Hi-Rise Geo Condo Project

400 views
298 views

Published on

Vince Molinaro
Reasons to go high performance with geothermal and an energy cost analysis of Strata Condominium

Published in: Design
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
400
On SlideShare
0
From Embeds
0
Number of Embeds
42
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Hi-Rise Geo Condo Project

  1. 1. 2012 Green Building Festival Hi-Rise Geo Condo ProjectWhy Go High-Performance? Oct 12th, 2012 Vince Molinaro President, Molinaro Group
  2. 2. Topics  Who we are? What we do?  Why go high performance?  Strata case study  Future projects
  3. 3. Molinaro Group  Who we are
  4. 4. Why Go High Performance?  Leadership – the right thing to do  Competitive advantage  Marketing  Financial
  5. 5. Strata LEED® Certification
  6. 6. Geothermal Heating Each Suite: Geo Field c 76 holes 560 ft Heat Absorption
  7. 7. Geothermal Cooling Each Suite: Geo Field 76 holes 560 ft Heat Rejection
  8. 8. Components of a GeothermalInternal portion Geothermal heatpump unit supplies heating or cooling the spaceExternal portion Fluid is circulated through a network of vertical bore holes to extract/reject heat into the ground from heatpump unit
  9. 9. External Geothermal Field Basement mech room – geo pumps circulate fluid to heat exchanger; central W/W heat pumps deliver building fluid to suite heat pumps Geofield located under building: 76 vertical holes; 560 ft depth Heat rejection in summer; heat absorption in winter
  10. 10. Strata  Long-term energy agreement
  11. 11. Strata Condominium Energy Cost Analysis
  12. 12. Fairview Street Burlington
  13. 13. Thank you

×