LDA City
Housing Scheme
BY: SALMAN SABIR (URBAN PLANNER)
Contents


Introduction



Project Location



Project Features



Scope of Work



Project Area in the light of Inte...
Introduction


Owing to rapid population increase and urbanization in Lahore,
every year approximately 300,000 persons ar...


LDA itself shall not directly purchase land from the land owners



Only the Development Partners shall be authorized ...
Project Location


The scheme is located in the southern outskirts having primary
access from Main Ferozpur Road with its...
SITE
(NORTH)
(WEST)
(EAST)

BUTCHER KHANA DISTRIBUTORY

(SOUTH)
Yellow: Brick Kilns
Light Brown: Villages/Settlements
(Weirong, 2008).
Project in

the
light of
IMPL-2021
Project Features


Non conventional interesting street layouts with emphasis on pedestrian
movements as well as vehicular...
Scope of Work


Phase-1: Master Planning & Financial Appraisal Phase Services


Stage-A Information Gathering and Data C...


Phase-2: Detailed Engineering Design of Infrastructure Development
Works:

Stage-A

Preliminary Engineering Design of ...
LDA City Housing Scheme in comparison with TLP (The Lahore Project)
The Lahore Project

LDA City Housing Scheme Project

D...
Present Status


The notification u/s 4 of Land Acquisition Act, 1894 has also been
published.



Preliminary topographi...
Thank you!
LDA City presentation by salman Sabir for TLP
Upcoming SlideShare
Loading in...5
×

LDA City presentation by salman Sabir for TLP

3,085

Published on

This presentation was presented in 'The Lahore Project' Monthly Discussion Forum. Salman Sabir (Urban Planner) gave a presentation on LDA City explaining the project location, project features, scope of work, and the context of the Integrated Master Plan 2021 with the help of slides. He also compared the project with the strategies and policies formulated by TLP, showing the basic and fundamentally divergent positions between the two strategies for responding to the most pressing urban issues facing the city. The most obvious being the finding arrived at by TLP (The Lahore Project) that there was no need for any urban ‘expansion’ beyond the available developed urban area., on 20th Nov.2013 at Dabistan-e-Iqbal, (2-S, Gulberg II) Lahore.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
3,085
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "LDA City presentation by salman Sabir for TLP"

  1. 1. LDA City Housing Scheme BY: SALMAN SABIR (URBAN PLANNER)
  2. 2. Contents  Introduction  Project Location  Project Features  Scope of Work  Project Area in the light of Integrated Master Plan of Lahore 2021  Proposed Team and Expected Man-months  LDA City in comparison with The Lahore Project  Project Status
  3. 3. Introduction  Owing to rapid population increase and urbanization in Lahore, every year approximately 300,000 persons are being added to its total population  To fulfill the housing needs of the growing population, LDA has planned to launch a housing scheme named "LDA City" to be located at Ferozpur Road, Lahore  The scheme will be launched on the basis of Land Sharing Methodology between land owners and LDA  The scheme spreads over an area of 45,000 kanals/ (5000 acres) and is likely to accommodate approximately 40,000 families with all modern facilities / amenities at their door step.  It will be the largest Housing Scheme in the Province and in the history of the LDA
  4. 4.  LDA itself shall not directly purchase land from the land owners  Only the Development Partners shall be authorized to purchase land from the land owners on behalf of LDA  Development Partner shall purchase the land from the land owners and get it mutated in favour of LDA. in lieu of which, developed plots to the extent of 31% of the transferred land shall be exempted, out of which 30% shall be the share of the land owner and 1%, the share of Development Partner for the services rendered by him
  5. 5. Project Location  The scheme is located in the southern outskirts having primary access from Main Ferozpur Road with its entrance along the Butcher Khana canal and Lahore Ring Road southern Loop and is just 4-5 kms from the Gajju Matta terminal of Lahore Metro Bus service.  From revenue aspect, the scheme is spread over seven mouzas of Kahna, Kacha, Sidhar, Rakh Jhedu, Thay Panju, Toor Warriach & Halloki.  The scheme is bounded by:  Defence Road/ Hadiara drain, in North  500 meters along with Butcher Khana Canal, in South  Ferozpur Road, in East  Lahore-Karachi Railway line, in West
  6. 6. SITE
  7. 7. (NORTH) (WEST) (EAST) BUTCHER KHANA DISTRIBUTORY (SOUTH)
  8. 8. Yellow: Brick Kilns Light Brown: Villages/Settlements
  9. 9. (Weirong, 2008).
  10. 10. Project in the light of IMPL-2021
  11. 11. Project Features  Non conventional interesting street layouts with emphasis on pedestrian movements as well as vehicular movement.  Various categories of housing types including walk-up apartments  Educational facilities such as schools, colleges & a university.  Health facilities including hospitals  High end Commercial facilities, shopping malls, hyper markets, five star hotels, separate sites for fruit & vegetable markets, Automobile workshops & fuelling stations etc. and a compact finance & trade center.  Community facilities including Community Club,  Recreational facilities such as Joy-land & mini zoo, Food streets, 3D Cinemas & Theme Parks, Stadium & Play Grounds, Community & Neighbor-hood level parks, Golf course & man-made lakes etc  Spacious boulevards, walkways & cycle tracks, ample parking spaces.
  12. 12. Scope of Work  Phase-1: Master Planning & Financial Appraisal Phase Services  Stage-A Information Gathering and Data Collection  Stage-B Topographic Survey and GIS mapping  Stage-C Conceptual Land use Planning  Stage-D Detailed Layout Planning  Stage-E Preparation of Environmental Study (EIA / TIA) Report  Stage-F Preparation of Horticulture Plan *  Stage-G Phasing Plan & Financial Appraisal of the Housing Scheme * It also includes the Rooftop Rainwater Harvesting Technique
  13. 13.  Phase-2: Detailed Engineering Design of Infrastructure Development Works: Stage-A Preliminary Engineering Design of Infrastructure Works  Stage-B Detailed Engineering Design of Infrastructure Works  Stage-C Preparation of Engineers Cost Estimates and Tender Documents including BOQ’s & Technical Specifications of Infrastructure Works  Stage-D Preparation of Design Report for External Electrification System of the complete Housing Scheme.  Stage-E Preparation of Sui Gas Network Design.
  14. 14. LDA City Housing Scheme in comparison with TLP (The Lahore Project) The Lahore Project LDA City Housing Scheme Project Densification of existing developed land instead of converting agricultural land use Convert existing agriculture land use into a Housing Scheme economic sustainability and employment generation through artisanal manufacture Modern commercial centres aiming to give a boost to the city’s economic life. However, there is no indication for industrial area for this particular project is not specified. Organic farming No indication Investment of tax revenue in social infrastructure No indication Low-rise development High rise buildings and high end modern commercial centers aiming to give a boost to the city's economic life. Pedestrian circulation The scheme would be a compact, pedestrian friendly and mixed use development with all amenities / public facilities required for a sustainable neighborhood development Non conventional interesting street layouts with emphasis on pedestrian movements as well as vehicular movement. The engineering design shall include all utility services (i.e. water supply, roads, parking, pedestrian ways, sewerage systems, drainage system, & external electrification system within the project site etc)
  15. 15. Present Status  The notification u/s 4 of Land Acquisition Act, 1894 has also been published.  Preliminary topographic survey and soil investigation are complete  The consultants have been shortlisted for the project  The bidding process is in progress.
  16. 16. Thank you!

×