• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Tit Wroksh0p Slc For Sd & Qc
 

Tit Wroksh0p Slc For Sd & Qc

on

  • 1,233 views

This presentation I used in Maulana Bhashani IT University, Tangail, Bangladesh. Its all about SLC, Software development in brief and how Quality Control incorporate with all these.

This presentation I used in Maulana Bhashani IT University, Tangail, Bangladesh. Its all about SLC, Software development in brief and how Quality Control incorporate with all these.

Statistics

Views

Total Views
1,233
Views on SlideShare
1,171
Embed Views
62

Actions

Likes
0
Downloads
25
Comments
1

2 Embeds 62

http://www.techgig.com 61
http://www.slideshare.net 1

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel

11 of 1 previous next

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
  • hi any one please send complete MANUAL TESTING NOTES FOR my mail id grpma@yahoo.co.in.Please Help us.thanks you
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Tit Wroksh0p Slc For Sd & Qc Tit Wroksh0p Slc For Sd & Qc Presentation Transcript

    • SLC Process for Software Development & Quality Control 1
    • Md. Shaiful Islam B.Sc. in Computer Science University of Chennai, India. Training: Certified Software Test Professional (CSTP) Experience: 4 years in Software Testing 2
    • • Software Lifecycle Models • SLC Process in Industry • Quality Control 0011 0010 1010 1101 0001 0100 1011 • Q&A 3
    • • Waterfall or Linear Sequential • Rapid Application Development • Incremental 0011 • Prototyping 0100 1011 0010 1010 1101 0001 • Spiral • Joint Application Development • Rational Unified Process • Agile Software Development 4
    • System Feasibility System Feasibility System Planning & System Planning & Requirement Analysis Requirement Analysis 0011 0010 1010 1101 0001 System Design 0100 Design System 1011 Coding Coding Integration Integration Implementation Implementation Operation & Operation & Maintenance Maintenance 5
    • Business Business Business Business Modelling Modelling Modelling Modelling Data Data Data Data Modelling Modelling Modelling Modelling 0011 0010 1010 1101 0001 0100 1011 Process Process Process Process Modelling Modelling Modelling Modelling Application Module Application Module Application Module Application Module Generation Generation Generation Generation Testing & Testing & Testing & Testing & Delivery Delivery Delivery Delivery 6 Team #1 Team #1 Team #2 Team #2
    • Increment 1 Increment 1 Analysis Design Coding Testing Delivery of 1st Delivery of 1st Analysis Design Coding Testing increment increment Increment 2 Increment 2 Analysis Design Coding Testing Delivery of 2nd Delivery of 2nd Analysis Design Coding Testing increment increment 0011 0010 1010 1101 0001 0100 1011 Increment 3 Increment 3 Analysis Design Coding Testing Delivery of 3rd Delivery of 3rd Analysis Design Coding Testing increment increment 7
    • • Requirements are development in a series of iteration • Discussion with client regarding overall system objectives • Identify requirements • Conceptual or Gross Design 0011 0010 1010 1101 0001 0100 1011 • Develop Prototype • Obtain feedback • Refine requirements 8
    • • More of a project management strategy and approach; • Development team, customer management 0011 0010 1010 user 0001 0100work and 1101 group 1011 together; • Any lifecycle model is used; • Lifecycle activities may differ; 9
    • SLC Process for SLC Process for Software Development Software Development Bespoke Software Bespoke Software Enhancement of Existing Enhancement of Existing Development Development Software (Large/ Medium) Software (Large/ Medium) 0011 0010 1010 1101 0001System Analysis System Analysis 0100 1011 Prepare System Specification Prepare System Specification System Design System Design Design Design Coding/ Construction Coding/ Construction Coding/ Construction Coding/ Construction Testing Testing Testing Testing Implementation Implementation Implementation & Acceptance Implementation & Acceptance Maintenance (During Warranty Period) Maintenance (During Warranty Period) 10
    • • Template followed, either SSADM or OOAD; • 4 types of requirements are considered – Customer Requirements; – Product Requirements; – Interface Requirements; 0011 0010 1010 1101 0001 0100 1011 – Implementation Requirements. • Input and output requirements are identified • Identify acceptance criteria with reference to – Scope – Functionality – Performance – Security 11
    • • Draft implementation Plan • Identify hardware, software and infrastructure requirement • Review 0011 0010 1010 1101 0001 0100 1011 • Approves and baseline • Update RTM 12
    • • Template followed, either SSADM or OOAD • Choose effective design methodology and standards • Prepare Both HLD and LLD 0011 0010 1010 1101 0001 0100 component • Product or product 1011 requirements are designed • Design PI activities; • Decide on product acquisition type 13
    • • Review • Approve and Baseline • Update RTM 0011 0010 1010 1101 0001 0100 1011 14
    • • Coding is started as per Schedule; • Done as per SDD and other required input formats; • Coding standard is followed; • Code elements are brought under Configuration 0011 0010 1010 1101 0001 0100 1011 Management at each milestone; • Conduct code review; • Update RTM; • Assemble product components as per design; 15
    • • Documentation is done as follows – Team member prepares manuals; – Work hand in hand with other member throughout development lifecycle; 0011 0010 1010 1101 0001 0100 1011 – Documents are reviewed and approved; – Documents are configuration controlled; – Final version is verified. 16
    • • Done as per QC Plan • Review and Testing Process and Guidelines for Review and Testing is followed 0011 0010 1010 1101 0001 0100 1011 • PM keeps record of identified defects • Test result is reviewed and approved • Delivery package is prepared 17
    • Software Testing & Quality Control • Testing is a process of evaluating a system by manual or automation means and verify that it satisfies specified requirements or identify difference between expected and actual result. 0011 0010 1010 1101 0001 0100 1011 • Quality provides customer satisfaction for the first time and every time. It is the factor affecting an organizations long term performance and improves productivity and competitiveness. 18
    • Why Testing? • Software testing is important as it may cause mission failure, impact on operational performance and reliability if not done properly. 0011 0010 Deliver quality software products, satisfy user • 1010 1101 0001 0100 1011 requirements, needs and expectation. • Uncover defects before the products install in production, it can save a huge loss. 19
    • Participants in Testing • Software Customer • Software User 0011 0010 1010 1101 0001 Developer • Software 0100 1011 • Tester • Information Service Management • Senior Organization Management 20
    • Recent Major Computer System Failures According to news reports in April’04 a software bug was determined to be a major contribution to the 2003 Northeast blackout, the worst power system failure in North American history. The failure involved loss of electrical power to 50 million customers, forced shutdown of 100 power plants, and 0011 0010 1010 1101 0001 0100 1011 economic losses estimated at $6 billion. The bug was reportedly in one utility company’s vendor_supplied power monitoring and management systems, which was unable to correctly handle and report on an unusual confluence of initially localized events. The error was found and corrected after examining million of lines of code. 21
    • Software Development Life Cycle • Requirement- SRS (Software Requirement Specification) SRAS (Software Requirement & Analysis Specification) FS (Functional Specification) • Design- HLD (High Level Design) 0011 0010 1010 1101 0001 0100 1011 LLD (Low Level Design) • Coding- According to code format • Testing • Implementation • Maintenance 22
    • w-Model Write Test Requirement Requirement Install Acceptance Test Logical Design Test Design 0011 0010 1010 1101 0001 0100 1011 Build System System Test Physical Design Test Design Build Software Integration Test Unit Test Code 23
    • Testing Economic & Cost Traditional Test Continuous Test Accumulated Accumulated Development Accumulated Accumulated Test Cost Error Cycle Error Test Cost Remaining Remaining 0 20 Requirement 10 $10 0 40 Design 15 $25 0011 0010 1010 1101 0001 0100 1011 0 60 Code 18 $42 $480 12 Testing 4 $182 $1690 0 Production 0 $582 24
    • Testing Type • Static (Review) • Dynamic (Execution) Static: • Only review not execution of the program 0011 0010 1010 1101 0001 0100 1011 Dynamic: • Structural (logic, white box testing, developer) • Functional (no logic, black box testing, tester) 25
    • Structural Testing • Concerned with testing the implementation of the program • Focus on the internal structure of the program 0011 0010 1010 1101 0001 0100 1011 • The intention of structural testing is not to be exercise all the different I/P or O/P condition but to exercise the different programming structure and the data structure of the program 26
    • Functional Testing • Structure of the program is not considered • Test cases are decided base on the requirements or specification of the program or module 0011 0010 1010 1101 0001 0100 1011 • Hence it is called “Black Box” testing 27
    • Some Definition What is Test Plan? • Road map for the entire testing activity What are Test Cases? • Set of procedures which we execute in our system to find defects 0011 0010 1010 1101 0001 0100 1011 What is Defects? • A defect is a variance from a desired product attributes • Variance from customer/user expectation 28
    • Primary Role of Software Testing • Determine whether the system meets specification (Producer View) • Determine whether the system meets business and user needs (Customer View) 0011 0010 1010 1101 0001 0100 1011 Role of Tester: Find defect not correcting the defects Classification of Defects: • Wrong (ER! = AR) • Missing (Missing some point) • Extra (Extra point) 29
    • Testing Levels • Unit Testing • Integration Testing • System Testing & 0011 0010 1010 1101 0001 0100 1011 • Application Under Test (AUT) or User Acceptance Test (UAT) 30
    • Unit Testing • LLD • Module Testing • Individually Testing 0011 0010 1010 1101 Box Testing • White 0001 0100 1011 • Developer job • Test each module individually • Follow White Box Testing (logic of the program) 31
    • Integration Testing • LLD+ HLD (Developer+ Tester) • Communication+ Data Flow 0011 0010 1010 1101 BB= Gray Box • WB+ 0001 0100 1011 • Integrate two or more module ie. Communicate between modules • Follow a White Box Testing (testing the codes) 32
    • System Testing • Confirms that the system as a whole delivers the functionality originally required. 0011 0010 1010 1101 0001 0100 1011 • Follow Black Box Testing • Functionality Testing, Tester job 33
    • User Acceptance Testing • Building the confidence of the client and users is the role of the acceptance testing phase 0011 0010 1010 1101 0001 0100 1011 • It is depend on the business scenario • Red Box Testing (crucial) 34
    • Testing Techniques • White Box testing – Statement coverage, Condition, Decision, Loop, (code coverage analysis) 0011 0010 Black Box testing • 1010 1101 0001 0100 1011 • Incremental testing • Thread testing 35
    • White Box Testing • Statement Coverage: Execute all statements at least once • Decision Coverage: Execute each decision 0011 0010direction at 0100 1011 1010 1101 0001 least once • Condition Coverage: Execute each decision with all possible outcome at least once 36
    • Black Box Testing • Equivalence Partitioning • Boundary Analysis • Error Guessing 0011 0010 1010 1101 0001 0100 1011 37
    • Equivalence Partitioning • A subset of date that is representative of a larger class • For example, a program which edits credit limits within given range ($10000-$15000) would have 0011 0010 1010 1101 0001 0100 1011 3 equivalence classes a. Less than $10000 (Invalid) b. Between $10000 and $15000 (Valid) c. Greater than $15000 (Invalid) 38
    • Boundary Analysis • A technique that consists of developing test cases and data that focus on the input and output boundaries of a given function • In the same credit limits example boundary analysis would test: 0011 0010 1010 1101 0001 0100 1011 • Lower Boundary: Plus or minus 1 ($9999 and $10001) • On the Boundary: ($10000 and $15000) • Upper Boundary: Plus or minus 1 (14999 and 15001) 39
    • Error Guessing • Based on the theory that test cases can be developed based on experience of the test engineer • For example, in an example where one of the I/P is the date, a test engineer might try February 29,2001 0011 0010 1010 1101 0001 0100 1011 • One more example is, according to newspaper reports Microsoft co. losses $100 million only because their programmer has lack of knowledge in geographical knowledge. 40
    • Incremental Testing Top down and Bottom up. A disciplined method of testing the interfaces between unit-tested programs as well as between system components Type: Top-down that is HLD Bottom-up that is LLD Top-down: Begins testing from the top of the module hierarchy and works down to the bottom using interim stabs to simulate lower interfacing modules or programs 0011 0010 1010 1101 0001 0100 1011 Bottom-up: • Begins testing from the bottom of the hierarchy and works up to the top • Bottom-up testing is required the development of driver modules which provide the test I/P, call the module or program being tested, and display test O/P 41
    • Thread Testing • A technique often used during early integration testing • Demonstrate key functional capabilities by testing a string of units that accomplish a 0011 0010 1010 1101 0001 0100 1011 specific function in the application 42
    • Criteria of Testing Level Entry Level Exit Level Unit Testing Base Code Logic 100% complete Integration Testing Complete Unit Communication & Testing data flow 0011 0010 1010 1101 0001 0100 1011 System Testing Complete Integration ER=AR Testing UAT Implementation Deliver to Customer Software Regression Anytime find defect Solve the defect 43
    • Special Test Types Performance: • The time taken to complete task • How performance is measured? 0011 0010 1010 1101 0001 speed a. Process 0100 1011 b. Response time c. Efficiency 44
    • Performance Test • Load (No. Of users) • Stress (Response time that polling down the Resource) 0011 0010 1010 1101 0001 0100 1011 • It is designed to test the run time performance of software • It occurs throughout all steps in the testing process (test levels) 45
    • Load · The maximum no of users a system can support is called “Load” · How large can the database grow before 0011 0010 1010 1101 0001 0100degrades performance 1011 · At what point will more storage space be required? 46
    • Stress • Running the software under less conditions • Low memory, low disk space and so on • Limiting them to their base minimum 0011 0010 1010 1101 0001 0100 1011 • Pull down resources 47
    • Benefits Realization Test • It is a test or analysis conducted offer an application is moved into production • To determine whether the application is likely to deliver the original benefits 0011 0010 1010 1101 0001 0100 1011 • This is conducted by the user or client group who requested the projects 48
    • Configuration, Compatibility, Recovery & Regression Test • This testing is performed finding the various supporting combination of hardware & software • It is nothing but combination of software itself • It is nothing but a features built into the application for handling interruption 0011 0010 1010 1101 0001 0100 1011 • Returning to the actual points/page in the application • Tester-> 1000-test cases-> 100 defects-> developer-> tester 49
    • Roles and Responsibilities Test Manager: Manages the entire testing activity (approve) Test Leader: Prepare the test plan, review 0011 0010 1010 1101 0001 0100 1011defect tracking, and test cases, monitor provide resources. Test Engineer: Prepare test case design (test risk & reports) 50
    • Test Environment • Software Requirements • Hardware Requirements • Tools that are needed 0011 0010 1010 1101 0001 0100 1011 51
    • Test Case Design (Manual) • Test Case ID: Sys_xyz_01 (unique) • Test Case Description: A short note about the testing • Test Case Procedure: Each & every step has to be mention in test case procedure • Test I/P or Test Data: Input data • Expected Result: The expected outcome of test cases (as per 0011 0010 1010 1101 0001 0100 1011 requirements) • Test Execution: What we have received after execution that is actual result. • Expected Result = Actual Result, the test is pass otherwise it is fail. • Test Log: Test log means how many test cases executed and how many pass and fail? (Result) 52
    • Bug Life Cycle New (Tester) Open (Developer) 0011 0010 1010 1101 0001 0100 1011 Fixed (Developer) Closed (Tester) Or Reopen (Developer) 53
    • Defect Tracking All the failed test execution/defects will come under the defect tracking Defect Tracking Contains: • Defect ID: Sys_Def_xyz_01 • Test Case ID: Sys_xyz_01 • Defect Description • Status of Defect 0011 0010Reproducible • 1010 1101 0001 0100 1011 • Detected by whom • Assigned to whom Reproduce: If developer asks to reproduce any defect tester should reproduce 54
    • Test Cases ID Description Test Cases ER AR Status 01 Testing “OK” button Agent It should Accepted Pass Name>4 accept chars & Password “mercury” 02 Testing “OK” button Agent It should Not accepted Fail Name>4 accept 0011 0010 1010 1101 0001 0100 1011 chars & Password “mercury” 03 Testing “OK” button Agent It shouldn’t Accepted Fail Name<4chars accept & Password “mercury” 04 Testing “OK” button Agent It shouldn’t Not accepted Pass Name<4chars accept & Password “mercury” 55
    • • Conduct audit before final delivery • Audit activities are carried out as per QA Process • Install software in operation environment – Installation certificate is obtained 0011 0010 – Installation0001 0100 recorded 1010 1101 statistics are 1011 • Acceptance testing are carried out • User training is provided (if within scope) • Obtain acceptance certificate – Acceptance note; – Acceptance over phone/fax/email 56