Your SlideShare is downloading. ×
  • Like
Plans andspecificationsmep design
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Plans andspecificationsmep design

  • 405 views
Published

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
405
On SlideShare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
2
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. PLANS & SPECIFICATIONS PROJECT M / E / P DESIGN SELECT DESIGN SCHEMATIC PROGRAMMING TEAM DESIGN A  Define Need  Architects  Major Systems Definitions  Define Approach  Mechanical Engineer  Equipment Definitions  Electrical Engineer  C / S Engineer  Space Planners  Lab Planners  Construction Manager  Define Approach  Etc.JohnLanger Consulting Prepared by Rev. 1 - 6/9/94 Mike Daye Rev. 2 - 2/19/11 using MS Visio
  • 2. PLANS & SPECIFICATIONS PROJECT M / E / P DESIGN DESIGN 100% DESIGNA DEVELOPMENT DEVELOPMENT B 10% REVIEW M/E/P M/E/P COORDINATION COORDINATION C (CONSULTANTS)  Initial Plans/ Selections  Refine Plans  Initial Elevations/ Details  Refine Systems Subscriptions  Define / Assign Zones  Develop Initial Systems and Equipment Specifications  Establish / Coordinate CAD  Construction Management Review  Requirements & Protocol  Coordination With Other Trades  Construction Manager Review  Review Design M/E/P Coordination  Initial Review By Design / Build Fire  Develop Discrete M/E/P Budgets Protection Subcontractor  Constructability Reviews  Initial Value Engineering  Preliminary Construction Schedule  Review Lab Space Planning  Review Structural Design  Review Interstitial Spaces  CAD Coordination
  • 3. PLANS & SPECIFICATIONS PROJECTS M / E / P DESIGN 50% Construction 100% Construction (RFP) Request forB Document Review Issue Proposals D  Pre Bid Meetings  Job Site Visits  Design Clarifications  Value Engineering  Addenda  Quality Systems  Safety M/E/P M/E/PC Coordination Coordination  Finalize Budget  Review / Refine Plans  Finalize Schedule  Refine Equipment Types  Finalize Specifications  Review / Refine Specifications  Review / Refine Plans  Review Structural Design  Construction Manager  Review Lab / Space Planning Review  Construction Management Review  Refine / Incorporate Final VE  Continue Value Engineering  Refine / Incorporate Constructibility Issues  Continue Constructibility  Finalize M / E / P Coordination Reviews  Finalize Interstitial Spaces  Refine Construction Budget  Refine Construction Schedule  Selective Review By M / E/ P Subcontractors  Review / Refine Interstitial Spaces  Initiate Commissioning Specifications
  • 4. PLANS & SPECIFICATIONS PROJECTS M / E / P DESIGN CONTRACT FCO & OWNERD AWARD CONSTRUCTION COMMISSIONING ACCEPTANCE & NTP  Qualifications  RFIs / FQs  P & ID Punchlist  Contract Closeout  Short List  DCN  HVAC  Warranty  Presentation E  Changer Order Mngt.  Electrical  Award  Submittals Review  Mechanical  Shop Drawings Reviews  Fire Protection  Product Substitutions  Data / Telecommunications  Coordination of Subs  Elevators  Process Progress Payments  Emergency Panel  Self-Perform Work  Instrumentation  Inspection & Testing  Life / Safety  As-Builts  Start Up MTGS  Punchlist  Verify Operation of Equipment  Coordinate MEP in Walls &  Owner Training Overhead  O & M Manuals  Monitor Schedule  Calibration  Punchlists BT GC & MEP  Verification of Installation to Plans Designers and Specifications  Quality Assurance  Complete CAD As-Builts  Safety
  • 5. PLANS & SPECIFICATIONS M / E / P DESIGNE PRE - CONSTRUCTION M/E/P COORDINATION  Complete M/E/P Coordination  Drawing Overlays  Conflict Resolution  Subcontractor Sign-Offs  Submit to M/E/P Designer(s) for Final Review  Submittals  RFIs / FQs  Product Substitution