TBEA Solar panels

1,401 views
1,058 views

Published on

Presentation describes about the manufacturing capability of TBEA in the field of manufacturing solar panels and Inverters

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,401
On SlideShare
0
From Embeds
0
Number of Embeds
7
Actions
Shares
0
Downloads
56
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • In the past several years , TBEA Sunoasis has experienced a High speed development , and the coming 3 years , we will step into a GW level in solar production.
  • TBEA Solar panels

    1. 1. TBEA SunOasis CO., LTD.
    2. 2. TBEA Group World’s largest ultra high transformer manufacturer Sales Revenue 5.1 billion USD in 2012 Four main businesses:  Power Transmission & Transformation  Renewable Energy  Advanced Material  Coal-Based Power Plant
    3. 3. TBEA SunOasis Co., Ltd. is a high-tech enterprise dedicated to the research & development, manufacture and utilization of solar energy products and projects. With 2035 employees, including 754 technical employees. In 2012 the total sales income is 660 million USD. 专注于提供可靠、绿色、高效的电力 解决方案 Reliable & Sustainable and Highly- efficient Power Solutions
    4. 4. Reliable, green, efficient complete PV industrial chain Comprehensive, low-cost and high-efficiency power solution
    5. 5. Innovator of silicon wafer production technology Capacity: 350MW/Y, Client: Jinko Solar, Canadian Solar, Hairun Solar, Jinao Solar, CNPV
    6. 6. Module Production Line Module Factory Capacity 250MW/Y BP technology
    7. 7. Xi’an Research and Development Base Research and Development Base
    8. 8. Xi’an Manufacturing Base Manufacturing Base Capacity 1000MW/Y Client: CPI, CGNPC, CECEP
    9. 9. International Marketing Network
    10. 10. TBEA (India) Pvt., Ltd. TBEA (India) Pvt., Ltd. TBEA (India) Pvt. Ltd is to invest $400 million in two phases in Gujarat. TBEA has signed contracts with PGC, NTPC more than US $350 million. 8 of the projects under establishment see below: ITEM NO. ACTIVITIE S TARGET DATES START FINISH Dur. In cd 1. Bhilaspur 2/1/11 7/31/11 181 2. Moga 2/8/11 9/30/11 235 3. Lucknow 2/1/11 9/30/11 242 4. Jhatikara 2/1/11 10/30/11 272 5. Meerut 2/15/11 11/30/11 289 6. Bhiwani 4/1/11 1/15/12 290 7. Fatehpur 2/8/11 10/31/11 266 8. Agra 3/15/11 10/31/11 231 General 2/1/11 1/15/12 349
    11. 11. India-China Solar Meet
    12. 12. TBEA Baroda Base
    13. 13. Baroda Base
    14. 14. Meet with Indian Leader
    15. 15. Solar-energy-level Crystal Silicon ◆156mm×156mm solar energy level poly silicon wafer ◆ 125mm×125mm solar energy level square mono silicon wafer ◆ 6.5inch mono silicon square rod
    16. 16. High-quality Solar Module Jointed with BP SOLAR, TBEA SUNOASIS built the BP Prime CO., LTD., which possesses a united, innovative high-tech R & D team and the world-class high- performance solar module production line.
    17. 17. String Inverter TBEA-GC-5KTL/4KTL/3KTL  Asymmetric H6 topology  Efficiency: 97.4 %  Active /passive anti-islanding detection  MPPT efficiency>99%  Multilingual LCD monitoring interface  Perfect protection function  Multiple communication interfaces  (RS232RS485EthenetBluetooth)  Fourier transform phase lock  IP65 Protection  ISTA Standard Packaging  CGC, CE, SAA, VDE certified
    18. 18. Centralized Grid-Connected Inverter TBEA-GC-500KTL  2 types: with and without transformer  32 digital high-speed DSP redundancy control  Efficiency: 98.7%  Low voltage ride through (LVRT)  Active power adjusted continuously ( 5-110% )  remote regulation  Power Factor (±0.9) can be adjusted  MPPT efficiency>99%  Current harmonics < 3%  Active /passive anti-islanding protection  Metal film DC-link capacitance (25years )  Multilingual touch monitoring interface  RS232RS485EthenetGPRS interfaces  CGC, TUV, CE, ENEL  Protective AC output range: 90%-130% (adjustable)
    19. 19. 1 MW Integrated Inverter Room  Active power adjusted continuously ( 5-100% )  remote regulation  Power Factor (±0.9) can be adjusted  External power and self-power dual power  Max. DC voltage 1000V  Integrated room wiring outside  Low voltage ride through (LVRT)  IP 54 Protection( GB4208-1993)  Fireproofing materials (DN4102-B1)  Optimal structure layout, can be transported by truck Easy installation, 20kPa pressure requirement and foundation flatted Perfect fire-fighting equipment, GB-J16- 87 Building Fire Prevention Design Standard Electrical heating enables the system to work in low temperature ( -35 ~-℃ 25℃ )
    20. 20. 10MW grid-connected photovoltaic power plant In TAIYANGSHAN,NINGXIA province, China Owner: CECEP EPC:TBEA project reference
    21. 21. 6.6MW on-grid roof-top photovoltaic power generation project in Shanghai Hongqiao high-speed railway station Owner: CECEP EPC:TBEA
    22. 22. Owner: CECEP EPC:TBEA 10MW grid-connected photovoltaic power plant In TAIYANGSHAN,NINGXIA province, China 20MW on-grid photovoltaic project power plant Datang International in Golmud, Xinjiang Province
    23. 23. 10MWp Grid-connected PV plant in Jiangsu Province
    24. 24. China Power Investment Corporation 30MWp PV power plant EPC:TBEA
    25. 25. 2.4MW on-grid rooftop photovoltaic power generation project in Wuhan railway station Owner: CECEP EPC:TBEA
    26. 26. 10MW on-grid photovoltaic project in Alashan County, Inner Mongolia Autonomous Region Owner: CGNPC EPC: TBEA
    27. 27. 2MW inverter in Rajasthan
    28. 28. 1MW Parking Lot project in Los Angeles Hydropower Dept., U.S.A
    29. 29. BP Solar, TBEA Guangzhou University town on-grid solar sail power generation demonstration project
    30. 30. 2008 Beijing Olympic Mount Everest Torch Relay Power Project
    31. 31. Tibet Railway Solar Communication Power Station Project
    32. 32. China Mobile Remote Communication Teletower
    33. 33. TBEA Development Strategy High-speed development phase Leap development phase •Silicon wafer 350MW •Module 250MW •Inverter 1000MW •Integrated system 850MW •Silicon wafer 1000MW •Module 500MW •Inverter 1000MW •Integrated system 1000MW 2012 2011--2015
    34. 34. THE END

    ×