastante lo spazio di lettura più appartata 9 La sezione trasversale evidenzia l’inserimento delle “Hutzen” e il volume dell’archivio integrato come una scatola nel volume antico 10 Sezione trasversale: il corpo atrio e scala degli uffici amministrativi 11 Vista sulla sala lettura, in primo piano, lo spazio di consultazione open space e a sfondo, i box per lo studio e la consultazione 12 Il vuoto tra volume in calcestruzzo nuovo (a sinistra) e mura storiche (a destra) è trafitto dalle “Hutzen” a creare uno spazio simbolico e scenico 10m al contempo 5 0 9 10 AFF Architekten 11MAT60_126-135_AFF.indd 133 19-11-2008 17:26:02
  • 9. Progetti Castello Freudenstein 13 gli uffici amministrativi si tinge di verde e di progetto è stato portato a termine con successo Sezione degli “Hutzen”, moderna reinterpretazione nastri di luce, la parete a spina di pesce gialla tramite un’intensa collaborazione con le isti- della finestra a feritoia: è luogo di trasmissione e selezione della docu- tuzioni. Mentre l’intervento più contempora- 1. profilo in acciaio mentazione archivistica mentre viola è l’area neo è stato operato creando nuove addizioni e stabile a corrosione con di reception e assistenza tecnica. alterazioni, la facciata, la scala a due rampe ri- rivestimento coibente; 2. cono in lamiera di Nella “Langes Haus” dove emergono tracce di nascimentale e le parti in legno della struttura acciaio inossidabile, finestre gotiche, accenti rinascimentali e parti dell’arsenale sono state conservate seguendo lucidatura ad elevata lignee di strutture del XVIII secolo si snoda le indicazioni delle istituzioni e ottemperando specchiatura a l’allestimento della collezione dei minerali, alle norme della conservazione, integrandole rivestimento sull’intera superficie dell’intradosso occasione di percorso conoscitivo oltre che nell’ambito di un progetto di armonia globale. dell’intero elemento rete della stessa raccolta scientifica anche della Inoltre, nel processo progettuale ha avuto un anti insetti posizionata al storia dell’edificio attraverso le stratificazioni ruolo la collaborazione sin dalle prime fasi di terminale esterno del cono storiche di elementi architettonici. Un’ulterio- un team di ingegneri e tecnici che hanno agito prefabbricato fissata sulla lamiera di acciaio inox; re sfida progettuale è stata creare condizioni in sintonia al lavoro degli architetti risolven- 3. elemento prefabbricato di elevato valore tecnologico e tecnico sia per do problematiche come l’esigenza di un vasto in calcestruzzo a vista; l’archivio che per il progetto allestitivo tra le impianto di condizionamento senza rinuncia- 4. isolante termico 10cm mura di un antico castello. L’obbiettivo del re ad un basso consumo energetico. barriera al vapore 0,1cm lastra di cartongesso 1,25+1,25mm; 5. voltino anulare intorno all’asola ricavata nella parete esterna materiale fugante inserito per 12cm di profondità tra voltino ed elemento prefabbricato larghezza 50mm materiale stabile ai raggi UV, idoneo come giunto elastico idoneo per calcestruzzo e pietra naturale; 6. finestra con infisso in acciaio; 7. muro esistente; 8. muro nuovo; 9. intercapedine134 12 The empty space between the new concrete body (to the left) and the old walls (to the right) is crossed by the “Hutzen”, in order to create a space that is symbolic and scenic at the same time 13 Section of the “Hutzen”, a modern reinterpretation of loophole windows: 1. profile in corrosion-stable steel with insulating outer layer; 2. cone in stainless AFF Architekten steel sheet, high-gloss polishing of the facing of the entire surface of the intrados of the entire element insect net installed at the outer end of the 12 prefabricated cone fixed to the stainless steel sheet; Projects Castle Freudenstein 3. prefabricated element in untreated concrete; 4. thermal insulation 10cm II century wooden structures, there is located tions, the facade, the Renaissance stairs of vapour barrier 0,1cm gypsum board the exhibition of the minerals collection, the two ramps, and the wooden elements of the 1,25+1,25mm; 5. annular occassion for an educational route; a scientific arsenal structure were conserved following vault around the opening collection, as well as a history of the building, the directions of participating institutions and created in the outer wall, described through layers of historical archi- complying with the rules of conservation, in- with filler material inserted to a depth of 12cm between tectural elements. Another design challenge tegrating them into the overall harmony of the vault and prefabricated was to create conditions of high technological project. Moreover, from the earliest stages of element with width 50mm value for the archive as well as for the project the design process a team of engineers and material stable to UV rays, setup within the walls of an old castle. technicians has played a collaborative role, suited as elastic joint, suited for concrete and natural The goal of the project was successfully re- working in harmony with the architects to ad- stone; 6. window with steel alized through intensive collaboration with dress issues such as the need for a large air casing; 7. existing wall; institutions. While the most contemporary conditioning system without sacrificing low 8. new wall; 9. interspace work was creating new additions and altera- energy consumption.MAT60_126-135_AFF.indd 134 13-11-2008 17:20:46
  • 10. Informazioni Information Copertura: isolante Knauf Thermolan Roofing insulation Copertura Creaton (Saxonian Biber) Roofing 1 Elementi in calcestruzzo Fa. Bresa Concrete elements Elementi in laterizio Klingenberg / Cinca Tile elements Elementi in vetro VSG + security + fire protection: Glass elements Janisol WK 3 and Forster fuego Facciate Plaster: Weber Brouiton Facades Impianto acustico Sto silent 2 Acoustic system Impianto d’illuminazione HESS 3 esterna Exterior lighting system Impianto d’illuminazione Norka -Bern, Louis Poulsen interna AJ Tischleuchte/ Record, Artemide Interior lighting system Pipe, iGuzzini - Linealuce 4 Intonaco Weber Brouiton Plaster Opere di falegnameria Tischlerei Göbel, Buttstädt Carpentry work Opere di muratura Züblin Masonry work Pavimenti in legno PARAT DOS profi Wood flooring Porte Lindner Türen, Stahlrohrrahmen Doors System Jannsen, Stahlblech Hörmann, Teckentrupp Porte antincendio Jannsen and Forster Fire-fighting system doors Porte scorrevoli Forster + Blasi Sliding doors 5 Rivestimenti Foamglas Wall covering Scale mobili FB Aufzüge Escalators Serrature Schließanlagen GmbH Pfaffenhain 2 Locks Sistemi d’Arredo designed by AFF , chairs: Vitra Furnishing systems 30cm 7 10 8 0 9 13MAT60_126-135_AFF.indd 135 19-11-2008 17:26:11

×