Your SlideShare is downloading. ×
0
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Dasco Intro
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Dasco Intro

184

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
184
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
7
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Dasco Engineering 24747 Crenshaw Blvd. Torrance, Ca. 90505 310-326-2277
  • 2. Background - Who is Dasco ?• 45 years supplying machined parts to the aerospace industry.• Recognized as a leader in machining complex hardware.• Specialize in machining titanium and other hard and exotic alloys.• Strong engineering team utilizing state-of- art software and hardware.
  • 3. Core Business Strategy• Support Prime aerospace manufacturers• Industry leader for titanium machining• Increase value added product deliveries• Gold Quality and Delivery recognition• Offer partner/risk relationships
  • 4. Facilities Torrance Facility 66,000 sq. ft. Main facility: machining, sub-assembled structures and final source inspection. Long Beach Facility 40,000 sq. ft. Multi-spindle rough and finish machining of hard metals Total 106,000 sq. ft.
  • 5. Manufacturing Equipment Torrance Main Facility
  • 6. Vertical Machining
  • 7. Horizontal Machining• Makino MC1210, 50-taper, pallet changer, 99 tools, 36” sq. pallets, 49” x 39.5” x 31.5” work envelope, 6,600 lb. pallet load.• Nigata 4-Axis HN100B, 50-taper, pallet changer, 60 tools, 49” sq. pallets, 78” x 55” x 40” work envelope, 6,600 pallet load.
  • 8. Multi-Spindle Machining(17) Multi-Spindle Gantriesand CNC Profilers
  • 9. Multi-Spindle Machining(5) Cincinnati 5-axis Gantries with(75) HP high torque spindles
  • 10. Hinge ManufacturingHinge machining and drilling upTo (20) feet in length
  • 11. Assembly ShopExperienced with riveting, hardware installation, bushing and bearinginstallation for small to medium assembled components up to 20 feet in size
  • 12. Manufactured Products Titanium wing spars Titanium FramesTitanium wing attach fitting
  • 13. Manufactured Products cont.Addition products manufactured include: engine mounts, stringers,cords and machined frames
  • 14. Assembled Products Assembled aircraft hingesSheet metal assemblies Main landing gear structure
  • 15. Assembled Products
  • 16. Assembled Products Business Jet Upper Cabin Door Assembly
  • 17. Aircraft Hinges
  • 18. 6-Axis CNC Tool Grinding•State-of-the-art CNC equipment.•Design and Manufacture of high-precision carbide cutting tools.•Advanced tool design software.•Development and test ofadvanced geometry tools.•Highly accurate/repeatable toolregrinding.
  • 19. CNC Programming• CATIA V4 and V5• NCL 502, Version 9.6 CAD/CAM System• Vericut 6.1 Tool Path Verification• Postworks, 6-Axis Post-Processor
  • 20. Quality System• AS9100 – certified third party approved.• Mitutoyo “Bright 1230” 5-Axis CMM, 118” x 48” x 40” work envelope• Mitutoyo “Bright 916” 5-Axis CMM, 80” x 36” x 36” work envelope.
  • 21. Management Systems• “JobBOSS” manufacturing management software system in use since 1998 – provides real-time data capture via barcode. ° Quote Processing ° Order Processing ° Material Control ° Shop Floor Control ° Labor Reporting With over 4,300 installations worldwide, ° Cost Analysis JobBOSS is the established leader in ° Shipping shop management for the machine shops. ° Accounting
  • 22. Production Control System“JobBOSS” system coordinated with MS Access data base. Master Ship Plan PROD. REL. MASTER MONTHLY SHIP PLAN PLANNING NC PROG. TOOLING STATUS Status: 1=On Time, 2=Schedule Concern, 3= Late LATE MAR APR MAY JOB NO. CUSTOMER P/N DESCRIPTION PM COMMENTS QTY DATE QTY DATE QTY DATE QTY S2467 BAC MIL-WA 5-96763-19 HINGE ASSY JFK SEAN - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED S2468 BAC MIL-WA 5-96763-20 HINGE ASSY JFK SEAN TO MACHINE - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED S2469 BAC MIL-WA 5-96763-23 HINGE ASSY JFK SEAN TO MACHINE - HELD FOR MATERIAL PROBLEM - VIR TO BE SUBMITTED 1673 BAC MIL-WA 5HF75308-105 SUPPORT FITTING JFK X X X 1 TMG 2 3/18 2 1883 BAC MIL-WA 5HF75712-105 AFT FRAME JK STAGED FOR CNC 6/5/02 1883-NRE BAC MIL-WA 5HF75712-105 S/UP JK 1884 BAC MIL-WA 5HF75712-107 AFT FRAME JK NEED PROGRAM 2 3/22 2 1884-NRE BAC MIL-WA 5HF75712-107 NRE JK 1727 BAC MIL-WA 5HW82316-101 SUPPORT JK X X X 1 CNC - FADALMATL ON ORDER - DELY 04/01/03 1725 BAC MIL-WA 5HW82316-101 STRUT SUPPORT JK X X X 1 CNC - FADAL(2) PCS STOCK 1726 BAC MIL-WA 5HW82316-102 SUPPORT JK X X X 1 CNC - FADAL(2) PCS. STOCK 5 4/7 1728 BAC MIL-WA 5HW82316-102 SUPPORT JK X X X 1 CNC - FADALMATL ON ORDER - DELY 04/01/03 1873 BAC MIL-WA 5HW82492-103 SPLICE JK 1682 BAC MIL-WA 5HW82492-103 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15 1379 BAC MIL-WA 5HW82492-103 SPLICE JFK X X X X 1 STOCK THRU JULY - AUG/SEP NEED MACHINING 1874 BAC MIL-WA 5HW82492-104 SPLICE JK 1683 BAC MIL-WA 5HW82492-104 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15 1380 BAC MIL-WA 5HW82492-104 SPLICE JFK X X X X 1 STOCK THRU JULY - AUG/SEP NEED MACHINING 1875 BAC MIL-WA 5HW82492-105 SPLICE JK 1684 BAC MIL-WA 5HW82492-105 SPLICE JFK X X X 1 MATERIAL ON ORDER 2 4/15 1381 BAC MIL-WA 5HW82492-105 SPLICE JFK X X X X 1 STOCK THRU SEPT. 1382 BAC MIL-WA 5HW82492-106 SPLICE JFK X X X X 1 STOCK THRU SEPT. 1876 BAC MIL-WA 5HW82492-106 SPLICE JK Machine Loading 9130 1704 5/24 9430 1749 6/12 9430 1750 6/12 9230 1758 6/18 9330 1766 7/12 9130 1744 7/16 9430 1753 8/12 9430 1754 8/12 9130 1748 8/26 9330 1855 9/25 9330 1856 10/2 9430 1844 10/2 9130 1705 5/24 9130 1706 6/14 9430 1711 5/31 9430 1712 5/31 9430 1751 7/22 9330 1761 6/14 9330 1762 6/18 9330 1765 7/12 9130 1745 7/16 9430 1752 7/22 9330 1854 8/26 7/2 7/9 7/9 8/6 9/4 6/3 6/3 6/5 7/2 8/8 8/6 9/4 9230 1759 9130 1747 9430 1843 9230 1756 9230 1757 9330 1764 9130 1743 9230 1755 9330 1763 9230 1760 9130 1746 9430 1842 KURAKI 05 180S SNK 3-SPIND. #1 11 9230/9330 9130/9430 9130/9430 9230/9330 9130/9430 9230/9330 9/4 7/9 7/9 9/4 9/4 9955843-5/-6 CIN. 5-AXIS 04 2305-101 / 1330 S2458-1/-2 2305-101 / 1330 2305-102 / 1331 2305-102 / 1331 2305-102 / 1331 7/13 7/13 9/9 8/25 9/24 10/22 10/22 0055-2013 2685-104 / 2685-104 / 2685-104 / 2685-103 / 2685-103 / 2685-103 / 2685-103 / SNK 5-AXIS #1 / 1465 1697A 1697B 1697C 1696C 1696D 1696E 1696F 6/16 6/16 6/2 7/27 7/27 6/28 6/30 6/30 6/30 7/13 7/30 7/30 7/30 9/28 8/25 9/14 2675-102 / 2682-103 / 2682-103 / 2682-103 / 2675-101 / 2685-103 / 2685-103 / 2679-104 / 2679-103 / 2675-102 / 2675-102 / 2677-102 / 2677-102 / 2679-104 / 2677-101 / SNK 5-AXIS #2 1319J 1694A 1694B 1694C 1688B 1696A 1696B 1323J 1692C 1689A 1689B 1691C 1321J 1693C 1690C 2685-103 / 2685-104 / 2677-101 / 2677-102 / 2685-103 / 2685-104 / 2679-103 / 2677-102 / 2677-101 / 2685-103 / 2685-104 / 2682-103 / SNK 3-SPIND. #2 1696B, C 1697A, B, C 1690C,D 1691C 1696D,E,F 1697D,E,F 1692D,E,F 1691D,E,F 1690E,F,G 1696G,H,I 1697G,H,I 1694D,E,F

×