Ashuganj Power Station
Company Ltd (APSCL).
 Romel Barua,
 Sujoy Dutta,
 Mir Md. Anisuzzaman,
 Asif Rahman Mithun,
 Jubaraj Baidya,
 Jungko Moni Chakma,
Department of Mechanical Engineering
Dhaka University of Engineering &Technology, Gazipur -1700
 Name of the Plant : Ashuganj Power Station
Company Ltd.
 Established : 1966
 Location : Ashuganj, B-Baria.
 Business : Power Generation.
 No. of Generating Units : 9
 5 Steam turbine
 2 Gas Turbine & 1 Steam turbine
 1 Gas Engine
 Manufacturer : Brown Brovary & GEC
England.
 Type of Fuel : Natural Gas
 Area of Plant : 263.55 acres
 Two Steam Units : 64 MW Each
 Three Steam Units : 150 MW Each
 Gas Turbine : 56 MW Each
 One Steam Turbine : 34 MW
 Gas Engine Power Plant : 50 MW
 Installed Capacity : 777 MW
 Present De-rated Capacity : 731 MW
 To know about APSCL
 To gather practical knowledge and experience.
 To know implementation of theoretical study in
real world.
 To know about various kinds of power
generation system
 To know about water treatment plant.
 Steam Turbine Power Plant
 Gas Turbine Power Plant
 Combined Cycle Power Plant
TURBINE
SECTION
WATER
TREATMENT
PLANT
BOILER
SECTION
GENERATOR
SECTION
Raw
water
pump
River
water
Sedimentation
Basin
70% Pure
water
Intermediate
Basin
Clear water
pump
Drinking
Water
Bleaching
Gravel
filter
Overhead
Tank
Filter
water
pump
Scavenger
Filter
Cat-ion
Exchanger
Anion
ExchangerMixed BedDemineralized
Water
Feed
Water
tank
Sludge
pump
River
Condenser
Demineralization Plant
 Sedimentation basin: This basin included aluminum
sulphate with polyelectrolyte which is used to remove
clay from water.
 Intermediate basin: store clear water
 Gravel filter: This filter included col, sand, and stone.
Which remove the insoluble particle.
 Cat-ion exchanger: Remove metallic substances.
 Overhead tank: It store filtered water.
 Scavenger filter: Remove the organic substance.
 Anion exchanger: Remove the non- metallic substances.
 Mixed bed: It helps to remove both metallic and non-
metallic substances if Cat-ion and Anion exchanger fail
to remove those.
 Demineralized water tank: Which help to storage the
demineralized water and then through the water into the
feed water tank or condenser.
 Safety Valve
 Water Level Indicator
 Fusible Plug
 Blow Down Valve
 Main Steam Stop Valve
 Feed Check Valve
 Pressure Gauge
 Safety Valve
It’s acting as a guard of boiler
resist high pressure of steam
inside the drum.
 Water Level Indicator
It indicate the water level
inside the boiler vessel.
It shows the level in the
boiler drum.
 Boiler fusible plug
It is used to protect the boiler
against damage due to
overheating caused by low
water level in the boiler.
 Blow Down Valve
To discharge the mud and
other sediments deposit
in the boiler.
 Steam Stop Valve
It regulate the flow of steam
from boiler to the steam pipe
or from one steam pipe to the
other.
 Feed Check Valve
It controls the supply of water
from the boiler when the feed
pump pressure is less than
boiler pressure or pump is
stopped.
 Pressure Gauge
It indicates the pressure
of steam in boiler.
 Feed Pump
 Economizer
 Air Preheater
 Super Heater
 Feed Pump
The feed pump is a pump
which is used to deliver feed
water to the boiler.
 Economizer
Economizer increases the temperature of feed water using
Waste of heat to flue gases leaving the boiler through
chimney.
 Super Heater
The function of super heater
is to increase the temperature
of the steam above its saturation
point.
 Air Preheater
It’s a general term to describe
any device designed to heat air
before another process with the
primary objective of increasing
the thermal efficiency of the
process.
 Steam turbine is a prime mover in which pressure
energy of steam is converted into mechanical energy &
further electrical energy.
 Classification of steam turbine
 Reaction turbine
 Impulse turbine
 Steam turbine operation is based on the Rankine cycle
with 4 key stages:
 1‐2: Pressurize
 2‐3: Heat
 3‐4: Expand
 4‐1: Condense
In impulse turbine the steam
is expanded while it moves
throw them In the former type
steam expands in the nozzle
and its pressure doesn’t
change as it moves over the
blades while in reaction
turbine the steam expands
continuously as it passes over
the blades and thus there is a
gradual fall in pressure during
expansion
 Steam enters the HP (high pressure) turbine through
nozzle. It consist of 21 stages.
 Re‐heated steam enters the IP (intermediate pressure)
turbine under the re‐heated conditions. It consist of 14
stages.
 Steam from the cross over pipe enters the center of the
LP. It consist of 6 stages.
The condenser rapidly cools
the steam leaving the LP turbine.
Condensed water is passed
through a series of pre‐heaters
on its way back to the main
boiler.
 A combined cycle system uses the same heat energy to
generate power from two different thermodynamic
cycles.
 It’s operated by
1. The Brayton cycle (Gas turbine)
2. The Rankine cycle (Steam turbine)
 Advantages:
 High power-to-weight ratio.
 It’s capital cost is lower than that of steam turbine
plant.
 Smaller, fewer moving parts and less vibration than a
reciprocating engine.
 Low toxic emissions, less pollution compared to
conventional steam or gas turbine power plants
 Runs on a wide variety of fuels, and high operating
speeds.
 Disadvantages:
 Higher operating cost.
 Higher maintenance cost because of the combination of
two systems.
 Longer start-up.
 Less responsive to power demands, and a shrill whining
noise.
 The capital cost is higher than that of gas turbine plant.
In a Brayton cycle
combustion
and exhaust take place
at a constant pressure.
The Rankine cycle is a model
that is used to predict the
performance of steam
turbine systems. The
Rankine cycle is an idealized
thermodynamic cycle of a
heat engine that converts
heat into mechanical work
 The HRSG uses waste
heat contained in the
exhaust of a gas turbine
to convert water to
steam. The steam is then
used to power a steam
turbine and supply
auxiliary plant processes
 Deaerator is used to remove the dissolve gases like
oxygen and carbon dioxide
A mechanical draft cooling tower with a fan at the discharge which pulls
air through tower. The fan induces hot moist air out the discharge.
APSCL is playing an important role in producing power for
the nation and thus contributing to the country’s economy.
We are glad that we got a chance to compete our
internship program in APSCL; which is the second largest
power company in Bangladesh. We believe that, the
practical experience that we gathered in APSCL will help
us in our professional life.
Thank You

More Related Content

What's hot

training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...Sagar Mehta
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plantMohdAreebQureshi
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)sometech
 
thermal power plant NTPC singrauli
thermal power plant NTPC singrauli thermal power plant NTPC singrauli
thermal power plant NTPC singrauli Ram Narayan Shah
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plantsagar20jain
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentationShahzaib Hussain
 
Steam thermal power plant(panki)
Steam thermal power plant(panki)Steam thermal power plant(panki)
Steam thermal power plant(panki)Ranjeet Kumar
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power stationNaveen Kumar
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plantHîmãńshu Mêęńä
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPPAmit Bansal
 
Heat rate of thermal power plant
Heat rate of thermal power plantHeat rate of thermal power plant
Heat rate of thermal power plantManohar Tatwawadi
 
Thermal Power Plant Basic to Knowledge
Thermal Power Plant Basic to KnowledgeThermal Power Plant Basic to Knowledge
Thermal Power Plant Basic to KnowledgeAnshuman Tyagi
 
Summer internship report of DCCPP
Summer internship report of DCCPPSummer internship report of DCCPP
Summer internship report of DCCPPDurgSingh
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Shubham Thakur
 
Indian oil corporation limited ppt of mechanical engineering
Indian oil corporation limited ppt of mechanical engineeringIndian oil corporation limited ppt of mechanical engineering
Indian oil corporation limited ppt of mechanical engineeringRajeev Mandal
 

What's hot (20)

training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
 
thermal power plant NTPC singrauli
thermal power plant NTPC singrauli thermal power plant NTPC singrauli
thermal power plant NTPC singrauli
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentation
 
Steam thermal power plant(panki)
Steam thermal power plant(panki)Steam thermal power plant(panki)
Steam thermal power plant(panki)
 
A best ppt on kota super thermal power station
A best ppt on kota super thermal power stationA best ppt on kota super thermal power station
A best ppt on kota super thermal power station
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plant
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
 
Heat rate of thermal power plant
Heat rate of thermal power plantHeat rate of thermal power plant
Heat rate of thermal power plant
 
Coal and ash handling systems
Coal and ash handling systemsCoal and ash handling systems
Coal and ash handling systems
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power Plant Basic to Knowledge
Thermal Power Plant Basic to KnowledgeThermal Power Plant Basic to Knowledge
Thermal Power Plant Basic to Knowledge
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Summer internship report of DCCPP
Summer internship report of DCCPPSummer internship report of DCCPP
Summer internship report of DCCPP
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 
kstps training report
kstps training reportkstps training report
kstps training report
 
steam turbine presentations
steam turbine presentationssteam turbine presentations
steam turbine presentations
 
Indian oil corporation limited ppt of mechanical engineering
Indian oil corporation limited ppt of mechanical engineeringIndian oil corporation limited ppt of mechanical engineering
Indian oil corporation limited ppt of mechanical engineering
 

Viewers also liked

Viewers also liked (20)

Qcl 14-v3-5s practices-banasthali vidyapeeth-geetika gautam(1)
Qcl 14-v3-5s practices-banasthali vidyapeeth-geetika gautam(1)Qcl 14-v3-5s practices-banasthali vidyapeeth-geetika gautam(1)
Qcl 14-v3-5s practices-banasthali vidyapeeth-geetika gautam(1)
 
IBM Brochure 9-88
IBM Brochure 9-88IBM Brochure 9-88
IBM Brochure 9-88
 
iface_product catalog
iface_product catalogiface_product catalog
iface_product catalog
 
TJ14091-Nova-Industries-ASTM-E-84
TJ14091-Nova-Industries-ASTM-E-84TJ14091-Nova-Industries-ASTM-E-84
TJ14091-Nova-Industries-ASTM-E-84
 
Rumus Matematika
Rumus  MatematikaRumus  Matematika
Rumus Matematika
 
confer
conferconfer
confer
 
Triple S - Shared Services Standard
Triple S - Shared Services StandardTriple S - Shared Services Standard
Triple S - Shared Services Standard
 
Anti-Counterfeiting & Brand Protection
Anti-Counterfeiting & Brand ProtectionAnti-Counterfeiting & Brand Protection
Anti-Counterfeiting & Brand Protection
 
Resume
ResumeResume
Resume
 
bwr-tt102es
bwr-tt102esbwr-tt102es
bwr-tt102es
 
Curriculum VITA as Professor
Curriculum VITA as ProfessorCurriculum VITA as Professor
Curriculum VITA as Professor
 
Oncoceutics leerink global healthcare 2015
Oncoceutics leerink global healthcare 2015Oncoceutics leerink global healthcare 2015
Oncoceutics leerink global healthcare 2015
 
Curriculum VITA as Assistant Professor
Curriculum VITA as Assistant ProfessorCurriculum VITA as Assistant Professor
Curriculum VITA as Assistant Professor
 
Databases -Screenshots
Databases -ScreenshotsDatabases -Screenshots
Databases -Screenshots
 
MINDSHARE Vol 2 Issue 3
MINDSHARE Vol 2 Issue 3MINDSHARE Vol 2 Issue 3
MINDSHARE Vol 2 Issue 3
 
Ahmed adel cv2
Ahmed adel cv2Ahmed adel cv2
Ahmed adel cv2
 
Special Olympics Summer Games 2015
Special Olympics Summer Games 2015Special Olympics Summer Games 2015
Special Olympics Summer Games 2015
 
IAEA_report
IAEA_reportIAEA_report
IAEA_report
 
El costo de la historia
El costo de la historiaEl costo de la historia
El costo de la historia
 
Mold-Testing
Mold-TestingMold-Testing
Mold-Testing
 

Similar to power station in bangladesh

Sandeep verma ppt on kstps
Sandeep verma ppt on kstps   Sandeep verma ppt on kstps
Sandeep verma ppt on kstps sandeep244266
 
2013edusat lecture on steam plant(2)
2013edusat lecture on steam  plant(2)2013edusat lecture on steam  plant(2)
2013edusat lecture on steam plant(2)iimt college meerut
 
Steam turbine power plant
Steam turbine power plantSteam turbine power plant
Steam turbine power plantTarek Erin
 
Three major inputs of ptps
Three major inputs of ptpsThree major inputs of ptps
Three major inputs of ptps4067HimanshuEE5
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt completeVikas Singh
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarRishikesh .
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantfoxycrow
 
KOTA SUPER THERMAL POWER STATION (KSTPS) by RANJAN NAIK
KOTA SUPER THERMAL POWER STATION (KSTPS) by RANJAN NAIKKOTA SUPER THERMAL POWER STATION (KSTPS) by RANJAN NAIK
KOTA SUPER THERMAL POWER STATION (KSTPS) by RANJAN NAIKRanjan Naik
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardI.E.T. lucknow
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT Amit Gupta
 
steam turbine[1] (3).pptxshshshhhshshshh
steam turbine[1] (3).pptxshshshhhshshshhsteam turbine[1] (3).pptxshshshhhshshshh
steam turbine[1] (3).pptxshshshhhshshshhAzizAlabad
 
National thermal power corporation
National thermal power corporationNational thermal power corporation
National thermal power corporationAbhishek Awasthi
 

Similar to power station in bangladesh (20)

Sandeep verma ppt on kstps
Sandeep verma ppt on kstps   Sandeep verma ppt on kstps
Sandeep verma ppt on kstps
 
POWER PLANT.pdf
POWER PLANT.pdfPOWER PLANT.pdf
POWER PLANT.pdf
 
lecture on steam plant
 lecture on steam  plant lecture on steam  plant
lecture on steam plant
 
2013edusat lecture on steam plant(2)
2013edusat lecture on steam  plant(2)2013edusat lecture on steam  plant(2)
2013edusat lecture on steam plant(2)
 
Paras ppt
Paras pptParas ppt
Paras ppt
 
Steam turbine power plant
Steam turbine power plantSteam turbine power plant
Steam turbine power plant
 
Three major inputs of ptps
Three major inputs of ptpsThree major inputs of ptps
Three major inputs of ptps
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
KOTA SUPER THERMAL POWER STATION (KSTPS) by RANJAN NAIK
KOTA SUPER THERMAL POWER STATION (KSTPS) by RANJAN NAIKKOTA SUPER THERMAL POWER STATION (KSTPS) by RANJAN NAIK
KOTA SUPER THERMAL POWER STATION (KSTPS) by RANJAN NAIK
 
Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
STEAM POWER PLANT
STEAM POWER PLANTSTEAM POWER PLANT
STEAM POWER PLANT
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
KTPS
KTPSKTPS
KTPS
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
 
steam turbine[1] (3).pptxshshshhhshshshh
steam turbine[1] (3).pptxshshshhhshshshhsteam turbine[1] (3).pptxshshshhhshshshh
steam turbine[1] (3).pptxshshshhhshshshh
 
National thermal power corporation
National thermal power corporationNational thermal power corporation
National thermal power corporation
 
report final
report finalreport final
report final
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 

Recently uploaded

ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 

Recently uploaded (20)

ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 

power station in bangladesh

  • 2.  Romel Barua,  Sujoy Dutta,  Mir Md. Anisuzzaman,  Asif Rahman Mithun,  Jubaraj Baidya,  Jungko Moni Chakma, Department of Mechanical Engineering Dhaka University of Engineering &Technology, Gazipur -1700
  • 3.  Name of the Plant : Ashuganj Power Station Company Ltd.  Established : 1966  Location : Ashuganj, B-Baria.  Business : Power Generation.  No. of Generating Units : 9  5 Steam turbine  2 Gas Turbine & 1 Steam turbine  1 Gas Engine  Manufacturer : Brown Brovary & GEC England.  Type of Fuel : Natural Gas  Area of Plant : 263.55 acres
  • 4.  Two Steam Units : 64 MW Each  Three Steam Units : 150 MW Each  Gas Turbine : 56 MW Each  One Steam Turbine : 34 MW  Gas Engine Power Plant : 50 MW  Installed Capacity : 777 MW  Present De-rated Capacity : 731 MW
  • 5.  To know about APSCL  To gather practical knowledge and experience.  To know implementation of theoretical study in real world.  To know about various kinds of power generation system  To know about water treatment plant.
  • 6.  Steam Turbine Power Plant  Gas Turbine Power Plant  Combined Cycle Power Plant
  • 9.  Sedimentation basin: This basin included aluminum sulphate with polyelectrolyte which is used to remove clay from water.  Intermediate basin: store clear water  Gravel filter: This filter included col, sand, and stone. Which remove the insoluble particle.
  • 10.  Cat-ion exchanger: Remove metallic substances.  Overhead tank: It store filtered water.  Scavenger filter: Remove the organic substance.  Anion exchanger: Remove the non- metallic substances.
  • 11.  Mixed bed: It helps to remove both metallic and non- metallic substances if Cat-ion and Anion exchanger fail to remove those.  Demineralized water tank: Which help to storage the demineralized water and then through the water into the feed water tank or condenser.
  • 12.
  • 13.  Safety Valve  Water Level Indicator  Fusible Plug  Blow Down Valve  Main Steam Stop Valve  Feed Check Valve  Pressure Gauge
  • 14.  Safety Valve It’s acting as a guard of boiler resist high pressure of steam inside the drum.
  • 15.  Water Level Indicator It indicate the water level inside the boiler vessel. It shows the level in the boiler drum.
  • 16.  Boiler fusible plug It is used to protect the boiler against damage due to overheating caused by low water level in the boiler.
  • 17.  Blow Down Valve To discharge the mud and other sediments deposit in the boiler.
  • 18.  Steam Stop Valve It regulate the flow of steam from boiler to the steam pipe or from one steam pipe to the other.
  • 19.  Feed Check Valve It controls the supply of water from the boiler when the feed pump pressure is less than boiler pressure or pump is stopped.
  • 20.  Pressure Gauge It indicates the pressure of steam in boiler.
  • 21.  Feed Pump  Economizer  Air Preheater  Super Heater
  • 22.  Feed Pump The feed pump is a pump which is used to deliver feed water to the boiler.
  • 23.  Economizer Economizer increases the temperature of feed water using Waste of heat to flue gases leaving the boiler through chimney.
  • 24.  Super Heater The function of super heater is to increase the temperature of the steam above its saturation point.
  • 25.  Air Preheater It’s a general term to describe any device designed to heat air before another process with the primary objective of increasing the thermal efficiency of the process.
  • 26.  Steam turbine is a prime mover in which pressure energy of steam is converted into mechanical energy & further electrical energy.  Classification of steam turbine  Reaction turbine  Impulse turbine
  • 27.  Steam turbine operation is based on the Rankine cycle with 4 key stages:  1‐2: Pressurize  2‐3: Heat  3‐4: Expand  4‐1: Condense
  • 28. In impulse turbine the steam is expanded while it moves throw them In the former type steam expands in the nozzle and its pressure doesn’t change as it moves over the blades while in reaction turbine the steam expands continuously as it passes over the blades and thus there is a gradual fall in pressure during expansion
  • 29.
  • 30.  Steam enters the HP (high pressure) turbine through nozzle. It consist of 21 stages.  Re‐heated steam enters the IP (intermediate pressure) turbine under the re‐heated conditions. It consist of 14 stages.  Steam from the cross over pipe enters the center of the LP. It consist of 6 stages.
  • 31. The condenser rapidly cools the steam leaving the LP turbine. Condensed water is passed through a series of pre‐heaters on its way back to the main boiler.
  • 32.  A combined cycle system uses the same heat energy to generate power from two different thermodynamic cycles.  It’s operated by 1. The Brayton cycle (Gas turbine) 2. The Rankine cycle (Steam turbine)
  • 33.  Advantages:  High power-to-weight ratio.  It’s capital cost is lower than that of steam turbine plant.  Smaller, fewer moving parts and less vibration than a reciprocating engine.  Low toxic emissions, less pollution compared to conventional steam or gas turbine power plants  Runs on a wide variety of fuels, and high operating speeds.
  • 34.  Disadvantages:  Higher operating cost.  Higher maintenance cost because of the combination of two systems.  Longer start-up.  Less responsive to power demands, and a shrill whining noise.  The capital cost is higher than that of gas turbine plant.
  • 35. In a Brayton cycle combustion and exhaust take place at a constant pressure.
  • 36. The Rankine cycle is a model that is used to predict the performance of steam turbine systems. The Rankine cycle is an idealized thermodynamic cycle of a heat engine that converts heat into mechanical work
  • 37.
  • 38.
  • 39.  The HRSG uses waste heat contained in the exhaust of a gas turbine to convert water to steam. The steam is then used to power a steam turbine and supply auxiliary plant processes
  • 40.  Deaerator is used to remove the dissolve gases like oxygen and carbon dioxide
  • 41.
  • 42. A mechanical draft cooling tower with a fan at the discharge which pulls air through tower. The fan induces hot moist air out the discharge.
  • 43. APSCL is playing an important role in producing power for the nation and thus contributing to the country’s economy. We are glad that we got a chance to compete our internship program in APSCL; which is the second largest power company in Bangladesh. We believe that, the practical experience that we gathered in APSCL will help us in our professional life.