Overview of the Bridging method of construction project delivery.

Overview of the Bridging method of construction project delivery.

More in: Business , Design
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
165
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1.  
  • 2.
        • The only project delivery method that obtains a highly dependable total construction contract award price at only about halfway through the design phases with only a little over half of the design cost incurred
        • Reduces Owner’s cost for a fully equivalent end product.
        • Reduces Owner’s exposure to contractor initiated changes orders
        • The construction goes faster and smoother than in other methods
        • Reduces Owner’s exposure to claims
        • Reduces costs/delays/disputes in fixing ever present “bugs” discovered after occupancy
  • 3. Georgia Tech Savannah Program Management and Owner’s Design Consultant
  • 4. Georgia Tech Savannah Program Management and Owner’s Design Consultant
  • 5.
    • Logical and orderly process, well understood throughout the industry.
    • Easily meets all procurement procedure requirements.
    • There is the direct professional relationship between the Architect and Engineers with the client (User and/or Owner).
    • Contract price can be set by either competitive bidding or negotiation prior to the Owner committing to the construction phase.
    ADVANTAGES Traditional Method (Design-Bid-Build)
  • 6.
      • It takes too long and costs too much to get to the point of the Owner being protected with a total construction contract price that can be reasonably expected to hold up within a few percentage points.
      • Virtually all construction contracts are predicated on the drawings and specifications being free of errors and omissions. Yet that is humanly impossible.
      • The method assumes that architects and engineers have the best knowledge of construction technology and cost effective construction methods. Yet that is not true.
      • After completion, there can be a frustrating and costly situation for the Owner with no clear single responsibility for the correction of post construction problems.
    4 SERIOUS FLAWS Traditional Method (Design-Bid-Build)
  • 7. ADVANTAGES: DISADVANTAGES:
    • Potential for better integration of construction “know how” into design process.
    • Single responsibility for all aspects of design & construction.
    Typical Design-Build Methods
    • Conflict of interest between the Architect/Engineers and the Owner.
    • Early loss of leverage for the Owner.
    • Difficult to have “apples to apples” competition on prices and performance.
  • 8. CM-at-Risk Method
    • ADVANTAGES
    • Brings CM (Contractor) in early to advise on costs, schedule, materials, methods, and logistics.
    • CM provides periodic cost updates and “Guaranteed Maximum Price” statements from around mid-point through completion of Contract Documents.
    • Saves bidding time
  • 9. CM-at-Risk Method
    • DISADVANTAGES
    • GMP issued on less than 100% Contract Documents are not readily enforceable.
    • Has same “finger pointing” problem as in Design-Bid-Build.
    • CM may have conflict with respect to same subs used at same time on other projects.
  • 10.
    • The Owner's Design Consultant (ODC), also referred to as Design Architect or Bridging Architect, carries out Schematic Design (SD) in the traditional manner.
    • The ODC and Owner's Program Manager prepare Bridging Contract Documents (BCD).
  • 11.  
  • 12.
    • The Owner's Design Consultant (ODC), also referred to as Design Architect or Bridging Architect, carries out Schematic Design (SD) in the traditional manner.
    • The ODC and Owner's Program Manager prepare Bridging Contract Documents (BCD).
    • Proposals received for lump sum fixed price for a design-build form of contract; contract award; CD authorization.
    • Contractor's architect/engineers prepare final Construction Documents (CDs) which the ODC and Owner's Program Manager review for compliance with the ODC's design and performance specifications.
    • The Owner has the right to terminate without cause. If the Owner chooses, construction is authorized.
    • The ODC carries out observation of the work. Owner's Program Manager administers the contract on behalf of and acts as the representative of the Owner.
  • 13. Bridging Method compared with Design-Bid-Build
  • 14. Bridging Method Project Organization
  • 15. Poly Canyon Village
  • 16. Recently Completed Poly Canyon Village
  • 17. Recently Completed Poly Canyon Village
  • 18. Lloyd George U.S. Courthouse – Las Vegas, Nevada
  • 19. The Wakefield Luxury Co-Op, Atlanta, Georgia Design Management and Owner’s Design Consultant
  • 20. Spelman Student Residence Hall and Dining Facility, Atlanta, Georgia Program Management
  • 21. Electronics Manufacturing Plant – Juarez, Mexico
  • 22. Manufacturing Plant and Marketing Center for Milliken & Co. Yonazawa, Japan
  • 23. The Peninsula Mandalay Francisco, California
  • 24. Accelerating a Bridging Project