Paris 2.0 25 Sept 2009: Return on Attention as IT and management metric
Upcoming SlideShare
Loading in...5
×
 

Paris 2.0 25 Sept 2009: Return on Attention as IT and management metric

on

  • 1,314 views

Talk on Return on Attention at Paris 2.0, 25 Sept. 2009.

Talk on Return on Attention at Paris 2.0, 25 Sept. 2009.

10 mins talk, in French, with discussion.

More details in English blog post here: http://coreedges.com/uPHa

Statistics

Views

Total Views
1,314
Slideshare-icon Views on SlideShare
1,312
Embed Views
2

Actions

Likes
0
Downloads
4
Comments
0

2 Embeds 2

http://www.slideshare.net 1
https://www.linkedin.com 1

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

CC Attribution-NonCommercial-ShareAlike LicenseCC Attribution-NonCommercial-ShareAlike LicenseCC Attribution-NonCommercial-ShareAlike License

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Paris 2.0 25 Sept 2009: Return on Attention as IT and management metric Paris 2.0 25 Sept 2009: Return on Attention as IT and management metric Presentation Transcript

    • Comment évaluer un outil “Entreprise 2.0”: le concept de Rendement de l’Attention Allouée (Return on Attention) Julien Le Nestour www.coreedges.com Paris 2.0 jln@coreedges.com Septembre 09 @jnestour CORE EDGES CORE EDGES
    • ashley rose EUSKALANATO CORE EDGES
    • Perception Cognition CORE EDGES
    • L’attention est une des ressources les plus rares, et continue de se raréfier . CORE EDGES
    • Rare = Précieux CORE EDGES
    • Rendement de l’Attention Allouée (Return on Attention) CORE EDGES
    • Rendement de l’Attention Allouée RAA= X X $$$ Productivité Valeur Diff. Population Relative CORE EDGES
    • Rendement de l’Attention Allouée RAA= X X $$$ Productivité Valeur Diff. Population Relative Multiple facteurs, contraints par le maillon le plus faible CORE EDGES
    • CORE EDGES
    • CORE EDGES
    • CORE EDGES
    • CORE EDGES
    • Rendement de l’Attention Allouée - unique métrique pour projets IT - métrique pour projets 2.0 - est impacté par tout facteur non nul - est contraint par le maillon le plus faible Un RAA positif et important est l’unique facteur de succès CORE EDGES