TECHNOLOGY OFFICE: Our Lady of Ransom Subdivision Matatalaib, Tarlac City MOBILE NO. 09196436945
SATELLITE OFFICE: Mejia S...
Upcoming SlideShare
Loading in...5
×

Production of foot pavers

143

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
143
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Production of foot pavers

  1. 1. TECHNOLOGY OFFICE: Our Lady of Ransom Subdivision Matatalaib, Tarlac City MOBILE NO. 09196436945 SATELLITE OFFICE: Mejia Street Bamban, Tarlac MOBILE NO. 09185895407 SATELLITE OFFICE: 399 Sn. Juan St. Sto. Domingo, Angeles City MOBILE NO. 09228490909 Email: jclk4_gobac@yahoo.com SEC Reg. #: CN200700710 Website: www.gobac.isgreat.org PRODUCTION OF FOOT PAVERS OUT OF RESIDUAL WASTES Equipment use: G.O.B.A.C. PORTABLE PLASTIC SHREDDER / RESIDUAL PULVERIZER Materials: • Cement • Pulverize Residual Waste • Sand • Water THREE CLASSIFICATION OF MIXTURE Class A Class B Class C ½ Bag of Cement ½ Bag of Cement ½ Bag of Cement 3 c/s Sand (lahar) 4 c/s Sand (lahar) 5 ½ c/s Sand lahar ¾ kilo Pulverized plastic 1 kilo Pulverized plastic 1 ½ kilo Pulverized plastic 18 liters Water (Dry) 20 liters Water (Dry) 20 liters Water (Dry) =74 pcs. Production =98 pcs. Production =135 pcs. Production

×