Township of Langley Community Rail Study Council Presentation April 21 - Presentation Transcript
HIGH LEVEL REVIEW OF LANGLEY TOWNSHIP COMMUNITY RAIL Presented to Township Council April 21, 2008
Agenda
Objectives
Community Rail Study
Related Studies and Background Information
Summary
To provide a High Level Review of Langley Township Community Rail
To provide a brief update on related studies and background information
Objectives
Township Community Rail Study
Builds upon a similar study conducted for the City of Surrey
“ High Level” analysis and review
Key issues identified
Costs and benefits
Final report completed December 2007
Final report amended to reflect new information from other key plans/studies
Community Rail Proposal – Station Locations
Must separate Freight and Passenger Traffic
Interaction of Road/Rail Interface
Freight Trains – 3 minute crossing
Residual impact – 5 to 10 minutes
37 trains (1.5 per hour), impact of up to 20 minutes per hour
Passenger Train – 30 second crossing
Residual impact – 2 to 3 minutes
20 minute frequency – impact of up to 18 minutes per hour
10 minute frequency – impact of up to 36 minutes per hour
Community Rail Study - Key Issues
Freight traffic
2008 – 22 per day
2012 – 27 per day
2021 – 37 per day
Traffic Volumes (Township Data)
200 St - 36,000 to 49,000 vpd
202 St – 2,000 to 25,000 vpd
208 St – 19,000 to 42,000 vpd
216 St – 4,000 to 22,000 vpd
Fraser Hwy – 23,000 to 33,000 vpd
Key Issues - Regulatory and Safety
Road/Rail interaction
Road safety near stations
Pedestrian/Cyclist Safety and accessibility issues
Anti-whistling
Safety Act requirement
BC Hydro approval/indemnification
Southern Railway of BC standards
Double tracking stations
Communications Systems
Assessment and Improvement of at-grade crossings
Federal/Provincial rail transport rules
Environmental Assessment
Potential Ridership
Land Use, population and employment projections
Type/frequency of service
Existing/future travel patterns
Pedestrian/cyclist/transit linkages
Provision of Park and Ride facilities
Duplication of services
Potential Passenger Rail Vehicles
Parry People Movers, LRT cars, BC Hydrogen Highway
Comparable service – ridership of 5,000 to 6,000 per day
Key Issues - Potential Ridership
$82 - $112 million capital cost PLUS
Freight traffic relocation costs or compensation
Right of way acquisition
Passenger station costs
Modifying industrial sidings
Double tracking station area
Parking/pedestrian improvements
New LRT like vehicles
Fare revenue collection system
Train communication and signal systems
future safety/grade separation upgrades along the corridor
$6 million annual operating cost
Key Issues – High Level Cost Estimates
Safety and traffic conflict issues with passenger rail
Must be a physical separation between freight and passenger traffic
Langley not well linked to Abbottsford by community rail
Community rail could draw ridership from future Bus Rapid Transit
Potential Ridership requires further analysis
Success would require:
Capital and operating funding
Strong community, political and financial support
Study Conclusions
Community Rail corridor be protected for the future
OCP changes (City and Township)
Incorporate in TransLink 2040 Outlook
TransLink, Delta, Metro Vancouver, and other agencies encouraged to support efforts of the Fraser Valley Heritage Railway Society
Consider regional effort to find a long term solution to enhance movement of container traffic
Study Recommendations
Related Studies and Background Information
Population and employment projections
Travel Patterns
Sustainability Goals
South of Fraser Area Transit Plan
Technical Assessment of Operating Passenger Rail on the Interurban
Provincial Transit Plan
Provincial Gateway Program
Roberts Bank Rail Corridor Study
Draft Transportation Vision for the FVRD
1. Population and Employment Projections
2. Travel Patterns
3. Sustainability Goals
Integrate transportation and community planning
Encourage and facilitate transit oriented developments
Provide safe and affordable transportation infrastructure
Coordinate with other agencies and groups to improve transit and road service
More complete compact communities
Live/work within Langley
Reduce the need for long commute trips
4. SOFA TP 2031 Network BRT Fraser Hwy 200 Street Highway 1 West Frequent Bus 200 St Highway 1 East 96 Ave 88 Ave 64 Ave Hwy 10 West Fraser Hwy East 32/24 Ave 208 St
Facilities
200 Street Park and Ride/Transit Exchange
Willowbrook Park and Ride/Transit Exchange
5. Technical Assessment of Operating Passenger Rail on the Interurban Corridor
Determine construction costs for passenger rail between Scott Road and Langley City
Right of way with BC Hydro electric transmission poles restricts ability to expand rail infrastructure
CPR Page subdivision has significant coal/container traffic and is subject to potential expansion
Rough Order of Magnitude Costs
Heavy Rail Push Pull - $365,000,000
Heavy Rail DMU - $355,000,000
Light Rail DMU - $590,000,000
Light Rail EMU - $695,000,000
6. Provincial Transit Plan (2020) Expansion of SkyTrain – 6 km to Fleetwood
6. Provincial Transit Plan (2020) (Bus) BRT Fraser Hwy Hwy 1 King George Hwy Golden Ears Bridge
7. Provincial Gateway Program
Highway 1 Bus/HOV Lanes
20 buses, 10-15 minute frequency.
200 Street to Lougheed Mall
Carvolth Transit Exchange/Park and Ride
Transit/HOV Tunnel, vicinity of 202 Street
Willowbrook Transit Exchange/Park and Ride
8. Roberts Bank Rail Corridor Study
196 Street/54 Ave/192 St Combo Overpass Project
Alternate North/South route to 200 Street
TransLink Study on Alignment Options
Provides north/south link from Langley City to Willoughby
Provides link to:
Willowbrook Park and Ride/Transit Exchange
200 Street BRT
Fraser Highway BRT
9. Draft Background Paper for the Fraser Valley Regional District (FVRD) Transportation Vision
Conclusions:
“ Transit needs to be improved at the local, regional and inter-regional level by a factor of four or five. Returns on transit expenditures will not yield optimum benefits unless the region’s communities densify considerably and create fully pedestrian and bicycle friendly communities.”
“ While there is some appetite for expanded rail into the Fraser Valley, the cold hard reality is that the level of demand can easily be met, probably for many decades with rubber tired solutions. Nonetheless steps should be taken to protect rail rights of way for future generations.”
Summary
Limited information from Community Rail Study
Differences from Technical Assessment
Population and Employment projections
Existing Travel Patterns
Sustainability Goals
South of Fraser Area Transit Plan
Provincial Transit Plan
Gateway Program
Roberts Bank Rail Corridor Study
Fraser Valley Regional District Transportation Vision
Next Steps
Community Rail passenger service be re-examined following successful implementation of a similar type of community rail service between Scott Road and Cloverdale which is significantly greater than the current proposal of a “Heritage Train” (2010). Measures of success include:
Ridership levels and construction costs that justify the significant investment
A type of service that is consistent with the communities sustainability goals
0 comments
Post a comment