UCS Implementation Updates

796
views

Published on

Cisco Unified Communications System implementation updates.

Cisco Unified Communications System implementation updates.

Published in: Technology, Health & Medicine

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
796
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
25
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Phase 1 UpdatesCisco UCS Implementation
    Jerry Bishop
    Blog.thehigheredcio.com
  • 2. Phase 1 Status Summary
    Installed (racked) March 8, 2011
    Read Private Clouds Here We Come for summary of installation and plan
    Minor issues with firmware on UCS and NetApp and zoning
    Migrations completed
    ESX cluster migrated and ~130 VM’s
    MS Exchange & SharePoint clusters
    Infrastructure and domain services platforms
    SCCM etc…
  • 3. Phase 2 Scope
    Production SQL cluster
    Production SharePoint SQL cluster
    OCS & LiveMeeting
    Call Manager
    IPCC & Unity VM
    WebWasher
  • 4. Physical and power gains
    Footprint and power savings at collocation site
  • 5. Initial Rack Layout at Colo Site
    Colo Rental
    $600/mo each
    5 Racks
    94% Full
    (14-U open)
    Colo Power
    $0.25 per KWH
    18,000 KWH
    Colo Cost
    $7,500 per mo.
  • 6. UCS Phase 1 (<30 Days) Progress
    Colo Rental
    $600/mo each
    5 Racks
    66% Full
    (50-U open)
    Colo Power
    $0.25 per KWH
    13,600 KWH
    Colo Cost
    $1,100 mo savings
    $13K annual
  • 7. UCS Phase 2 (End of May) Rack Plan
    Colo Rental
    $600/mo each
    4 Racks
    73% Full
    (45-U open)
    Colo Power
    $0.25 per KWH
    TBD KWH
    Colo Costs
    ~$3,100 mo savings
    41%+ annual reduction
  • 8. Cable plant
  • 9. UCS Connectivity
  • 10. UCS Wire Map
  • 11. UCS Cabling
  • 12. Ucs console images
    CIO Eye Candy from UCS Manager
  • 13. UCS Logical Display
  • 14. Chassis Display
  • 15. Fabric Display
  • 16. Performance gains
    More CIO Eye Candy
  • 17. ESX Cluster CPU Utilization
  • 18. Processor & Memory Utilization
  • 19. Power Consumption
  • 20. Questions?