Uploaded on

Problems about ecology...

Problems about ecology...

More in: Technology , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
321
On Slideshare
0
From Embeds
0
Number of Embeds
2

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Country: Azerbaijan City: BakuLyceum named after Academic Zarifa Aliyeva Suleymanova Safura & Huseynzade Sakina Resources: http://www.eco.gov.az/
  • 2. In Station biological treatment with 500m3 daily power and subsidiary oil-refining equipment conforming composition of sewage water were installed. Installation area: near Bilgah Snatory of Cardiology.Purpose: to purify 500 m3 sewage water to the last density extent and as a result purifying sea waterin Bilgah-Zagulba area of water and returning microbiological condition to normal.
  • 3. Purpose: to purify water of these ponds and water supplied from this sourceto the last density extent and to prevent sewage water run to Mardakanbeach and returning sea water to normal in area of water. In Station biological treatment with 150 m3 daily power was installed. Installation area: two ponds with 24 thousand m2 and 40 thousand m3 area swamped by sewage water near to “Gizil Gum” recreation center, alongshore territory of Mardakan settlement.
  • 4. Disinfector with 240 m3 daily power was installed in Station.Installation area: whose links with the residentialdistrict located in that area, "Marian Beach"recreationcenter. 240 m3 per day capacity of the station wasestablished disinfector.
  • 5. Biological treatment with 500 m3daily power and 2 disinfectors withdaily 240 m3 power were installed.Installation area: swamped reedyarea with 12 ha between Buzovnaand Shaghan villages and on averagewith 40m3/h sewage water. Purpose: to purify water of swamped pond and water supplied from this source to the last density extent and to prevent sewage water run to Buzovna beach and return sea water to normal in area of water.
  • 6. Installation area: swamped pond with52 thousand m3 generated from sewagewater behind “Ali ayaghi” sanctuary. Biological treatment with 100 m3 daily power was installed in Station.
  • 7. Installation area: way out of line Shor pool with 1200 m length and 50-200 m width and 30-35 cm average depth in Pirshaghi settlement.Purpose: to purify sewage water with sanitaryorigin intervened the line from Shor pool inPirshaghi settlement and from recreation centrenamed after H.Aliyev and water supplied fromthis source to the last density extent and toprevent sewage water run to Pirshaghi beachand return sea water to normal in area of water.
  • 8. Biological treatment with 350 m3daily power was installed in Station.Installation area: way out of line fromGizilnohur pool. Purpose: to purify water of swamped pond and water supplied from this source to the last density extent and to prevent sewage water run to Pirshaghi beach and return sea water to normal in area of water.
  • 9. Disinfector with 240 m3 daily power was installed in Station. Installation area: Nardaran beach and 50 m2 area near it.Purpose: to return swamped areaand water of sources supplying thisarea to microbiological norm.
  • 10. Biological treatment with 500 m3 dailypower and subsidiary oil-refining equipmentconforming composition of sewage waterwere installed in Station.Installation area: territory of Amburanrecreation center. Purpose: to purify 500 m3 sewage water to the last density extent and purify sea water in water area and returning microbiological condition to normal.