PMI-ACP Exam Study Flashcards sample
 

Like this? Share it with your network

Share

PMI-ACP Exam Study Flashcards sample

on

  • 3,382 views

PMI-ACP Study Prep Flashcards

PMI-ACP Study Prep Flashcards

Statistics

Views

Total Views
3,382
Views on SlideShare
2,162
Embed Views
1,220

Actions

Likes
0
Downloads
44
Comments
0

4 Embeds 1,220

http://whitewaterprojects.com 1217
https://wj988.infusionsoft.com 1
http://www.linkedin.com 1
https://www.linkedin.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

PMI-ACP Exam Study Flashcards sample Presentation Transcript

  • 1. Sample only The complete deck is over 150 cardswww.whtiewaterprojects.com/flashcards/
  • 2. What is Evolutionary Design?
  • 3. What is Evolutionary Design?The practice of letting the design emerge fromwell written and refactored code. No bigupfront design is done.
  • 4. What are CRC Cards in XP and why are they used?
  • 5. What are CRC Cards in XP and why are they used?Class Responsibility and Collaboration (CRC) cardsare used to physically role play a design. They areused to simulate in a physical manner theinteractions of the software modules. Each cardrepresents an object of the final code. They helpfocus the team on the object nature of the code.Often the Code Class is written on the top, Theresponsabilites are listed on the left andcollaborating classes are on the right. in a CRCSession a person represents each system anddiscusses thier actions, messages, and interactionswith other objects.
  • 6. What are the rules for managing in XP?
  • 7. What are the rules for managing in XP?"XP uses an Open Work space where people canhear what is going on with others.Sustainablepace is encouraged. Standup meetings are helddaily to coordinate the work among theprogrammersPeople are moved around bothphysically and their paring. "
  • 8. What are the Rules for Coding in XP?
  • 9. What are the Rules for Coding in XP?Customer is always availableUse Coding StandardsCode the Unit Test FirstPair ProgrammingIntegrate oftenCollective code ownership
  • 10. What are the 7 types of Muda waste found in Lean?
  • 11. What are the 7 types of Muda waste found in Lean?"1) Transportation Waste2) Inventory3) Un-necessary motion4) Waiting5) Over-Processing6) Over Production7) DefectsMemory helper: TIMWOOD"