Your SlideShare is downloading. ×
  • Like
Final Project – Gis
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Final Project – Gis

  • 220 views
Published

1st GIS Project I have done.

1st GIS Project I have done.

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
220
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
7
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011
  • 2. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011The Issue: How can I graphically display statistically data of garbage and recyclable materials using GIS for evaluation of the Utilization of County Trash Sites? The Intent of Design: To provide a ‘snap shot’ view graphically showing usage rates that represent categories of trash or loads. Primary Map displays graphical data representing location and material in Tonnage, (Most complete Data Acquired) Secondary Map (Inset) – displays additional data but in loads Data received from customer did not correlate Loads to Tonnage
  • 3. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011
  • 4. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Data • GPS Points for 11 Trash Sites via Garmin GPS UnitCollection • From Georgia Clearing House • Georgia Census Tracts Data • Georgia RoadsCollection • Putnam County Boundary • Trash Statistics from Advanced Disposal via Mr. Jon Hipp Data • Permission granted from County Manager Mr. Paul Van HauteCollection
  • 5. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 • Verification of Definition and Projection for: Initial Map • County Boundary • Census Tracts Generation • Georgia Roads • Feature layers clipped to County Boundary
  • 6. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 • Points from GPS Imported inInitial Map • Two points corrupted • Required Digitizing Shape file • Updated AttributeGeneration: Table • Imported Raster Image to locate points
  • 7. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 • Theissen Analysis Polygons applied • Provides equal distance between sites • Suggest possible coverage areas of sitesSecondary Map • Roads Imported • Selected by location using ‘Buffer’ Generation: • .25 miles from each site • ‘Highways’, ‘Roads’, ‘State Routes’ • Saved as separate feature layer
  • 8. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011Data Incorporation: • Trash Statistics Provided by Advanced Disposal • Two Forms: • Tonnage: MSW / C & D / Tires / Recyclables • Loads: Brush / Metal / Tires / Recyclables • (No Data given on what tonnage comprises a ‘load’) • (Consequently Tonnage is displayed on Primary Map • loads displayed as Map Inset) • From Excel, Data Manipulated via pivot tables • Data joined to site points attribute table under ‘RefName’
  • 9. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Symbology:• Population Tracts • Progressively darker as population increases • Transparency increased• Roads • Thicker and darker • labeled• Buffer • .1 mile around sites • selected Charts • selected Pie Chart and components from within Attribute table • set background to hollow and no line • This enables the data selected to be displayed as the symbol as the site itself• Multi-Ring Buffer • Used instead of Buffer as Buffer lines overlap and draw inside adjacent rings • Use of Multi-Ring Buffer joins the ring so further tool of intersect not necessary • 3 mile ring added to suggest sphere of influence
  • 10. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Selected Data Feature: - This feature was used as the attribute table for all the sites was tied here
  • 11. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Symbology: - Under ‘Show:’ select Charts, and then which type of chart you desire. - Under ‘Field Selection’ select which fields you want compared, (This comes from the attribute table)
  • 12. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Symbology: - Symbol color can be edited here BUT field name cannot it is as it appears in the attribute table. - Set background to ‘hollow’ and ‘0 outline width’. Effectively this gets rid of all graphics except for the actual symbol used (in this case a pie chart).
  • 13. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 ArcMap compares the data from the attribute table and utilizes the data within the symbol itself. Data was double checked against charts created via Excel, the result was an accurate graphical representation of the data.
  • 14. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Without the associated charts showing numerical data the Map only shows which site collects more of what category of trash – Utilization! Which is the Goal for this Project.
  • 15. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 In this example (view the snippet of the attribute chart at the bottom) Flat Rock clearly collects more tonnage in Tires but comprises roughly 25% of all trash at that site. When compared to Twin Bridges which shows roughly 45% of its collected trash is Tires.
  • 16. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011Additional Data:Map Inset – Graphically displays data for Loads• Created new Layer• copied county boundary feature• copied and modified site to reflect Load DataStatistical Data Provided• Via Charts • For Total Tonnage by Site • For Total Loads by Site• Via Pie Charts • Specific Example of heaviest used site • Tonnage • Loads
  • 17. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 The Map Inset, significantly smaller shows the % of trash category per site in LOADS. In previous slides about Tires in tonnage for Twin Bridges which showed roughly 45% for total trash collected this inset shows that by far the most loads went to Brush Collection.
  • 18. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011However as presented in the Final Map, raw data is needed to make any sense. Above are two charts created via excel for the overall Tonnage and overall Loads per site.
  • 19. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011Finally; The heaviest utilized site waspicked to show how its data is brokendown. (See previous slide)It would be impractical to show all 11sites on one map; however, thestatistical data along with the mapand this presentation wereforwarded to the customer.Remember the goal was toshow OVERALL UTILIZATION.
  • 20. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011Analysis • Via Map • More affluent areas of the county (Northeast, East, and South) • Indicate more recycling • Indicate more loads of brush • Via Data from Excel • Next several slides indicate cyclic patterns for data time frame provided
  • 21. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011
  • 22. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 MSW in Tons Rabbit Skip160 Browns Chapel Glades140 Wards Chapel120 Scott100 Long Shoals 80 Twin Bridges 60 Flat Rock 40 Rockville 20 Rock Eagle Reid Drive 0 May-09 May-10 May-11 Apr-09 Aug-09 Apr-10 Aug-10 Apr-11 Aug-11 Feb-09 Jul-09 Sep-09 Nov-09 Feb-10 Jul-10 Sep-10 Nov-10 Feb-11 Jul-11 Dec-09 Dec-10 Jan-09 Mar-09 Jun-09 Oct-09 Jan-10 Mar-10 Jun-10 Oct-10 Jan-11 Mar-11 Jun-11
  • 23. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 C & D in Tons180160 Rabbit Skip Browns Chapel140 Glades120 Wards Chapel Scott100 Long Shoals80 Twin Bridges Flat Rock60 Rockville Rock Eagle40 Reid Drive20 0 May-… May-… May-… Aug-… Nov-… Aug-… Nov-… Aug-… Mar-… Mar-… Mar-… Apr-09 Apr-10 Apr-11 Feb-09 Jul-09 Sep-09 Feb-10 Jul-10 Sep-10 Feb-11 Jul-11 Jan-09 Jun-09 Dec-09 Jan-10 Jun-10 Dec-10 Jan-11 Jun-11 Oct-09 Oct-10
  • 24. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Tires in Tons4.5 4 Rabbit Skip Browns Chapel3.5 Glades Wards Chapel 3 Scott2.5 Long Shoals Twin Bridges 2 Flat Rock Rockville1.5 Rock Eagle Reid Drive 10.5 0 May-… May-… May-… Aug-… Nov-… Aug-… Nov-… Aug-… Mar-… Mar-… Mar-… Apr-09 Apr-10 Apr-11 Feb-09 Jun-09 Jul-09 Sep-09 Feb-10 Jun-10 Jul-10 Sep-10 Feb-11 Jun-11 Jul-11 Dec-09 Dec-10 Jan-09 Oct-09 Jan-10 Oct-10 Jan-11
  • 25. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Recycling in Tons25 Rabbit Skip20 Browns Chapel Glades Wards Chapel Scott15 Long Shoals Twin Bridges Flat Rock10 Rockville Rock Eagle Reid Drive 5 0 May-… May-… May-… Aug-… Aug-… Aug-… Nov-… Nov-… Mar-… Mar-… Mar-… Apr-09 Apr-10 Apr-11 Feb-09 Jul-09 Sep-09 Feb-10 Jul-10 Sep-10 Feb-11 Jul-11 Dec-09 Dec-10 Jan-09 Jun-09 Oct-09 Jan-10 Jun-10 Oct-10 Jan-11 Jun-11
  • 26. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Overall Recycling in Tons35.0%30.0% Rabbit Skip Browns Chapel25.0% Glades Wards Chapel20.0% Scott Long Shoals Twin Bridges15.0% Flat Rock Rockville10.0% Rock Eagle Reid Drive 5.0% 0.0% Apr-09 May-09 Apr-10 May-10 Apr-11 May-11 Feb-09 Jul-09 Aug-09 Sep-09 Nov-09 Feb-10 Jul-10 Aug-10 Sep-10 Nov-10 Feb-11 Jul-11 Aug-11 Dec-09 Dec-10 Jan-09 Mar-09 Jun-09 Jan-10 Mar-10 Jun-10 Jan-11 Mar-11 Jun-11 Oct-09 Oct-10
  • 27. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Brush in Loads5045 Rabbit Skip40 Browns Chapel35 Glades Wards Chapel30 Scott Long Shoals25 Twin Bridges20 Flat Rock Rockville15 Rock Eagle Reid Drive10 5 0 May-… May-… May-… Aug-… Nov-… Aug-… Nov-… Aug-… Mar-… Mar-… Mar-… Apr-09 Apr-10 Apr-11 Feb-09 Jul-09 Sep-09 Feb-10 Jul-10 Sep-10 Feb-11 Jul-11 Dec-09 Dec-10 Jan-09 Jun-09 Oct-09 Jan-10 Jun-10 Oct-10 Jan-11 Jun-11
  • 28. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Metal in Loads3.5 3 Rabbit Skip Browns Chapel2.5 Glades Wards Chapel Scott 2 Long Shoals Twin Bridges1.5 Flat Rock Rockville 1 Rock Eagle Reid Drive0.5 0 May-… May-… May-… Aug-… Nov-… Aug-… Nov-… Aug-… Mar-… Mar-… Mar-… Apr-09 Apr-10 Apr-11 Feb-09 Jun-09 Jul-09 Sep-09 Feb-10 Jun-10 Jul-10 Sep-10 Feb-11 Jun-11 Jul-11 Dec-09 Dec-10 Jan-09 Oct-09 Jan-10 Oct-10 Jan-11
  • 29. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Tires in Loads1.2 Rabbit Skip 1 Browns Chapel Glades0.8 Wards Chapel Scott Long Shoals0.6 Twin Bridges Flat Rock Rockville0.4 Rock Eagle Reid Drive0.2 0 May-… May-… May-… Aug-… Aug-… Aug-… Nov-… Nov-… Mar-… Mar-… Mar-… Apr-09 Apr-10 Apr-11 Feb-09 Jul-09 Sep-09 Feb-10 Jul-10 Sep-10 Feb-11 Jul-11 Dec-09 Dec-10 Jan-09 Jun-09 Oct-09 Jan-10 Jun-10 Oct-10 Jan-11 Jun-11
  • 30. FINAL PROJECT – GIS Putnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Recycling in Loads76 Rabbit Skip Browns Chapel5 Glades Wards Chapel Scott4 Long Shoals Twin Bridges3 Flat Rock Rockville2 Rock Eagle Reid Drive10 May-… May-… May-… Aug-… Aug-… Aug-… Nov-… Nov-… Mar-… Mar-… Mar-… Apr-09 Apr-10 Apr-11 Feb-09 Jul-09 Sep-09 Feb-10 Jul-10 Sep-10 Feb-11 Jul-11 Dec-09 Dec-10 Jan-09 Jun-09 Oct-09 Jan-10 Jun-10 Oct-10 Jan-11 Jun-11
  • 31. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011
  • 32. FINAL PROJECT – GISPutnam County Trash, Recycling & Loads Jan 2009 – Aug 2011 Questions? Comments? Rebuttals?