Formatos Psp 0

3,203 views
3,009 views

Published on

Published in: Business, Travel
1 Comment
0 Likes
Statistics
Notes
  • Great Presentation! Thanks for sharing ____________________________________
    Calling for the Real Santa | http://bit.ly/5Fkz67 | ’Creating a world that is truly fit for children does not imply simply the absence of war. It means having the confidence that our children would not die of measles or malaria. It means having access to clean water and proper sanitation. It means having primary schools nearby that educate children, free of charge. It means changing the world with children, ensuring their right to participate, and that their views are heard and considered. It means building a world fit for children, where every child can grow to adulthood in health, peace and dignity.’ -- Carol Bellamy
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

No Downloads
Views
Total views
3,203
On SlideShare
0
From Embeds
0
Number of Embeds
15
Actions
Shares
0
Downloads
73
Comments
1
Likes
0
Embeds 0
No embeds

No notes for slide

Formatos Psp 0

  1. 1. Software Gestionador de Materiales y Reactivos Químicos Integrantes:  Silvia Linda. Jardines Sabino  Pedro Esteban. Ledesma Pichardo  Daniel Huerta Hernández Materia CALIDAD EN EL DESARROLLO DE SOFTWARE San Juan del Río, Qro., Martes, 08 de Diciembre de 2009
  2. 2. BITÁCORA DE REGISTRO DE DEFECTOS TIEMPO DE TIEMPO DE FECHA NUMERO TIPO INYECCION ELIMINACION DESCRIPCIÓN REPARACION DEFECTO SE CREARON NORMAS LA PRIMER ENTREVISTA QUE SE HIZO CON EL 14/09/2009 1 PLANEACION PARA LLEVAR A CABO 18/09/2009 4 DIAS 4 DIAS CLIENTE RESULTO POCO EFECTIVA OR FALTA EL TRABAJO DE PLANEACION A LA HORA DE RALIZARLA SE NOS PROPORCIONO UNA BASE DE DATOS SE DISEÑO UNA BASE ANALISIS Y REALIZADA EN EXCEL QUE CONTENIA 18/09/2009 2 DE DATOS MAS 23/09/2009 5 DIAS 5 DIAS DISEÑO MUCHOS CAMPOS INECESARIOS ADEMAS DE COMPLETA QUE HACIAN FALTA OTROS FALTA DE TABLAS PARA REALIZAMIENTO DEL ANALISIS Y SE ADICIONARON DIAGRAMA ENTIDAD RELACIÓN ASÍ COMO EL 23/09/2009 3 06/10/2009 1 DÍA 13 DÍAS DISEÑO TABLAS ORDENAMIENTO Y ORGANIZACIÓN DE LA BASE DE DATOS. ANALISIS Y SE AGREGARON INEXISTENCIA DE CAMPOS CLAVE EN LA BASE 23/09/2009 4 06/10/2009 1 DÍA 12 DÍAS DISEÑO CAMPOS DE DATOS SE HIZO ANALISIS Y NO SE REALZÓ UN BUEN DISEÑO DE LA BASE 24/09/2009 5 NUEVAMENTE AL 15/10/2009 1 DÍA 8 DÍAS DISEÑO DE DATOS. ANALISIS AL EMIGRAR LAS TABLAS DE ACCESS A MY SQL MANDABAN ERRORES DE LLAVES 24/09/2009 6 CODIFICACIÓN SE MIGRARON TABLAS 26/10/2009 1 DÍA 2 DÍAS FORÁNEAS Y PRIMARIAS POR LO TANTO TUVIMOS QUE OMITIRLAS. EL LOGO Y ANTECEDENTES DE LA EMPRESA SE CAMBIO EL DISEÑO PARA QUIEN SE HIZO EL SISTMA SE ANALISIS Y DE LA 29/09/2009 7 02/10/2009 3 DIAS 3 DIAS CAMBIARON POR LO QUE EL DISEÑO DE LA DISEÑO DOCUMENTACION DCUMENTACION E INTERFACES TAMBIEN SE DEL SISTEMA MODIFICA SE IMPLEMENTARON NO SE HABIA CONTEMPLADO LA NECESIDAD TABLAS PARA 12/10/2009 8 ANALISIS 15/10/2009 2 DIAS 3 DIAS DEL CLIENTE PARA REGISTRAR CONSUMOS REGISTRO DE EN LA BASE DE DATOS. CONSUMOS Universidad Tecnológica de San Juan del Río
  3. 3. TIEMPO DE TIEMPO DE FECHA NUMERO TIPO INYECCION ELIMINACION DESCRIPCIÓN REPARACION DEFECTO SE HABÍAN DISEÑADO LAS INTERFACES ANTERIORMENTE PERO PROBLEMAS DE VIRUS EN EL EQUIPO DONDE SE HABITABA EL RECOMENZAMOS EL RESPALDO SE BORRARON, A PESAR DE TENER 21/10/2009 9 CODIFICACIÓN 03/11/2009 1 DÍA 13 DÍAS PROCESO DE DISEÑO OTRO RESPALDO EN DISCO ESTE MISMO SE EXTRAVIÓ Y NO HA SIDO ENCONTRADO POR TANTO SE REALIZARAN NUEVAMENTE EL DISEÑO. SE AGREGO METODO PARA LA AL MOMENTO DE DAR DE ALTA UN USUARIO 05/11/2009 10 CODIFICACIÓN 17/11/2009 1 DÍA 12 DÍAS ACTUALIZACION DE LA NO SE ACTUALIZA LA BASE DE DATOS. BD SE UTILIZO DE APOYO UN SOFTWARE MANEJADO ANTERIORMENTE POR EL SE DIEÑO UN NUEVO CLIENTE, PARA EXTRAER UNA SISTEMA PARA 05/11/2009 11 ANÁLISIS 17/11/2009 1 DÍA 12 DÍAS DOCUMENTACIÓN, “HOJAS DE SEGURIDAD ORGANIZAR LA DE LOS REACTIVOS” AL MOMENTO DE INFORMACION TRANSFERIR ESTA MISMA NO SE ENCONTRÓ INFORMACIÓN DE ALGUNOS MATERIALES. ERROR DE PLANIFICACIÓN DE INTERFACES SE REDISEÑARON LAS 05/11/2009 12 ANÁLISIS 17/11/2009 1 DÍA 12 DÍAS POR FALTA DE ANÁLISIS EN EL INTERFACES REQUERIMIENTO DEL CLIENTE. SE AGREGO UNA NECESITÁBAMOS CREAR UNA TABLA DE 07/11/2009 13 ANÁLISIS 17/11/2009 1 DÍA 10 DÍAS TABLA REQUISICIONES QUE PIDIÓ EL CLIENTE SE REQUERIA UN DRIVER QUE NOS SE HIZO LA CONEXIÓN PERMITIERA CONECTARNOS A LA BASE DE 10/11/2009 14 CODIFICACIÓN A LA BD MEDIANTE 13/11/2009 3 DIAS 6 DIAS DATOS YA QUE NO SE PODIA HACER LA UN ADAPTADOR CONEXIÓN COM MYSQL. Universidad Tecnológica de San Juan del Río
  4. 4. TIEMPO DE TIEMPO DE FECHA NUMERO TIPO INYECCION ELIMINACION DESCRIPCIÓN REPARACION DEFECTO SE VENIA TRABAJANDO CON EL MODELO DE DESARROLLO DE CASCADA PERO DEBIDO A SE CAMBIO EL LOS REQUIRIMIENTOS DE NUESTRO CLIENTE 10/11/2009 15 ANALISIS MODELO DE 12/11/2009 2 DIAS 28 DIAS NOS DIMOS CUENTA DE QUE NUESTRO DESARROLLO SOFTWARE AL TERMINO DE ESTE PROYECTO SOLO SERIA UN PROTOTIPO POR LO TANTO SE CAMBIO AL MODELO DE PROTOTIPOS NO SE LLEVABA UN PROGRESO EN EL DIVISION DE TAREAS Y PLANEACION Y DESARROLLO DEL PROYECTO DEBIDO A QUE 15/11/2009 16 RESPONSABILIDADES 20/11/2009 2 DIAS 20 DIAS ORGANIZACIÓN NADIE TENIA UNA TAREA ESPECIFICA QUE EN EL EQUIPO ESTUVIERA REALIZANDO CORRECTAMENTE. SE REHIZO LA 17/11/2009 17 CODIFICACIÓN 24/11/2009 2 DÍAS 7 DÍAS SE BORRO LA CODIFICACIÓN CODIFICACION SE REDISEÑO LA SE REQUERIA CLASIFICAR A LOS USUARIOS ANALISIS Y TABLA USUARIOS 19/11/2009 18 20/11/2009 1 DIA 3 DIAS PARA DAR O DENEGAR PRIVILEGIOS Y NO SE DISEÑO AGREGANDO EL HABIA CONTEMPLADO. CAMPO DE TIPO SE HABIA CONTEMPLADO EL USO DE UNA IMPLEMENTACION DE DISEÑO Y SOLA INTERFAZ PARA EL MENU DE 20/11/2009 19 UNA INTERFAZ EN EL 23/11/2009 1 DIA 5 DIAS CODIFICACION APLICACIONES Y SE REQUERIA OTRA PARA SISTEMA HACER UNA SEPARACION DE USUARIOS IMPLEMENTACION DE ANÁLISIS Y SE NECESITABA UNA INTERFAZ MAS PARA 23/11/2009 20 UNA INTERFAZ EN EL 26/11/2009 3 DIAS 12 DIAS DISEÑO REALIZAR UNA CONSULTA EN CONSUMOS SISTEMA IMPLEMENTACION DE ANÁLISIS Y SE NECESITO UNA INTERFAZ MAS PARA LA 23/11/2009 21 UNA INTERFAZ EN EL 26/11/2009 3 DIAS 12 DIAS DISEÑO ALTA DE ALUMNOS SISTEMA IMPLEMENTACION DE ANÁLISIS Y SE REQUIRIO UNA INTERFAZ PARA LA ALTA 23/11/2009 22 UNA INTERFAZ EN EL 26/11/2009 3 DIAS 12 DIAS DISEÑO DE USUARIOS DEL SISTEMA SISTEMA Universidad Tecnológica de San Juan del Río
  5. 5. TIEMPO DE TIEMPO DE FECHA NUMERO TIPO INYECCION ELIMINACION DESCRIPCIÓN REPARACION DEFECTO MODIFICACION AL EL TIPO DE DATOS DE LA TABLA CONSUMOS ANÁLISIS Y 24/11/2009 23 TIPO DE DATOS EN 25/11/2009 1 DÍA 4 DÍAS NO COINCIDÍA CON EL TIPO DE DATOS DISEÑO LAS TABLAS REQUERIDOS EN EL SISTEMA. SE MODIFICO LA LA INTERFAZ DE CONSULTA DE CONSUMOS ANÁLISIS Y INTERFAZ DE SE HABIA DISEÑADO CON VARIAS OPCIONES 25/11/2009 24 26/11/2009 1 DIA 3 DIAS DISEÑO CONSULTA DE DE BUSQUEDA CUANDO EL CLIENTE SOLO CONSUMOS QUERIA UN CRITERIO ESPECIFICO. SE AGREGO UNA SE NECESITABA ESPECIFICAR LA UNIDAD DE ANALISIS Y ETIQUETA PARA MEDIDA A LA HORA DE RALIZAR UN 25/11/2009 25 27/11/2009 1 DIA 4 DIAS DISEÑO ESPECIFICAR LA CONSUMO Y EN LA INTERFAZ PARA ESTA UNIDAD DE MEDIDA APLICACIÓN NO SE MOSTRABA DEBIDO A ERRORES QUE SE PRODUCIAN SE REALIZARON DURANTE LA CODIFICACION SE PERDIAN ANALISIS Y RESPALDOS 25/11/2009 26 26/11/2009 1 DIA 5 DIAS AVANCES QUE SE LLEVABAN EN EL PLANEACION CONSTANTES DE LA PROYECTO MAS AUN POR LA FALTA DE CODIFICACION Y BD RESPALDOS CONSTANTES EN EL EQUIPO EL TIPO DE DATO QUE SE MANEJABA EN EL SE CAMBIO EL TIPO DE CAMPO DE CLAVE DE LAS TABLAS NO NOS DISEÑO Y DATO DE UNO DE LOS 26/11/2009 27 27/11/2009 1 DIA 1 DIA PERMITIA GENERAR AUTOMATICAMENTE UN CODIFICACION CAMPOS DE LA TABLA NUMERO UNICO DE REQUISICION PARA CLAVES REQ FACILITAR EL SUS USO SE ELIMINARON AL OPERAR EN UN FORMULARIO MANDABA PROPIEDADES SOBRE 27/11/2009 28 CODIFICACION 27/11/2009 1 DIA 1 DIA UN ERROR SOBRE LAS RESTRICCIONES NOT VALORES NULOS EN NULL DE LA BASE DE DATOS. LAS TABLAS DEBIDO A LAS MODIFICACIONES EN LA BASE SE MODIFICO EL ANALISIS Y DE DATOS EL DIAGRAMA ENTIDAD RELACION 27/11/2009 29 DIAGRAMA ENTIDAD 28/11/2009 1 DIA 8 DIAS DISEÑO NO CORREPONDIA SEGÚN LOS CAMBIOS RELACION DE LA BD REALIZADOS SE ELIIMINARON EN LA CODIFICACION MARCABA ERROR AL MOMENTANEAMENTE 28/11/2009 30 CODIFICACION 28/11/2009 1 DIA 1 DIA SUPERAR LAS RESTRICCIONES DE LA BASE DE LLAVES FORANEAS EN DATOS REFERENTES A FOREIGN KEYS LA BASE DE DATOS Universidad Tecnológica de San Juan del Río
  6. 6. TIEMPO DE TIEMPO DE FECHA NUMERO TIPO INYECCION ELIMINACION DESCRIPCIÓN REPARACION DEFECTO SE UTILIZO UNA SE REQUERIA EL USO DE UNA VARIABLE QUE VARIABLE PUDIERA UTILIZARSE EN TODOS LOS 28/11/2009 31 CODIFICACION COMPARTIDA EN 28/11/2009 1 DIA 1 DIA FORMULARIOS PARA PODER VALIDAR EL TODOS LOS TIPO DE USUARIOS FORMULARIOS LOS TIPOS DE DATOS DE LA TABLA MODIFICACION A LA CONSUMOS NO CORRESPONDIAN A LOS 29/11/2009 32 CODIFICACION 29/11/2009 1 DIA 1 DIA BASE DE DATOS NECESARIOS PARA PROGRAMAR LA INTERFAZ DE ALTA DE CONSUMOS LA INSTALACION DE LA APLICACIÓN REQUERIA DE LA INSTALACION DE OTRA EN SE CREO UN LA QUE HABIA QUE ESPECIFICAR CIERTOS DISEÑO Y INSTRUCTIVO DE 30/11/2009 33 30/11/2009 1 DIA 1 DIA PARAMETROS POR LO QUE SIN LA CODIFICACION INSTALACION DEL EXISTENCIA DE UN MANUAL DE INSTALACION SISTEMA UN USUARIO COMUN NO HABRIA PODIDO INSTALARLO SE CAMBIO EL DISEÑO DE ALGUNAS DE LAS SE USARON COLORES QUE LASTIMABAN LA ANALISIS Y INTERFACES DEL VISTA DEL USUARIO DEL SISTEMA Y SE 01/12/2009 34 03/12/2009 1 DIA 2 DIAS DISEÑO USUARIO PARA NECESITABAN TONOS MAS AMABLES CON LA COMDIDAD DEL VISTA MISMO SE CAMBIO UNA NO ERA NECESARIO ESPECIFICAR AL USUARIO ANALISIS Y 01/12/2009 35 INTERFAZ DEL 03/12/2009 1 DIA 2 DIAS QUE TENIA LIMITACIONES EN EL USO DEL DISEÑO SISTEMA SISTEMA SE HIZO UNA NO SE LLEVO UN REGISTRO ADECUADO DE LA REUNION PARA DOCUMENTACION DE ERRORES POR LO QUE 07/12/2009 36 PLANEACION 08/12/2009 1 DIA 30 DIAS ANALIZAR LOS A LA HORA DE DOCUMENTARLOS COSTO ERRORES COMETIDOS MUCHO TRABAJO REALIZAR ESTE REGISTRO Universidad Tecnológica de San Juan del Río
  7. 7. BITÁCORA DE REGISTRO DE TIEMPOS TIEMPO DE TIEMPO FECHA INICIO DETENCIÓN FASE COMENTARIOS INTERRUPCIÓN DELTA ENTREVISTAMOS AL CLIENTE, QUEDO 110 14/09/2009 1:00 PM 3:00 PM 10 MINUTOS ANÁLISIS COMPRENDIDO LO QUE REQUIERE EL MINUTOS USUARIO. 100 ANALIZAMOS LOS REQUERIMIENTOS 17/09/2009 7:00 AM 9:00 AM 20 MINUTOS ANÁLISIS MINUTOS DEL CLIENTE. DESARROLLO DEL 105 BUSCAMOS EL DISEÑO DE LAS POSIBLES 21/09/2009 9:00 AM 11:00 AM 15 MINUTOS DISEÑO DEL MINUTOS INTERFACES PARA EL SISTEMA. SISTEMA NOS FUE ENTREGADA LA BASE DE 100 DISEÑO DEL 22/09/2009 1:00 PM 3:00 PM 20 MINUTOS DATOS EXISTENTE PARA EL SISTEMA, Y MINUTOS SISTEMA LA ORGANIZAMOS. DISEÑO DEL EMPEZAMOS A ESTRUCTURAR LA BASE 05/10/2009 9:00 AM 11:00 AM 30 MINUTOS 90 MINUTOS SISTEMA(BASE DE DE DATOS Y LA TRANSFERIMOS A DATOS) ACCESS YA QUE ESTABA EN EXCEL. DISEÑO DEL 110 DEFINIMOS LAS CLAVES PRIMARIAS DE 12/10/2009 9:00 AM 11:00 AM 10 MINUTOS SISTEMA(BASE DE MINUTOS LAS TABLAS Y FORÁNEAS. DATOS) DISEÑO DEL INICIO DEL DIAGRAMA ENTIDAD- 15/10/2009 7:00 AM 9:00 AM 25 MINUTOS 95 MINUTOS SISTEMA(BASE DE RELACIÓN. DATOS) DISEÑO DEL MODELADO DEL DIAGRAMA ENTIDAD- 20/10/2009 1:00 PM 3:00 PM 30 MINUTOS 90 MINUTOS SISTEMA(BASE DE RELACIÓN. DATOS) Universidad Tecnológica de San Juan del Río
  8. 8. TIEMPO DE TIEMPO FECHA INICIO DETENCIÓN FASE COMENTARIOS INTERRUPCIÓN DELTA DISEÑO DEL 10:00 FIN DEL DIAGRAMA ENTIDAD- 23/10/2009 11:00 AM 10 MINUTOS 50 MINUTOS SISTEMA(BASE DE AM RELACIÓN. DATOS) DISEÑO DEL TRANSFERENCIA DE LA BASE DE DATOS 26/10/2009 9:00 AM 11:00 AM 40 MINUTOS 80 MINUTOS SISTEMA(BASE DE A MY SQL. DATOS) 110 DISEÑO DEL ACORDAMOS LOS DISEÑOS DE LAS 02/11/2009 9:00 AM 11:00 AM 10 MINUTOS MINUTOS PROGRAMA PANTALLAS COMENZAMOS CON LOS PRIMEROS 05/11/2009 7:00 AM 9:00 AM 30 MINUTOS 90 MINUTOS CODIFICACIÓN MÉTODOS DE LA PROGRAMACIÓN. 100 CODIFICAMOS LAS PRIMERAS 09/11/2009 9:00 AM 11:00 AM 20 MINUTOS CODIFICACIÓN MINUTOS PANTALLAS. 100 CODIFICAMOS MÁS PANTALLAS PARA 10/11/2009 1:00 PM 3:00 PM 20 MINUTOS CODIFICACIÓN MINUTOS EL SISTEMA. 100 12/11/2009 7:00 AM 9:00 AM 20 MINUTOS CODIFICACIÓN CREAMOS LAS BASES DE DATOS. MINUTOS COMENZAMOS A CODIFICAR LAS 17/11/2009 9:00 AM 10:00 AM 5 MINUTOS 55 MINUTOS CODIFICACIÓN PANTALLAS. 185 CONTINUAMOS CON LA CODIFICACIÓN 19/11/2009 10:00 12:00 15MINUTOS CODIFICACIÓN MINUTOS DE PANTALLAS. 150 CREAMOS LA CONEXIÓN DE LA BASE DE 20/11/2009 1:00 4:00 30 MINUTOS CODIFICACIÓN MINUTOS DATOS. 150 23/11/2009 2:00 5:00 30 MINUTOS CODIFICACIÓN CODIFICAMOS MÁS PANTALLAS. MINUTOS Universidad Tecnológica de San Juan del Río
  9. 9. TIEMPO DE TIEMPO FECHA INICIO DETENCIÓN FASE COMENTARIOS INTERRUPCIÓN DELTA 160 SEGUIMOS CODIFICANDO PANTALLAS Y 24/11/2009 2:00 5:00 20 MINUTOS CODIFICACIÓN MINUTOS EMPEZAMOS DOCUMENTACIÓN. 165 25/11/2009 2:00 5:00 15 MINUTOS CODIFICACIÓN CONTINUAMOS CON LA CODIFICACIÓN. MINUTOS 140 SE PROGRAMARON LAS CONSULTAS DE 26/11/2009 2:00 5:00 40 MINUTOS CODIFICACIÓN MINUTOS MYSQL. 130 SE AJUSTARON LOS ÚLTIMOS DETALLES 27/11/2009 2:00 5:00 50 MINUTOS CODIFICACIÓN MINUTOS DE LA CODIFICACIÓN DE PANTALLAS. SE REVISARON A DETALLE LOS 10:00 28/11/2009 2:00 AM 2 HORAS 14 HORAS CODIFICACIÓN MATERIALES PARA ENTREGAR A LOS AM PROFESORES Y AL CLIENTE. SE TERMINÓ TODA LA CODIFICACIÓN Y 29/11/2009 9:00 AM 9:00 PM 2 HORAS 10 HORAS CODIFICACIÓN LA DOCUMENTACIÓN REQUERIDA. SE REVISARON LOS ÚLTIMOS DETALLES DEL SISTEMA, SE CREÓ EL SET UP, LOS 30/11/2009 2:00 PM 4:00 PM 30 MINUTOS 90 MINUTOS CODIFICACIÓN PSP Y TODA LA DOCUMENTACIÓN, DICHOS ELEMENTOS YA ESTABA CONCLUIDOS. Universidad Tecnológica de San Juan del Río
  10. 10. TIEMPO DE TIEMPO FECHA INICIO DETENCIÓN FASE COMENTARIOS INTERRUPCIÓN DELTA SE IMPRIMIÓ TODA LA DOCUMENTACIÓN, MANUALES, FORMATOS PSP ETC., SE QUEMÓ EL 30/11/2009 6:00 PM 5:00 AM 1 HORA 10 HORAS DOCUMENTACION SISTEMA EN LOS DISCOS, SE CREÓ LA PRESENTACIÓN PARA EXPONER EL PROYECTO. Universidad Tecnológica de San Juan del Río
  11. 11. RESUMEN DEL PLAN DE PROYECTO PLANEAMIENTO DE TIEMPOS POR FASE FASE ACTUAL TIEMPO EN MINUTOS A LA FECHA TIEMPO EN MINUTOS2 % VARIACIÓN PLANIFICACIÓN 23/09/2009 240 MINUTOS 02-OCT-09 210 MINUTOS 25% DISEÑO 21/10/2009 2880 MINUTOS 23-OCT-09 2800 MINUTOS 5% CODIFICACIÓN 02/11/2009 30240 MINUTOS 23-NOV-09 30200 MINUTOS 40% COMPILACIÓN 25/11/2009 4320 MINUTOS 28-NOV-09 4320 MINUTOS 20% PRUEBAS 28/11/2009 4320 MINUTOS 31/NOV/09 4320 MINUTOS 7% POSTMORTEM 14/12/2009 28800 MINUTOS N/A N/A N/A TOTAL 97% DEFECTOS INTRODUCIDOS ETAPAS ACTUAL DEFECTOS INTRODUCIDOS A LA FECHA DEFECTOS INTRODUCIDOS2 % VARIACIÓN PLANIFICACIÓN 23/09/2009 8 08/10/2009 9 20% DISEÑO 22/10/2009 5 23/10/2009 6 20% CODIFICACIÓN 02/11/2009 20 23/11/2009 22 40% COMPILACIÓN 25/11/2009 4 28/11/2009 4 10% PRUEBAS 28/11/2009 5 31/NOV/09 5 5% POSTMORTEM 14/12/2009 N/A N/A N/A TOTAL 95% Universidad Tecnológica de San Juan del Río
  12. 12. DEFECTOS ELIMINADOS ETAPA ACTUAL DEFECTOS ELIMINADOS A LA FECHA DEFECTOS ELIMINADOS2 % VARIACIÓN PLANIFICACIÓN 23/09/2009 4 08/10/2009 7 20% DISEÑO 22/10/2009 3 23/10/2009 6 20% CODIFICACIÓN 02/11/2009 15 23/11/2009 21 40% COMPILACIÓN 25/11/2009 4 28/11/2009 4 10% PRUEBAS 28/11/2009 5 31/NOV/09 5 5% POSTMORTEM 14/12/2009 N/A N/A N/A N/A TOTAL 95% Universidad Tecnológica de San Juan del Río

×