P4 Architecture by Jasper Moelker

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

0 comments

Post a comment

    Post a comment
    Embed Video
    Edit your comment Cancel

    Favorites, Groups & Events

    P4 Architecture by Jasper Moelker - Presentation Transcript

    1. Teleport portal to development MSc5 Hybrid Buildings A 08 October 2009 - P4 Jasper Moelker tutors: ir. Roberto Cavallo ir. Henk Mihl ir. Peter van Swieten
    2. Teleport portal to development Study question: ‘By what design intervention can the center of the Teleport Area be transformed into a more efficient, continuous and liveable environment?’
    3. study question urban analysis objectives URBAN objectives concept urban concept building design BUILDING masterplan circulation building construction installation facade layout system system proof system light & visibility by case study mixed program objectives BLOCK flexibility concept appearance cluster design proof system by case study
    4. study question urban analysis objectives URBAN objectives concept urban concept building design BUILDING masterplan circulation building construction installation facade layout system system proof system light & visibility by case study mixed program objectives BLOCK flexibility concept appearance cluster design proof system by case study
    5. Urban design Location // Teleport Teleport
    6. Urban design Analysis // zoning a o n s y l o n i
    7. Urban design Analysis // infrastructure Higway A10 Cruise Terminal Train Metro
    8. Urban design Analysis // adjacent areas ( Amsterdam center ) A10 highway office area office area metro Sloterdijk train station car, bus, tram
    9. Urban design Objectives TELEPORT office area TELEPORT office area Sloterdijk station OBJECTIVES: > re-connect > intensify > humanize
    10. Concept Urban design Concept // re-connect Teleport as transport hub the membrane a green “band aid”
    11. Urban design Concept // intensify
    12. Urban design Concept // humanize
    13. Urban design ves Masterplan // approach --> housing mixed --> offices --> shops program --> catering industry --> other facilities --> highrise multiple layers --> facilities --> slow traffic } program > re-connect > intensify ify --> fast traffic } infrastructure > humanize n urban spacee --> extend train platforms optimized --> bus / tram terminal --> parking facilities infrastructure --> distribution routes --> separate slow traffic --> visibility & overview --> wide street profiles comfort --> light --> parks & terraces --> green & safety --> control people flow --> use of daylight --> closeable areas --> physiological aspects
    14. Urban design Setting Masterplan // setting Highway A10 Highway A10 Sloterdijk Station Sloterdijk Station
    15. Urban design Masterplan // infrastructure Cars Car route ar r ute (new) Tram + Bus ra us (new) Trains Tram Metro
    16. Urban design Masterplan // park-over / network / building mass Highrise & Boulevards (highrise) (highrise) (highrise)
    17. Urban design Masterplan // infrastructure infrastructure asis e ra ar e n r car r ute rain stati n entrances us ra istri uti n er inal r ute ra ar e ar par aarle er e
    18. Urban design Masterplan // parking
    19. Urban design Masterplan // parks / boulevards / facilities not full detailed not full detailed not full detailed
    20. Urban design Masterplan // highrise
    21. Urban design Masterplan // impression
    22. Cluster study question urban analysis objectives URBAN objectives concept urban concept building design BUILDING masterplan circulation building construction installation facade layout system system proof system light & visibility by case study mixed program objectives BLOCK flexibility concept appearance cluster design proof system by case study
    23. Cluster Objectives METHOD : STUDY CLUSTER TO PROOF THE USABILIT Y OF THE MASTERPLAN OBJECTIVES: > light & visibility > flexibility to accommodate mixed program > dwellings > offices > retail > catering industry > other facilities
    24. Cluster Concept Light Highrise corridors on strip Strip with facilities Bus + Tram Train Car Park Terminal Platforms
    25. Cluster Concept Highrise on strip level +01 : highrise (offices, hotels, dwellings) Strip with p Light g (and up) facilities l Courtyard atrium r m level +00 : facilities (fun shopping); entrances level -01 : facilities (run shopping) level -02 : construction, installations, distribution level -03 : infrastructure (fast traffic)
    26. Cluster Platforms (-03) outline of towers above light corridor atrium
    27. Cluster Parking (-02) outline of towers above light corridor atrium
    28. Cluster Boulevard (-01) outline of towers above light corridor atrium
    29. Cluster Ground floor (+00) light corridor atrium
    30. Cluster Impressions
    31. Cluster Impressions
    32. Building study question urban analysis objectives URBAN objectives concept urban concept building design BUILDING masterplan circulation building construction installation facade layout system system proof system light & visibility by case study mixed program objectives BLOCK flexibility concept appearance cluster design proof system by case study
    33. Building Objectives METHOD : CREATE BUILDING DESIGN TO PROOF THE USABILIT Y OF THE CLUSTER DESIGN OBJECTIVES: > light & visibility > mixed program > flexibility (change usage over time) > appearance CONTSTRAINTS: > building above train tracks and platforms
    34. Building Concept // basis CONNECT & OPEN UP
    35. Building Concept // sight CONNECT & OPEN UP
    36. Building Concept // circulation CONNECT & OPEN UP
    37. Building Concept // orientation CONNECT & OPEN UP
    38. Building Concept // privacy CONNECT & OPEN UP
    39. Building Concept // construction CONNECT & OPEN UP
    40. Building Concept // installations CONNECT & OPEN UP
    41. Building Concept // facade CONNECT & O CO C OPEN UP U
    42. Building // circulation Concept
    43. Building // circulation Clustering studies Solo towers w/ mono core Tower pair w/ dual core + ring Tower cluster w/ quad core + ring
    44. Building // circulation Core studies Core embedded in void Core plugged into towers
    45. Building // circulation Organization
    46. Building // circulation Organization A B A (stairs) (elevators) (stairs)
    47. Building // circulation Section
    48. Building // circulation Entrance Entrance residents Entrance visitors boulevard side on park level
    49. Building // circulation Details
    50. Building // circulation Impression
    51. Building // circulation Impression
    52. Building // construction Concept
    53. Building // construction System Joints steel column tubular pro file 200 x 200 concrete core braces braces facade column - beam core column - beam hinge joint clamped joint Section AA1 steel facade column edge beam tubular profile 120 x 80 IPE 170 concrete core 5700 edge beam main beam steel column IPE 200 w/ one side IPE 200 w/ main beam tubular pro file 200 x 200 extended lower flange extended lower flange IPE 320 concrete core 1350 1350 braces 1350 5700 2700 2700 3600 3600 2700 2700 2000 2000 Plan upper floors Section BB1
    54. Building // construction Flow of forces
    55. Building // installations Concept > one core per tower > service zone in tower center (in suspended ceiling) > other services in floors > climate in combination w/ facade
    56. Building // installations System mechanical ventilation pre cooled / heated > HEATING per dwelling / office > DRAINAGE suspended ceiling natural ventilation direct or indirect > ELECTRICITY vertical through facade panels > VENT SYS in PLAN distribution Section AA3 5700 services above suspended ceiling 1350 1350 stairs & lifts vertical distribution 1350 suspended ceiling low temerature surface heating in top of floor system or 5700 in additional dry floor system (adjustable to floor usage) 2700 2700 3600 3600 2700 2700 2000 2000 Plan upper floors Section BB1
    57. Building // installations Heating and ventilation no indirect direct ventilation ventilation ventilation Natural ventilation Low surface heating > no ventilation (closed) > low surface heating in > indirect (pre heated) ventilation (4-10 deg) floor system (IDES) > direct ventilation ( > 10 deg) > if required placed in dry floor system on top (for extra insulation)
    58. Building // installations Heating and ventilation - AIR IN + via bridge on HEAT REGULATION VaV VaV courtyard side pre cool / heat using min / max water system (running + - depends on + - through vertical shaft) function via bridge on boulevard side HEAT EXCHANGE FANS AIR OUT in suspended ceiling DWELLING OFFICE in core area VaV Mechanical ventilation > in addition to natural ventilation > air in/out via bridge > heat regulation using water system (distribution via shafts in core) > variable air volume (VaV) system depends on function (dwellings / offices / ... )
    59. Building // facade Concept > contact vs privacy > day light vs sun shading > expression (of activity)
    60. Building // facade Pattern & lighting
    61. Building // facade System 900 x 900 x 4mm PC OUT IN min cover 20% max cover 95% black -> silver Polycarbonate (PC) OUT highly transparant lightweight (1200kg/m3) 30 - 30 - 30 - 30mm (not to scale) temperature resistance impact resistance thermoplastic (recyclable) IN
    62. Building // facade Detail // vertical
    63. Building // facade Detail // horizontal
    64. Building // facade Simulation Prototype Rendering
    65. Building // facade Impression
    66. Building // facade Impression
    67. Building // facade Impression lighting
    68. Building // layout Concept > accommodate different programs > changeable over time > orient towards park or boulevard > more private activities towards center
    69. Building // layout Dwellings (+05) DWELLING A+ DWELLING A DWELLING B DWELLING C DWELLING A+ DWELLING A DWELLING B
    70. Building // layout Dwellings (+06) DWELLING A+ DWELLING D DWELLING C DWELLING A+ DWELLING D
    71. Building // layout Dwelling example
    72. Building // layout Offices (+10) OFFICE UNITS OFFICE DESKSCAPE
    73. Building // layout Details
    74. Building // layout

    + Jasper MoelkerJasper Moelker, 1 month ago

    custom

    190 views, 0 favs, 0 embeds more stats

    Graduation project 'Hybrid Buildings' process prese more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 190
      • 190 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 0
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories