  • Federal Projects - USFW Region 3

    1. 1. Federal Projects<br />Progressive Consulting Engineers, Inc.<br />
    2. 2. Firm Background<br /><ul><li>Progressive Consulting Engineers, Inc. (PCE)
    3. 3. Civil Engineering Consulting Firm
    4. 4. Founded in 1980
    5. 5. 1st USFW Project in 1988 – Region 3</li></ul>Registered in CCR<br />Small Business / Minority Owned<br />Currently Under IDIQ Contract with Region 3<br />
    6. 6. Firm Background Cont…<br /><ul><li>Transportation Engineering
    7. 7. Minnesota Department of Transportation
    8. 8. Road and bridge work for Counties and Townships
    9. 9. Water Supply
    10. 10. Water System Modeling
    11. 11. Pump Stations
    12. 12. 1,200-48,000 GPM</li></li></ul><li>Firm Background Cont…<br /><ul><li>Hydraulic Engineering
    13. 13. Waterway and Channel Design
    14. 14. Control Structure Design and Rehabilitation
    15. 15. Erosion Repair and Prevention Design
    16. 16. Dam and Spillway Rehabilitation
    17. 17. Watershed Analysis
    18. 18. HEC-RAS Modeling
    19. 19. Bridge Design</li></li></ul><li>Region 3 Project Experience<br /><ul><li>All 8 States</li></li></ul><li><ul><li>Minnesota, Agassiz NWR
    20. 20. 61,000 Acres in Northern Minnesota</li></li></ul><li>
    21. 21.
    22. 22.
    23. 23. <ul><li>Minnesota, Agassiz NWR
    24. 24. Road and Water Management Canal Rehabilitation
    25. 25. Road Deterioration
    26. 26. Canal Deterioration
    27. 27. Erosion
    28. 28. Overland Flooding (1997)
    29. 29. Animal Burrowing</li></li></ul><li>Agassiz NWRWater Management Canal/Road Project<br /><ul><li>PCE responded
    30. 30. Site Visit / Report
    31. 31. Topographic Survey
    32. 32. Geotechnical Analysis / Report
    33. 33. Two Phase Design </li></li></ul><li>Agassiz NWRWater Management Canal/Road Project<br /><ul><li>8 reaches totaling more than 12 miles
    34. 34. Phase 1
    35. 35. 4 Reaches
    36. 36. 7.6 miles
    37. 37. Phase 2
    38. 38. 4 Reaches
    39. 39. 5.2 miles</li></li></ul><li>Agassiz NWRWater Management Canal/Road Project<br /><ul><li>60 Days / Phase
    40. 40. Average design rate of 800 ft / day
    41. 41. How did we do it?
    42. 42. Planning and Scheduling
    43. 43. Internal Deadlines
    44. 44. Review Timelines
    45. 45. Quality Control</li></li></ul><li>Agassiz NWRWater Management Canal/Road Project<br /><ul><li>Civil 3D Design Software
    46. 46. Reduced Plan Revision Time
    47. 47. Higher Detailed End Product
    48. 48. Improved Visualization
    49. 49. Dynamic Cost Estimation
    50. 50. GPS Machine Control</li></li></ul><li>
    51. 51. Agassiz NWRWater Management Canal/Road Project<br /><ul><li>Met every deadline
    52. 52. 50% (30 days)
    53. 53. 95% (50 days)
    54. 54. 100% (60 days)
    55. 55. Satisfied Regional Engineer and USFW Staff!
    56. 56. Craig Swedenborg
    57. 57. 612.713.5265</li></li></ul><li><ul><li>Minnesota, Agassiz NWR
    58. 58. Radial Gate Structure Rehabilitation</li></li></ul><li>Agassiz Radial Gate Structure<br />
    59. 59. Built in 1967<br />
    60. 60. Cross-Section of Structure<br />
    61. 61. Agassiz NWRRadial Gate Structure Rehabilitation<br /><ul><li>Tasks
    62. 62. Replace 2 Radial Gates
    63. 63. New Electric Hoist System
    64. 64. Replace Hand Railing
    65. 65. Rehabilitate Concrete Structure
    66. 66. Concrete Curbrail Extension
    67. 67. W-Beam Guardrail</li></li></ul><li>
    68. 68. Agassiz NWRRadial Gate Structure Rehabilitation<br /><ul><li>Design Challenges
    69. 69. Maintain Flow through One Gate
    70. 70. 150 cfs to 1800 cfs
    71. 71. Required 10 foot of hydraulic protection above work area.
    72. 72. Limited foot print for cofferdam. </li></li></ul><li>Agassiz NWR Radial Gate Structure Rehabilitation<br /><ul><li>Met every deadline
    73. 73. 50% (30 days)
    74. 74. 95% (60 days)
    75. 75. 100% (70 days)
    76. 76. Satisfied Regional Engineer and USFW Staff!
    77. 77. Craig Swedenborg
    78. 78. 612.713.5265</li></li></ul><li>
    79. 79. <ul><li>Squaw Creek NWR, MO
    80. 80. Radial Gate Structure Rehabilitation</li></li></ul><li>
    81. 81.
    82. 82.
    83. 83. Squaw Creek NWR Radial Gate Structure Rehabilitation<br /><ul><li>Tasks
    84. 84. Replace 3 Radial Gates
    85. 85. New Electric Hoist System
    86. 86. Replace Hand Railing
    87. 87. Rehabilitate Concrete Structure</li></li></ul><li>Squaw Creek NWR Radial Gate Structure Rehabilitation<br /><ul><li>ARRA
    88. 88. 60 days
    89. 89. Detailed Concrete Rehabilitation Design
    90. 90. Challenging Upstream / Downstream Conditions</li></li></ul><li>Squaw Creek NWR Radial Gate Structure Rehabilitation<br /><ul><li>Met every deadline
    91. 91. 50% (30 days)
    92. 92. 95% (50 days)
    93. 93. 100% (60 days)
    94. 94. Satisfied Regional Engineer and USFW Staff!
    95. 95. Craig Swedenborg
    96. 96. 612.713.5265</li></li></ul><li> Title<br />
    97. 97. Crab Orchard, IL<br />Water Line Replacement<br />and System Modeling <br />
    98. 98. Crab Orchard NWR<br />Purchases Water from Herrin, IL<br />Sells it to Southern Illinois University<br />Two Water Towers<br />Booster Pump Station<br />Watermains from 4” to 16” (deteriorated)<br />
    99. 99.
    100. 100. Crab Orchard NWR Water System Analysis<br />Tasks<br />Construct Water System Model<br />Assess Fire Flow Protection<br />Replacement System Optimization <br />
    101. 101. Other Projects with Region 3<br /><ul><li>Wisconsin
    102. 102. Trempealeau NWR (Bridge Design)</li></li></ul><li>Other Projects with Region 3<br /><ul><li>Wisconsin
    103. 103. Genoa Fish Hatchery (Pump Station/River Intake)</li></li></ul><li>Other Projects with Region 3<br /><ul><li>Indiana
    104. 104. Big Oaks NWR Bridge Replacement Study</li></li></ul><li>Other Projects with Region 3<br /><ul><li>Michigan
    105. 105. Shiawassee NWR, Spalding Drain Levee </li></li></ul><li>Erosion Protection Projects<br /><ul><li>Army Corps. of Engineers
    106. 106. HW 169 Emergency Bank Protection
    107. 107. Minnesota River
    108. 108. Feasibility Report
    109. 109. Environmental Assessment
    110. 110. Design of Riprap Protection</li></li></ul><li>
    111. 111.
    112. 112.
    113. 113. Erosion Protection Projects<br /><ul><li>Army Corps. of Engineers
    114. 114. HW 28 Emergency Bank Protection
    115. 115. Le Sueur River, Blue Earth, MN
    116. 116. Feasibility Report
    117. 117. Environmental Assessment
    118. 118. Design of Riprap Protection</li></li></ul><li>Other Projects with ACOE<br /><ul><li>Onalaska Dam, Wisconsin
    119. 119. Phased over two seasons
    120. 120. Maintained a 500 cfs minimum flow rate to prevent fish kill</li></li></ul><li>Other Projects with ACOE<br /><ul><li>Renville Park Project – Minot ND
    121. 121. Souris River Flood Control
    122. 122. 7,103 feet of levees
    123. 123. Control Structures
    124. 124. Reconstruction of Roadway</li></ul>“I wish to thank you and your team for the excellent design support your provided.”-Colonel Kenneth S. KasprisinCurrent Assistant Secretary of Homeland Security<br />
    125. 125. Summary<br /><ul><li>Since 1988, PCE has provided high-quality design services on dozens of projects for Region 3 and other federal agencies.
    126. 126. At this time, we have an IDIQ with Region 3 that allows us to contract directly with Region 6.
    127. 127. We formally offer our design services and look forward to new horizons with the Mountain - Prairie Region.</li></li></ul><li>Thank you for your time.<br />Any Questions?<br />

    ×