Helass project overview and lessons v1.0
 

Helass project overview and lessons v1.0

on

  • 711 views

Roger Hall from Plymouth University presents some of the outcomes of the JISC funded Higher Education & Local Authority Shared Service (HELASS) project between Plymouth University and Plymouth City ...

Roger Hall from Plymouth University presents some of the outcomes of the JISC funded Higher Education & Local Authority Shared Service (HELASS) project between Plymouth University and Plymouth City Council along with SERCO

Statistics

Views

Total Views
711
Views on SlideShare
558
Embed Views
153

Actions

Likes
0
Downloads
0
Comments
0

2 Embeds 153

http://storify.com 103
http://amplifiedeventbackupblog.wordpress.com 50

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Helass project overview and lessons v1.0 Helass project overview and lessons v1.0 Presentation Transcript

    • Higher Education & Local Authority Shared Services (HELASS) Roger Hall Plymouth University 12 December 2011
    • By the way........... 1970’s - Bureau services and time sharing e.g. payroll ‘ Shared Services’ isn't new !!
    • The Partnership
    • To explore the possibilities of developing a shared services framework for ICT infrastructure and support services across a higher education institution and a large local authority. Overall Aims
    • Key Objectives
      • Identify ICT based Shared Service opportunities that will deliver cost reduction and/or service improvement
      • Identify standalone ICT based opportunities within Plymouth University and Plymouth City Council
      • Identify suitable candidates for Shared Service pilots
    • Project Team Structure
    • Initial Steps
      • NDAs in place - Collaboration agreement signed
      • Council and University data collection (Serco generated a survey)
      • ICT Practitioners from both orgs attended workshops with Serco ‘Solutions Architect’
      • JISC Enterprise Architecture foundation workshops attended by UoP staff
    • Initial Analysis
      • Documentation (Policies)
      • Staffing
      • Financials
      • Infrastructure
      • Support arrangements and performance
      • Service Volumes (Support Desks)
      • Applications
      • Projects
      • Contracts
      • Service Quality
    • Operational Alignment
      • ICT maturity
        • Both upper quartile
      • Operationally/tactically well aligned – similar platforms and strategies
      • Discussions well facilitated ensuring momentum and progress made
      • Energy and enthusiasm built up as project progressed
      • Early route to savings identified
    • Total current joint annual ICT in scope spend = £13.7m Theoretical annual fully Shared Service cost saving* = £1.671m £7.5m p/a £6.2m p/a But……has multiple complex interlinked obstacles, with significant risk, cost and elapsed time to achieve But……the sum of the parts MAY be greater than £1.671m? SS 1 +SS 2 ………..+SS n > £1.671m p/a ?
      • Scoring Matrix
      • The identified potential Shared Service options were jointly assessed with the UoP and PCC project representatives and allocated a maximum score of 10 against 4 criteria:
      •  
      • Impact . The potential positive impact across the University of Plymouth and Plymouth City Council enterprises. Primary considerations taken into account were projected impact on both the cost and quality of service delivery. Other parameters considered were the strategic or tactical nature of the option and its ability to enable further downstream Shared Services
      •  
      • Cost . Primarily assessed in two dimensions, the first being the absolute cost of implementing the Shared Service and the second being the cost in relation to the potential impact assessed in (a) above
      • Time . An assessment of the elapsed time to fully implement the potential Shared Service, where 10 represents an immediately available option and 1 represents longer than 3 years.
      • Risk . An overall assessment of the risk associated with implementing the potential Shared Service, where 10 equates to no associated risk and 1 equates to an unacceptable level of business risk.
    •  
    •  
      • Forty-five items on identified list
      • Hierarchical mix of business, org, application & technology
      • Have been rated for cost, benefit, timescale & risk
      • Identified potential early-adopters
      • Probably wider and deeper than envisaged?
      • Leads into a long term Shared-Service transformational agenda?
    • Progress To Date
      • High level business cases produced for 5 highest ranking recommendations
      • Recommendations presented to steering group
      • Recommendations currently confidential
      • Governance for ongoing activity in place but not yet tested !
      • A bigger picture has emerged (than the original scope of the JISC funded project). Other potential shared service partners have emerged.
    • Lessons Learned (1)
      • Cultural differences
        • Network openness
        • Security
      • Alliances
        • Geographic
        • Sectoral
      • Timing
        • Investment cycle
        • Organisational change
    • Lessons Learned (2)
      • It can be done!
      • There are tangible benefits and consequential benefits
      • It is helpful to have external stimulus (PM)
      • You need to commit time and resource
      • Senior ICT managers need to believe
      • There has to be senior political buy-in, without this all is lost…
    • Lessons Learned (3)
      • But consider your exit plan at the outset – Have a pre-nuptial agreement
      • The context can change, organisations can change in size, change their policies, be acquired, be split up etc.
    •  
    • Q&A
      • Roger Hall
      • Plymouth University
      • [email_address]
      • +44(0)1752 588934
      • Data-Centre consolidation (4 to 2)
        • - Technology refresh sub-plot
        • - DR/Backup sub-plot
      • HR/Payroll
        • - Migrate PCC to a UoP system (PCC main saving)
      • ICT Procurement
      • Service Desk
      • Knowledge Forums / Exchange
        • - SIGs
        • - Training / SFIA / skills
        • - ITIL