Aap Presentation


Published on

  • Be the first to comment

  • Be the first to like this

No Downloads
Total Views
On Slideshare
From Embeds
Number of Embeds
Embeds 0
No embeds

No notes for slide

Aap Presentation

  1. 1. Client: Liverpool Women’s Hospital Project: The Hewitt Centre, developed in conjunction with the Trust and a private sector provider to house laboratory and clinical space
  2. 2. Client: Nechells Baths, Birmingham Project: Restoration and conversion of the Victorian baths into a communityuse building with facilities for the local population
  3. 3. Client: Joseph Chamberlain College Project: New college development which has won the RIBAAward and the RIBA / LSC Further Education Building Design ExcellenceAward
  4. 4. Client: Places For People Project: Programme management for roll out project for 75 green spaces projects across the North, Midlands, Bristol and South-East
  5. 5. Client: Middlesbrough College Project: New £70m College housing 17,000 students in a visually stunning 5-storey building. Part of Tees Valley regeneration scheme. Received RICS Renaissance Award
  6. 6. Client: The Old Grammar School and Saracen’s Head Project: Refurbishment of the Old Grammar School - winner of the BBC2 Restoration programme in 2004
  7. 7. Client: Furness College Project: Main Campus Estate renewal providing a new consolidated estate and regeneration of the waterfront area in Barrow in Furness
  8. 8. Client: Dromex Project: Construction of the 70m A4/E40 Trans European Motorway in Poland
  9. 9. Client: Barnsley College Project: Internationally acclaimed actor Patrick Stewart OBE opened the £4m New SciTech Centre
  10. 10. Client: Opal Property Group Project: Design and construction of multi-storey student residences in Sheffield providing 1,000 bedrooms, 15 student flats and mixed use retail and service areas
  11. 11. Client: GMPTE Project: New £2.5m state-of-the-art bus station in Oldham town centre
  12. 12. Client: Liverpool John Moores University Project: Creation of new premises for the Faculty of Business & Law and the Screen Academy being part of the Faculty of Media, Arts & Social Science
  13. 13. Client: Bowesfield Business Park Project: Project Management, Quantity Surveying and CDM Coordination services on Phase 1 of a multi-phase Business Park
  14. 14. Client: Voyager School Project: New build school, significant extension and remodelling of two existing schools for Peterborough Council's flagship PFI project
  15. 15. Client: Travis Perkins plc Project: Project Monitoring for new Travis Perkins branch in Blackpool
  16. 16. Client: Macclesfield College Project: The Earl of Wessex visits the new £38m Macclesfield Learning Zone campus which includes a new College, Sixth Form, High School, Special School and Sports Centre
  17. 17. Client: GMPTE Project: The high quality fit-out of the 11 single and double stand Bus /Light Rail Interchange at Shudehill, Manchester
  18. 18. Client: University of Manchester Project: £25m Learning Commons project providing a Hub for advanced learning technologies and learning spaces
  19. 19. Client: Austrian & American Investors Project: Construction of Carregal & Parades power plants in Portugal
  20. 20. Client: Newcastle University Project: Barras Bridge development, a £38m landmark building in the city centre providing a Business School and Student Services building
  21. 21. Client: Barnsley College Project: Construction of a new main teaching facility including one block of 7 storeys and one block of 9 storeys with central covered atrium
  22. 22. Client: Opal Property Group Project: Construction of student accommodation in Nottingham comprising of 1157 beds along with 2 retail units and 7 trade units
  23. 23. Client: Bury College Project: Minister of State, Bill Rammell, officially opened The Beacon Centre
  24. 24. Client: GMPTE Project: The installation of new state-of-the-art Bus Station facilities including the latest Electronic Information Display Systems throughout Greater Manchester
  25. 25. Client: Austrian Investors Project: Erimida & Villa Hydropower Plant, Portugal
  26. 26. Client: Liverpool Community College Project: AA Projects has a 10 year partnership with the College completing ten major projects and £100m of regeneration
  27. 27. Client: Persimmon Homes Project: Development of 45 high specification two and three bedroom apartments on site adjacent to the River Mersey
  28. 28. Client: University of Manchester Project: £11m SCAN Residential Scheme to develop new build student residential accommodation providing 300 en-suite bedrooms
  29. 29. Client: Bury College Project: A Theatre Showcase performance staged in the new £6m Beacon Centre
  30. 30. Client: Malvern Heritage Project Project: Acting as Mentor and Monitor on this multi- purpose project. Includes restoration of natural spring wells, introduction of sheep to the hill slopes and construction of cattle grids
  31. 31. Client: University of Manchester Project: £8m new build, multi-storey car park that provides 947 parking spaces over six levels with an integrated security office
  32. 32. Client: Cambridgeshire County Council and Equitix Project: £250m 15 school BSF programme
  33. 33. Client: Parks Options Project: Jubilee Park Regeneration. Redevelopment of city centre urban park and recreational facilities as part of wider £40m Kensington regeneration scheme
  34. 34. Client: Staffordshire University Project: Provision of a new Media Centre at the heart of the Stoke Campus and part of a £240m regeneration of the University Quarter
  35. 35. Client: Belgrade Theatre Project: Assessment and monitoring of the refurbishment of the Grade II theatre in the heart of Coventry
  36. 36. Client: Longley Park Sixth Form College Project: New 7800m² College Building on 3/4 floors, to provide new 6th Form College facilities. Prestigious RIBAAward proudly received
  37. 37. Client: University of Salford Project: New £10m law school providing a 200 seat lecture theatre, seminar rooms, academic offices and a law library. Sustainable design was a key consideration
  38. 38. Client: Newcastle City Libraries Project: The demolition and rebuilding of the City and High Heaton Libraries in their existing sites
  39. 39. Client: Warwickshire Police Authority Project: £32m new build and refurbishment project which will bring all the separate Justice Agencies together in one interconnected building
  40. 40. Client: Bournville College Project: This 23,500m² development of iconic design is the gateway to South Birmingham and will trigger the regeneration of Longbridge with the creation of a new town centre
  41. 41. Client: Honda (Romford) Project: New build showroom and associated workshop and support accommodation
  42. 42. Client: Burnley College / UCLAN Project: New £82m scheme includes a campus for the University of Central Lancashire along with a Sixth Form Centre and Adult Centre for the College
  43. 43. Client: Aquinas College Project: Major campus redevelopment with an estimated development value of £40m, involving the construction of a new College building on the existing campus
  44. 44. Client: Chester Station Project: Refurbishment of existing facilities, improved access, and additional retail outlets at this Grade II listed building
  45. 45. Client: Xaverian College Project: Rt.Hon. Sir Gerald Kaufman officially opened the new £3.5m Mayfield teaching block
  46. 46. Client: Rochdale Council and Inspiredspaces Project: £300m 13 school BSF programme comprising a range of new build and refurbishment projects to be completed over a five year period
  47. 47. Client: Gaza Barracks, Catterick Garrison Project: £83m development providing technical accommodation and infrastructure
  48. 48. Client: Salford City College Project: A new £9.5m project to produce a single PerformingArts Centre including teaching, IT and restaurant and general refurbishment of existing campus
  49. 49. Client: Honda (Edinburgh) Project: New build showroom and associated workshop and support accommodation
  50. 50. Client: Coopers Studios Project: Conversion and refurbishment of a Grade II listed building into studios/offices. Hailed as an exemplar project by English Heritage
  51. 51. Client: Stoke on Trent College Project: Construction of the new £11m Caring Centre of Excellence building on the Cauldon Campus. The three storey building provides approximately 4,200m² of new facilities
  52. 52. Client: Darlington College Project: New £34m college campus development which has Centre of Vocational Excellence status
  53. 53. Client: Sheffield Teaching Hospital Project: Improved space utilisation through the co- location of non-clinical departments within a single new building
  54. 54. Client: Loreto Sixth Form College Project: £20m Phase 4 of the College’s estates strategy. The project has achieved ‘Excellent’ accreditation from the BRE
  55. 55. Client: Transport for London Project: Support to Transport for London in the development and delivery of a range of high profile projects Euston Transport Interchange North Greenwich Transport Interchange
  56. 56. Client: University of Manchester – University Place Project: Prestigious new £62m flagship Student Centre, Conference Centre and Lecture Theatre commanding a prominent site on Oxford Road
  57. 57. Client: Buccleuch Property – Fusion Development Project: A new 50,000ft2 office development in the Stephenson Quarter of Newcastle
  58. 58. Client: Mount Oswalds, Durham Project: Project management of a mixed use development comprising commercial, residential & leisure accommodation
  59. 59. Client: Accrington and Rossendale College Project: Construction of new £8.7m teaching block
  60. 60. Client: University of Bradford Project: £5m refurbishment combining the external space between the library and student union buildings
  61. 61. Client: Cobham Mission Systems Project: Cost Advisor and CDM-C Services for installation of new air to air refuelling rig and fuel farm
  62. 62. Client: St John’s Church of England School Project: Provision of a 1,600m² primary school and 16 place nursery on the site of the original premises in the centre of Blackpool
  63. 63. Client: Nissan Project: New Trim and Chassis Warehouse which provides over 21,500m2 of storage facilities for automotive parts with associated office and welfare facilities
  64. 64. Client: Knowsley Metropolitan Borough Council Project: £7m two form entry joint Catholic and Anglican community primary school
  65. 65. Client: Staffordshire University Project: Provision of a new Science and Technology Centre within the Stoke Campus and part of a £240m regeneration of the University Quarter
  66. 66. Client: Mercian Developments Ltd Project: Construction of a 38,000 sq ft Sainsbury’s store on brownfield site in Wombourne
  67. 67. Client: Mid Cheshire College Project: Hartford Campus redevelopment comprising new construction teaching building, associated office space and social areas and new PerformingArts Centre and Sports Hall
  68. 68. Client: Sheffield Teaching Hospitals NHS Trust Project: £12m development of the Weston Park site to upgrade the services at one of the main cancer treatment centres in the North
  69. 69. Client: Lancaster University Project: Construction of a three storey data centre building comprising approximately 2,500m² internal floor area
  70. 70. Client: Whitworth Art Gallery Project: New build extension and internal refurbishment of the Grade 2 listed gallery
  71. 71. Client: The City of Stoke on Trent Sixth Form College Project: £36m relocation of the College campus to the new city centre University Quarter as part of a £240m education-led regeneration of the city of Stoke on Trent
  72. 72. Client: Bedfordshire County Council / Bedford Borough Council Project: £260m BSF programme
  73. 73. Client: Warwickshire Police Authority Project: Warwickshire Justice Centre in Nuneaton housing Police, CPS, Courts, Probation / Youth Offending Service, Victim & Witness Support
  74. 74. Client: Trafford Housing Trust Project: Refurbishment of office accommodation for the Trust, enabling the consolidation of their field and office based staff
  75. 75. Client: Trafford Youth Village Project: Provision of a 2,000m² new build Youth Village funded through the second round of Myplace funding applications
  76. 76. Client: All Saints Church, Daresbury Project: New 70m² extension providing new visitor’s centre, display and merchandising areas and kitchen to the Grade II listed church where the author Lewis Carroll was baptised
  77. 77. Client: Liverpool County Council & Inspired Partnership Project: Independent Certifier for the £50m Liverpool Central Library PFI project
  78. 78. Client: Derbyshire County Council & Equitix Project: £750m 47 school BSF programme
  79. 79. Client: Sir John Deane’s College Project: Demolition and replacement of over 8,000m²of accommodation and refurbishment of 2,000m² to provide a new college building
  80. 80. Client: Prima 200 Project: New £7.7m Cobridge Community Health Centre bringing together three GP practices and additional health services onto one site
  81. 81. Client: Blackpool and The Fylde College Project: New 2,000m² Central Hub Building. First educational scheme in the North West to be accredited BREEAM Excellent for both Design/Procurement and Post Construction stages
  82. 82. Client: Rochdale Metropolitan Borough Council Project: Demolition of the existing municipal offices and the construction of new purpose built office accommodation for the £50m scheme
  83. 83. Client: Stafford College Project: New £13m teaching facility replacing existing outdated buildings
  84. 84. Client: Sheffield Teaching Hospitals NHS Trust Project: Laboratory rationalisation project, bringing together the Laboratory Medicine Units of the Trust
  85. 85. Client: NHS Stoke on Trent Project: Creation of the Hanley Health and Wellbeing Centre comprising the design, refurbishment and fitting out of an existing 1901 retail premises
  86. 86. Client: Lancaster University Project: Refurbishment of the University’s Faraday Complex, comprising the full refurbishment of the Faraday, Cavendish and Frankland lecture theatres
  87. 87. Client: Onside Northwest Ltd Project: Provision of a 2,700m² Youth Zone, Lottery funded through Myplace. The building is constructed on a brownfield site and includes indoor and outdoor sports facilities
  88. 88. Client: Liverpool Women’s Hospital Project: Remodelling of an existing ward to provide a high quality unit for private patients
  89. 89. Client: Hartlepool College Project: Design and construction of a new college building of approximately 18,993m² over three and four storeys
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.