• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Gac presentation
 

Gac presentation

on

  • 1,886 views

 

Statistics

Views

Total Views
1,886
Views on SlideShare
833
Embed Views
1,053

Actions

Likes
0
Downloads
3
Comments
0

3 Embeds 1,053

http://storify.com 1010
http://amplifiedeventbackupblog.wordpress.com 40
http://translate.googleusercontent.com 3

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Gac presentation Gac presentation Presentation Transcript

    • Opportunities and Issues : Estates’ Perspective Grant Charman Deputy Director of Estates University of Leicesterwww.le.ac.uk
    • Introduction• Appointed in 2003• Led University involvement in PFI deal• Wider involvement from 2006• Estates – IT issues prevalent
    • Problems• Three main areas• Themes – Project Controls – People Controls – Building Controls• Key message : Integration
    • Theme 1 – Project Controls• 2003 situation – No project management system – Lack of management information – Projects delivered on-time and on-budget were the exception – Committee reporting weak and haphazard• Solution : Project Management system to provide control and reporting on entire programme
    • Theme 1 – Project Controls• History – 2003 – search started, decision to develop – 2007 – developed system demonstrated – 2009 – identification of solution – 2010 – procurement – 2011 - implementation
    • Theme 1 – Project Controls• The solution; Imprest ?• System written with Higher Education in mind• Flexible and Configurable• Management information, project control, data store/exchange system• “Links to SAP”
    • Theme 1 – Project Controls• Purchase through OGC• Installation has been smooth• Dedicated project manager appointed by Datavisibility• Decision to host off-site
    • Theme 1 – Project Controls• Remaining hurdles – Getting people to use it – changing the system! – SAP integration – MICAD integration
    • Theme 2 – People Controls• Problem with managing maintenance requests• Maintenance helpdesk system created in 2006 on SAP• Extensive development in-house by ITS• How do we control the flow of information and the allocation and control of the staff attending?• Significant improvement on previous • But still flawed
    • Theme 2 – People Controls• Little further progress since 2006• Now identified for further improvement• SAP or off the shelf?• Dare we break the link to finance system?• How believable are claims to link to SAP?• Can we integrate hand-held devices?
    • Theme 2 – People Controls• Now applying Systems Thinking ideas in a review of maintenance before finalising helpdesk requirement• IT integration crucial
    • Theme 3 – Building Controls• Schneider BMS• System installed years ago• Development has been unplanned• Business decision to employ specialist in-house engineer• Transformed system
    • Theme 3 – Building Controls• Better reporting on core functions• Active monitoring of alarm signals• Active link to security lodge system for critical alarms• Resilience improved• New installations and system growth being planned
    • Theme 3 – Building Controls• Future improvements – Fire Alarms – Intruder Alarms – LZC programme applications
    • Where Next?• Increasing levels of integration between systems• Hand helds, mobile devices, social media• Estates still not fully embracing new technology