1st day presentation "Mission Garage"

431 views

Published on

Presentation the team of the "Mission Garage"

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
431
On SlideShare
0
From Embeds
0
Number of Embeds
7
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

1st day presentation "Mission Garage"

  1. 2. Goal
  2. 3. Goal <ul><li>Recreate the Guest House effect </li></ul><ul><li>Friendship </li></ul>
  3. 4. Vision
  4. 5. <ul><li>Connecting people in the real-life </li></ul>Vision
  5. 6. UVP unique value proposition unique value proposition
  6. 7. UVP unique value proposition unique value proposition Social service that helps travelers to find , connect and share in the physical world with like-minded people
  7. 12. Objectives Organiser une méthode de développent de façon qu’a votre départ la nouvelle équipe puisse reprendre votre travail facilement  MVP prêt pour le 1er Mai
  8. 13. MVP Minimum Viable Product Minimum Viable Product Simple is beautiful!!!!
  9. 14. We surveyed 58 students that like traveling (56% of them consider to be backpackers). The main issue they are facing while traveling was: «  How to meet other travelers ». Why travelers are backpacking: - Meeting other: 12 - Feeling of freedom: 11 - Cultural exchange: 6 - Low cost: 6 - Cultural discovery: 3
  10. 15. Budget (licence, crédits....) €1.000 €1.000
  11. 16. 26 jours 208 heures 208 heures
  12. 17. Février: - Jeudi 9 / Vendredi 10 / Samedi 11 - Jeudi 16 / Vendredi 17 / Samedi 18 - Jeudi 23 / Vendredi 24 Mars: - Jeudi 1 / Vendredi 2 - Jeudi 8 / Vendredi 9 / Samedi 10 - Jeudi 22 / Vendredi 23 / Samedi 24 - Jeudi 29 / Vendredi 30 Avril: - Jeudi 5 / Vendredi 6 / Samedi 7 - Jeudi 19 / Vendredi 20 / Samedi 21 - Jeudi 26/ Vendredi 27
  13. 18. 30 minutes Création d’un planning de développement

×