Your SlideShare is downloading. ×
Paer presentation for rooftop solar solution
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Paer presentation for rooftop solar solution

687

Published on

How …

How
is
this
Different
from
Wheeling
Solar
Power?
§ The
solar
plant
is
collocated
at
your
premises
and
therefore
it
is
in
your
control
§ There
is
no
government
policy
risk
associated
with
the
installa8on
throughout
the
life
of
the
installa8on
§ The
8me-­‐to-­‐installa8on
is
very
short
as
compared
to
wheeling
permissions,
etc.
§ Does
not
involved
any
wheeling
charges
or
cross-­‐subsidy
charges
and
therefore
100%
benefit
can
be
availed,
quickly
§ Poten8al
to
get
30%
MNRE
subsidy
as
it
is
up
to
100KWp
commercial
installa8on
which
further
increases
the
returns
§ Wheeling,
etc.
requires
a
minimum
of
1MWp
installa8on
which
increases
the
risk
associated
with
the
investment
due
to
various
external
factors

Published in: Self Improvement
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
687
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
16
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Cost  Effec*ve   Green  Power   for  Your   Business   Powered  by:   PAE  renewables  Pvt.  Ltd.  Confidential 1 28/08/12
  • 2. Poten*al  Benefits  to  You  We  propose  to  install  a  solar  grid-­‐*e  rooBop  system  on  your  office/premises  and  save  you  money.    Over  a  ten-­‐year  period,  the  total  savings  on  your  electricity  bill  are  `1.56  crores  for  installing  a  100KWp  grid-­‐*e  solar  power  plant   Annual  Billing  (in  `  Lacs)  on  your  rooBop.    This  figure  doe  not  take  in  to  account  the  capital  subsidy  and  the  deprecia*on  benefit.  It  is  purely  a  reduc*on  of  your  monthly  electricity  bill.    Assump*ons:  •  EB  base  rate  grows  at  5%  per   year  from  exis8ng  average  rate   of  `9/KWH   Confidential 2 28/08/12
  • 3. How  Does  this  Work?  PAER  will  install  a   The  solar  power   Therefore   You  keep  the  rooHop  grid-­‐8e   generated  during   consump8on  on   savings  which  solar  system  that   the  day  will  be   electricity  bill  will   range  from  `13  will  be  on  your   en8rely  used  by   reduce  accordingly   lacs  to  `18  lacs  side  of  the  meter   your  loads  and   and  bring  you   per  year  totaling   balance   recurring  savings  per   `1.56  crores  in   requirement  will   month   10  years   be  pulled  from  the   grid   Confidential 3 28/08/12
  • 4. How  is  this  Different  from     Wheeling  Solar  Power?  §  The  solar  plant  is  collocated  at  your  premises  and  therefore  it  is  in  your  control  §  There  is  no  government  policy  risk  associated  with  the  installa8on  throughout  the   life  of  the  installa8on  §  The  8me-­‐to-­‐installa8on  is  very  short  as  compared  to  wheeling  permissions,  etc.  §  Does  not  involved  any  wheeling  charges  or  cross-­‐subsidy  charges  and  therefore   100%  benefit  can  be  availed,  quickly  §  Poten8al  to  get  30%  MNRE  subsidy  as  it  is  up  to  100KWp  commercial  installa8on   which  further  increases  the  returns  §  Wheeling,  etc.  requires  a  minimum  of  1MWp  installa8on  which  increases  the  risk   associated  with  the  investment  due  to  various  external  factors  Confidential 4 28/08/12
  • 5. In  Summary  §  Gain  `1.56  crore  financial  benefit  over  10-­‐ year  period  §  Reduce  impact  of  electricity  price  increase   uncertain8es  on  your  business  §  Enhance  green  image  of  your  business  §  Gain  a  lower-­‐risk  solar  power  experience   with  a  small  step  Confidential 5 28/08/12
  • 6. Thank  You   PAE  renewables  Pvt.  Ltd.   info@paerenewables.com  Confidential 6 28/08/12

×