Understanding the Environmental Clearance Process
Environmental clearance from Ministry of Environment & Forests is required for following 30 categories of
project as per EIA notification-
Sector: Industry
1. Petroleum refineries including crude and products pipelines
2. Chemical fertilizers (nitrogenous and phosphatic other than single superphosphate)
3. Pesticides (Technical)
4. Petrochemical complexes (both olefinic and aromatic) and petro chemical intermediates such as DMT,
Caprolactam, LAB etc. and production of basic plastics such as LDPE, HDPE, PP, PVC
5. Bulk drugs and pharmaceuticals
6. Exploration of oil and gas and their production, transportation and their storage
7. Synthetic rubber
8. Asbestos and asbestos products
9. Hydrocyanic acid and its derivatives
10. a) Primary metallurgical industries (such as production of iron and steel, aluminum, copper, zinc, lead
and ferro alloys) b) Electric Arc Furnace (Mini Steel Plants)
11. Chloro alkali industry
12. Integrated paint complex including manufacture of resins and basic raw materials required in the
manufacture of paints
13. Viscose staple fiber and filament yarn
14. Storage batteries integrated with manufacture of oxides of lead and lead antimony alloys
15. Distilleries
16. Raw skins and hides
17. Pulp paper and news print
18. Dyes
19. Cement
20. Foundries (individual)
21. Electroplating
22. Meta Amino phenol
Sector: Mining
23. Mining projects (with lease more than 5 hectares)
 Sector: Thermal Power
24. Nuclear power and related projects such as heavy water plants, nuclear fuel complex, rare earths
25. Thermal power plants
Sector: River Valley and Hydroelectric
 26. River valley projects including hydel power, major irrigation and their combination including flood
control
Sector: Infrastructure and Miscellaneous Infrastructure
 27. Ports, Harbors, Airports (except minor ports and harbors)
28. Highway projects except projects relating to improvement work including widening and strengthening of
roads with marginal land acquisition along the existing alignments provided it does not pass through
ecologically sensitive areas such as National Parks, sanctuaries, tiger reserves reserve forests
29. Tarred road in the Himalayas and forest areas
30. Miscellaneous All tourism projects between 200m – 500m of High Water line and at location with an
elevation of more than 1000m with investment of more than Rs. 5 crores

The rational behind listing these projects is environmental damage intensity. However, depending upon
size/investment the applicability of our requirement may vary in certain cases.Similarly, certain areas are
more degraded and require specific regulation for permitting setting up of any kind of developmental
project. MoEF has brought out various notifications regulating setting up projects in these areas.
The expansion or modernization of the projects also increases the damage potential on environment. MoEF
has therefore regulated undertaking expansion and modernization projects also for above identified 30
categories of projects.
The certain category of projects reserved for Small Scale Industry where investment is less than 1 crore been
exempted from the preview of Environmental Clearance (EC).
Setting up projects in Coastal zone area has also been regulated for the protection of Coastal area
environment. Since public may be effected by a developmental project, provision of public consultation
(with few exceptions) has been made in the EC process.Ministry of Environment & Forests has grouped 30
categories of projects in five-sub group depending on the similarity of EC process work flow.These groups
are as under:
1. Industry
2. Mining
3. Thermal Power
4. River Valley and Hydro Electric
5. Infrastructure and Miscellaneous projects
The projects falling in coastal Zone regulated area out of the above requires clearance under CRZ
notification also.


                                              Life Cycle of a Project
Screening: This phase facilitates decision-making about applicability of EC process. It provides clear
guidance to decide whether the proposed project requires environmental clearance from MoEF or not. If not,
does it require clearance from State Department (like in thermal Power plant) or to approach State Pollution
Control Board for Consent to establish.
Siting and EIA Report Preparation: This phase facilitates identifying the siting guidelines applicable to
the project so as to select the right location for the proposed project. This phase also guides about the stage
when it can start detail rapid EIA study.
Public hearing: This phase facilitates screening the applicability of public hearing for the proposed project
and what steps to follow for completion of public hearing completion. It also provides the direction of
legislated time limit applicable to pubic hearing process and NOC from Pollution Control Board.
Other Approvals, recommendations, and certifications: This phase provides direction for approvals /
recommendation essential in case utilities like power, water, raw material, handling of hazardous chemicals,
hazardous waste, explosives etc has the repercussion on environment before the EC process. These
requirements would necessitate approvals from the concerned government departments. This phase also
provide direction about the CRZ approvals requirement and its applicability.
Clearance from IAA-MoEF: This phase facilitates the steps of EC process and time limits for completion
of EC process.
Post Environmental Clearance Monitoring: This phase defines the monitoring requirement once a project
has been accorded environmental clearance.
For mining investment clause is not applicable.
Information required at different stages of mining sector project

                                             Environmental clearance procedure for Mining: Phase I ( Screening)


                                                                                                   Project Type




                  New Project                                                                                                                      Expansion/modernization project



                  Major Minerals                               No

                                                                                                                      Increase in Mining Lease/ Annual         Increase in capital
                                                                                                                      Production or both
                                                        NO Clearance Required.
                          Yes                           Apply to SPCB for Consent to establish as applicable.


                                                                                                                      Proceed for EC Phase-II                    NO Clearance
                                                                                                                                                                 Required
                              Prospecting/Exploration                         Mining Lease




Site Clearance Required         Yes                                                                         Site Clearance Required
(MoEF) – Submit                              Area>500                             Area>5           Yes      (MoEF) – Submit
Application                                     Ha                                  Ha                      Application to MoEF for Site
 to MOEF for Site                                                                                           Clearance
Clearance
                                                                         No
                                            No

                                                                    No Clearance Required.
                                               Proceed for          Apply to SPCB for Consent to
     Site                                                                                                             Site
                                               EC , Phase II        establish as applicable.
     Clearance                                                                                                        Clearance
     Granted?                                                                                                         Granted?

                                                                                                                                           Yes
                                                                                                          No
     Yes                        No

Site Clearance is valid for        Take alternative site and
                                                                                     Take alternative site and                         Proceed for
5 years subject to certain         Take clearance from MoEF
                                                                                     Take clearance from MoEF                          EC , Phase II
Conditions, Proceed for            And Proceed for EC,
                                                                                     and Proceed for EC,
EC, Phase II                       Phase II
                                                                                     Phase II
Environmental Clearance: Phase II (Siting, EIA Report Preparation, Public hearing)




Step I                                              - If Diversion of Forest Land is Involved then Apply to State government for forest
Site specific base line                             Clearence.
data collection                                     Submit Copy of Forest Clearence to MoEF along with the EC Application.
                                                    - If area is ecologically sensitive area with Wildlife Habitat of Migration path within 7 km
                                                    then Obtain Comments /observations / recommendations of Cheif Wildlife Warden.
                                                    Submit Findings to MoEF along with the EC Application.
                                                    - If the mineral is of Radioactive nature then Apply for clearance from Atomic Energy
Step II                                             Division.
EIA , EMP report preparation and                     Submit Copy of NOC to MoEF along with EC Application
Other Approvals including                           - If water is to be used from irrigation sources or abstraction of ground water then
CRZ clearance as required                           Obtain clearance from Concerned agency (CGWA – if groundwater)
                                                    - If the Mine is already in operation then Prepare report on Health status of workers
                                                    Submit Copy of Report to MoEF along with EC Application
                                                    Prepare Mining Plan and Get Approval from IBM for Major Minerals.
                                                    Submit Copy of Approval (Mining plan, PSU-(Coal/Lignite) Project Approval Letter) to
                                                    MoEF along with EC Application
Step III                                            Obtain Approvals for Electricity, Water Supply and Explosives Storage (if applicable)
(Ascertain applicability of                         -Is Project falling under CRZ, if yes obtain CRZ clearance.
public hearing)



                                        1. Public Hearing required
                                   No   2. Submit requisite number of copies of
          Area <25 Ha                   Executive summary.
                                        3. Submit one copy of EIA, air and water
                                        consent application
                                        4. Form-1 and Form-13
                                        5. Advertise and conduct public hearing
                   Yes                  by SPCB .
                                        6. Obtain details of public hearing
                                        7. Obtain NOC from SPCB.
Public hearing not required             8. Proceed for Phase III
Obtain NOC from SPCB,                   (Clearance from IAA-MoEF
Proceed for Phase III                   And Post EC monitoring)
(Clearance from IAA-MoEF
And Post EC monitoring)
                                        Maximum 60 Days
Environmental Clearance: Phase III (Clearance from IAA-MoEF and Post EC monitoring)




                                                                Step I
    Submission of Documents * to MoEF through state department of mining or through concerned central department/
9   scheduled Ministry. (For Central Public Sector through concerned Administrative Ministry of GOI)
    if State Gov. has forwarded application at the time of Site Clearance, then no need to route again through State Govt. at
0   the time of EC
D   * Rapid EIA– 20 copies, EMP, filled in questionnaire, NOC, Public Hearing details, DPR, Application Form (Schedule - II)
    and Questionnaire.
A
Y
S                                                                       Yes             Assessment by expert committee
        Step II                            Adequate data?                               (Site visit, study report if required)
    Review by IAA


                                                                        No              Submit additional information to MoEF --> Review by IAA
3         Step III                                                                      (Step II)
    Recommendation to IAA                                                               (if inadequacy persists, project may lead to rejection )
0
D
A
                                                                           Yes          Environmental Clearance
Y       Step IV                           Project Accepted?                             (valid for 5 years for commencement of construction)
S

                                                                        No
                                                                                        Project rejected/Case closed
                                                                                        (reconsideration possible in certain cases)
        Step V




                                          Post Environmental Clearance Monitoring,
                                          Pre Commissioning, Post Commissioning
SCREENING


Major activity     Information to be                  Source of            Stake
                   collected(depending on the         information          holders
                   project location,size and type
                   there can be variation in the
                   information needed)
To check the       Capital Investment                 Project proponent    Project
requirement of     Technical Information of project   Project proponent    proponent
Environmental      Regulations Applicable and         MoEF / SPCB /
Clearance          requirement under them             State Department
                                                      of Environment
                                                      websites / Gazette
                                                      Notification



SITING


Major       Information to be         Source of        Stake            Remarks
activity    collected(depending       information      holders
            on the project
            location,size and type
            there can be variation
            in the information
            needed)
Obtain site Basic Project             Project               State       For Mining and
clearance   Information – includes    Proponent           Pollution     prospecting
/ consent   information about                          Control Board,   and
to          location, proposed                              State       exploration of
establish / investment, manpower,                      Department of    major
air and     raw materials,                             Environment,     minerals in
water       products,                                      Project      areas above
consent     manufacturing process,                       Proponent      500 Ha the
from State siting details, climate,                                     site clearance
Pollution   settlement                                                  is to be taken
Control     Regulations Applicable    MoEF / SPCB / Concerned           from the
Board       and requirement under     State          Government         Ministry of
            them                      Department of Authorities         Environment
                                      Environment                       and forest.
                                      websites /
                                      Gazette
                                      Notification
                                      (refer
                                      Appendix 1 for
                                      summary and
                                      linkages)
Emission inventory of        Project
            air pollution – includes   Proponent
            information about
            melting furnaces,
            boilers, process
            emissions, emission
            control equipment for
            air pollution
              Assessment of waste
                  water discharge –
               includes information
                like source of water
             supply, characteristics,
                   water treatment
                 details, disposal of
                    waste water
            Solid Waste –
            information about solid
            waste generation,
            quantity, method of
            disposal
            Other type of pollution
            – like noise, odour
            pollution, emergency
            management
            Other attachments –
            industrial license,
            explosive license,
            permission from local
            body, land schedule of
            the site, layout map of
            proposed project, list of
            pollution control
            equipment, process
            flow chart
            Hazardous Waste –
            information about solid
            waste generation,
            quantity, method of
            disposal
Additional Remarks: Some areas have been restricted for establishing of new
thermal projects. These areas include:

     -Doon Valley

    - Dahanu Taluka

     -Antop Hill, Bombay

     -Taj Trapezium
-Panchmari

       -Panchgani          Murud-Janjira in Raigadh district




EIA REPORT PREPARATION




                     Information to be
                    collected(depending on
                     the project location,size          Source of
Major activity                                                              Stakeholders           Remarks
                      and type there can be            information
                    variation in the information
                              needed)
 Preparation of     General Information              Project Proponent     Project Proponent      The EIA report
 Environmental      about the proposed                                                         should be based on
     Impact                 facility                                                              three monthly
  Assessment            Geographical               Survey of India maps,                       monitoring data or
   Report and           Information                 National Bureau of                         else as specified by
 submission to       (includes Latitude            Soil Survey and Land                               MoEF.
   Ministry of           longitude,                Use Planning, Nagpur
Environment and         geographical
 Forest for their      characteristics,
    appraisal       nature of soil, etc.)
                       Environmental               Census books, Project
                           settings                     Proponent
                      Current land usage
                       Proposed projects
                           area details
                        Area features in a
                       radius of 10 kms –
                      includes ecological,
                      man made features
                       Information about           Zoological Survey of
                     flora and fauna in 10           India, Botanical
                            km radius                survey of India,
                                                    Project Proponent
                       Information about           Indian Meteorology
                          seismic activity             Department
                    If mining is to be done        Chief Hydrographer
                    in CRZ confirmation of
                     mineral not available
                       outside CRZ, also a
                      layout plan showing
                         the mining area
                        Major Geological           Geological survey of
                     formation in the area                India
                           Mine Details             Project Proponent
                     Information about life
                      of mines and details
                         like lease period
                      Type and method of
                               mining
                        Details of loading,
                       transportation and
                     unloading of minerals
                      Details of machinery
                        to be used at the
                               mines
                        Surface drainage
                      pattern at the mine
                               Micro-               Indian Meteorology
                         Meteorological             Department, micro-
Information             meteorological survey
       Rain fall             to be carried out by
   Hourly relatively        the Project Proponent
       humidity
 Hourly Temperature
 Hourly average wind
 direction and speed
    Solar radiation
     Cloud cover
    Mixing height
  Air Environment            Ambient air quality
                              monitoring to be
                            conducted by project
                                 proponent
      24 hourly
  concentrations for
SPM, RPM, SO2, NOX,
      CO, Lead
Specific air pollution
issues in the project
        area
 Predicted impact of
  the project on air
    environment
Water Environment           Central / state ground
                              water authorities,
                            water sampling to be
                            carried out by project
                                  proponent
Water requirement for
   the project and its
       components
 Source of raw water
          supply
      Ground water
       Information
    Physico chemical
analysis of water to be
    used in project /
        township
      Waste water
   generation details
 from the project and
     its component
  Predicted impact on
  water quality of the
     receiving body
Waste Management            Waste analysis to be
                            carried out by project
                                  proponent
   Details of the solid
waste to be generated
Possibility of recovery
 / recycle of the waste
 Details of solid waste
        disposal
 Details of the land fill
in case the waste is to
 be disposed in a land
            fill
 Details of incinerator
in case the waste is to
      incinerated
 Noise Environment           Noise monitoring to
  Noise levels (Leq) at       be carried out by
   generating source          project proponent
   Ambient day-night
noise level (Leq)
   Fuel / Energy            Project Proponent
   Requirements
     Total power
    requirements
  Sources of Power
Details of the fuels to
       be used
Atmospheric impact          Project Proponent
       Flue gas
    characteristics
Stack emission details
 Predicted impact on
       air quality
   Pollution Load           Project Proponent
     statement (
    applicable to
    expansion /
   modernization
        plants)
 Comparison of land
 area, water, power,
   waste water, air
emissions, hazardous
chemical storage and
  solid waste details
Occupational health         Project Proponent
      and safety
Details of occupational
  hazards/risks and
 consequences levels
and control measures.
  Pollution control         Project Proponent
  Details of pollution
 control equipments
      Green belt            Project Proponent
 Details of plantation
Construction phase          Project Proponent
Details of construction
 phase in regards to
   people employed,
  their requirements
  and facilities to be
       provided
 Human settlement             Census, socio
                          economic survey to be
                            conducted by the
                            project proponent
 Socio economic data
 for the population in
     10 km radius
    Predicted socio
   economic impact
  Rehabilitation and
   resettlement plan
(wherever applicable)
     Environment
 Management Plan
      Emergency
 Preparedness and
    Response plan
PUBLIC HEARING

Major       Information to be                       Source of     Stakeholders
activity    collected/submitted(depending           information
            on the project location,size and type
            there can be variation in the
            information needed)
Conduct     Requisite number of copies of             Project     State Pollution
of public   Executive summary of the project in      Proponent    Control Board,
hearing     English and local language                            Project Proponent,
of the      EIA report (on request by concerned                   any person likely to
project     stake holder)                                         be affected by the
and grant   Advertisement in two newspaper                        grant of
of NOC      notifying about the public hearing                    environmental
from        (one should be of the local                           clearance, any
SPCB        language)                                             association of
            Filled in Form I prescribed under                     person not likely to
            Air(prevention and control of                         be affected, any
            pollution) Act 1983.                                  local authority in
            Filled in Form 13 prescribed under                    whose jurisdiction
            Water(prevention and control of                       the project is falling,
            pollution) Act                                        NGO’s


OTHER CERTIFICATIONS , RECOMMENDATIONS AND APPROVALS

Major activity      Information to be       Source of      Stake           Remarks
                    collected(depending information        holders
                    on the project
                    location,size and type
                    there can be variation
                    in the information
                    needed)
Grant of other      Approval of ground         Project     Project         The
licenses,           water board /            Proponent     proponent       concerned
approvals and       irrigation department                  and the         licenses are
recommendations     / municipality for                     respective      to be
from concerned      water supply                           departments     accrued by
departments         Approval of electricity                                the project
                    connection from                                        proponent
                    electricity supply                                     as per the
                    board                                                  specific
                    Approval of chief                                      information
                    controller of                                          need of the
                    explosives for storage                                 concerned
                    of hazardous                                           department
                    substances                                             or ministry
                    Forest Clearance from
                    state department of
Forest
                      Approval from atomic
                      Energy Division
                      Mining plan approval
                      from Indian Bureau of
                      Mines / Ministry of
                      Coal
                      Observations /
                      recommendations of
                      chief wildlife warden



CLEARANCES FROM IAA- MINISTRY IF ENVT. AND FOREST

Major            Information to be               Source of  Stakeholde      Remarks
activity         collected/submitted(depen       informatio rs
                 ding on the project             n
                 location,size and type there
                 can be variation in the
                 information needed)
Environment      20 copies of filled up           Project    Ministry of    In case of
al clearance     application form as per         Proponent   Environment    inadequac
from             Schedule II of EIA                          and Forest,    y found by
Ministry of      notificagtion dated 27th                    Expert         the Expert
Environment      January 1997.                               Committee,     committee
and Forest       20 copies of EIA /Risk                      Project        clarificatio
                 assessment report                           Proponent,     ns to the
                 Filled in Questionnaire along               Public / NGO   same are
                 with enclosure/other                                       to be
                 approvals.                                                 provided
                 1 copy of project report(RAP                               by project
                 report if required,NOC                                     proponent
                 & Public Hearing Report)



POST PROJECT MONITORING

Major             Information to be                  Source of            Stake
activity          collected/submitted(depending information               holders
                  on the project location,size and
                  type there can be variation in the
                  information needed)
Monitoring of      Six monthly compliance report to   Project Proponent       Project
the terms and        be submitted to the regional                           Proponent,
conditions for                  MOEF                                           State
environmental                                                                Pollution
safeguards as                                                                 Control
stipulated by                                                                 Board,
IAA                                                                          Regional
offices of
                                                   MoEF


Monitoring report/suggestions   Regional MOEF   Regional
and recommendations to the                      MOEF, MOEF
MOEF.

More Related Content

What's hot

Construction and Demolition Waste Management.pptx
Construction and Demolition Waste Management.pptxConstruction and Demolition Waste Management.pptx
Construction and Demolition Waste Management.pptxSoubhagya Tripathy
 
EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009Jenson Samraj
 
EIA report on thermal power project
EIA report on thermal power projectEIA report on thermal power project
EIA report on thermal power projectAhsan Nazir
 
Landfill design and operation
Landfill design and operationLandfill design and operation
Landfill design and operationarushe143
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)Angom Baleshwor
 
construction and demolition waste management
construction and demolition waste managementconstruction and demolition waste management
construction and demolition waste managementKonark Mehra
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5Bibhabasu Mohanty
 
Public Participation in Environmental Decision-Making
Public Participation in Environmental Decision-Making Public Participation in Environmental Decision-Making
Public Participation in Environmental Decision-Making Ashwani Kumar
 
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...Himanshu Goyal
 
Hazardous Wastes (Management, Handling and Transboundary Movement) Rules and...
Hazardous Wastes (Management, Handling and Transboundary Movement) Rules  and...Hazardous Wastes (Management, Handling and Transboundary Movement) Rules  and...
Hazardous Wastes (Management, Handling and Transboundary Movement) Rules and...Ranveer Singh Mahwar
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projectsSandeep Kumar
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentSonikaPawar
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020Chandrakant Singh
 

What's hot (20)

EIA
EIAEIA
EIA
 
Construction and Demolition Waste Management.pptx
Construction and Demolition Waste Management.pptxConstruction and Demolition Waste Management.pptx
Construction and Demolition Waste Management.pptx
 
EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009
 
EIA report on thermal power project
EIA report on thermal power projectEIA report on thermal power project
EIA report on thermal power project
 
Environmental Audit
Environmental AuditEnvironmental Audit
Environmental Audit
 
Eia
EiaEia
Eia
 
Landfill design and operation
Landfill design and operationLandfill design and operation
Landfill design and operation
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
 
construction and demolition waste management
construction and demolition waste managementconstruction and demolition waste management
construction and demolition waste management
 
Eia and its process
Eia and its processEia and its process
Eia and its process
 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
 
Public Participation in Environmental Decision-Making
Public Participation in Environmental Decision-Making Public Participation in Environmental Decision-Making
Public Participation in Environmental Decision-Making
 
EIA 2020
EIA 2020EIA 2020
EIA 2020
 
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...Factor considered for Environment Impact assessment (EIA) in legal procedure ...
Factor considered for Environment Impact assessment (EIA) in legal procedure ...
 
Hazardous Wastes (Management, Handling and Transboundary Movement) Rules and...
Hazardous Wastes (Management, Handling and Transboundary Movement) Rules  and...Hazardous Wastes (Management, Handling and Transboundary Movement) Rules  and...
Hazardous Wastes (Management, Handling and Transboundary Movement) Rules and...
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projects
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental impact assessment 2020
Environmental impact assessment 2020Environmental impact assessment 2020
Environmental impact assessment 2020
 
Eia 1994
Eia 1994Eia 1994
Eia 1994
 

Viewers also liked

Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...Ecotist
 
ENVIROMENTAL POLICY OF INDIA
ENVIROMENTAL POLICY OF INDIAENVIROMENTAL POLICY OF INDIA
ENVIROMENTAL POLICY OF INDIAAr Naveen Naveen
 
Environmental policy in india aabid
Environmental policy in india aabidEnvironmental policy in india aabid
Environmental policy in india aabidAabid Hussain Mir
 
Biodiversity Conservation and Climate Change Mitigation: Indian Efforts
Biodiversity Conservation and Climate Change Mitigation: Indian EffortsBiodiversity Conservation and Climate Change Mitigation: Indian Efforts
Biodiversity Conservation and Climate Change Mitigation: Indian EffortsClearIAS
 
Env policy ppt 2
Env policy ppt 2Env policy ppt 2
Env policy ppt 2arvindprem
 

Viewers also liked (7)

Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
Presentation on Implementation of Coastal Regulation Zone Notification dtd.19...
 
ENVIROMENTAL POLICY OF INDIA
ENVIROMENTAL POLICY OF INDIAENVIROMENTAL POLICY OF INDIA
ENVIROMENTAL POLICY OF INDIA
 
Coastal regulation zone
Coastal regulation   zoneCoastal regulation   zone
Coastal regulation zone
 
Environmental policy in india aabid
Environmental policy in india aabidEnvironmental policy in india aabid
Environmental policy in india aabid
 
Biodiversity Conservation and Climate Change Mitigation: Indian Efforts
Biodiversity Conservation and Climate Change Mitigation: Indian EffortsBiodiversity Conservation and Climate Change Mitigation: Indian Efforts
Biodiversity Conservation and Climate Change Mitigation: Indian Efforts
 
Env policy ppt 2
Env policy ppt 2Env policy ppt 2
Env policy ppt 2
 
Coastal regulation zone
Coastal regulation zoneCoastal regulation zone
Coastal regulation zone
 

Recently uploaded

Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 

Recently uploaded (20)

Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 

Environmental clearance

  • 1. Understanding the Environmental Clearance Process Environmental clearance from Ministry of Environment & Forests is required for following 30 categories of project as per EIA notification- Sector: Industry 1. Petroleum refineries including crude and products pipelines 2. Chemical fertilizers (nitrogenous and phosphatic other than single superphosphate) 3. Pesticides (Technical) 4. Petrochemical complexes (both olefinic and aromatic) and petro chemical intermediates such as DMT, Caprolactam, LAB etc. and production of basic plastics such as LDPE, HDPE, PP, PVC 5. Bulk drugs and pharmaceuticals 6. Exploration of oil and gas and their production, transportation and their storage 7. Synthetic rubber 8. Asbestos and asbestos products 9. Hydrocyanic acid and its derivatives 10. a) Primary metallurgical industries (such as production of iron and steel, aluminum, copper, zinc, lead and ferro alloys) b) Electric Arc Furnace (Mini Steel Plants) 11. Chloro alkali industry 12. Integrated paint complex including manufacture of resins and basic raw materials required in the manufacture of paints 13. Viscose staple fiber and filament yarn 14. Storage batteries integrated with manufacture of oxides of lead and lead antimony alloys 15. Distilleries 16. Raw skins and hides 17. Pulp paper and news print 18. Dyes 19. Cement 20. Foundries (individual) 21. Electroplating 22. Meta Amino phenol Sector: Mining 23. Mining projects (with lease more than 5 hectares) Sector: Thermal Power 24. Nuclear power and related projects such as heavy water plants, nuclear fuel complex, rare earths 25. Thermal power plants Sector: River Valley and Hydroelectric 26. River valley projects including hydel power, major irrigation and their combination including flood control Sector: Infrastructure and Miscellaneous Infrastructure 27. Ports, Harbors, Airports (except minor ports and harbors) 28. Highway projects except projects relating to improvement work including widening and strengthening of roads with marginal land acquisition along the existing alignments provided it does not pass through ecologically sensitive areas such as National Parks, sanctuaries, tiger reserves reserve forests 29. Tarred road in the Himalayas and forest areas 30. Miscellaneous All tourism projects between 200m – 500m of High Water line and at location with an elevation of more than 1000m with investment of more than Rs. 5 crores The rational behind listing these projects is environmental damage intensity. However, depending upon size/investment the applicability of our requirement may vary in certain cases.Similarly, certain areas are
  • 2. more degraded and require specific regulation for permitting setting up of any kind of developmental project. MoEF has brought out various notifications regulating setting up projects in these areas. The expansion or modernization of the projects also increases the damage potential on environment. MoEF has therefore regulated undertaking expansion and modernization projects also for above identified 30 categories of projects. The certain category of projects reserved for Small Scale Industry where investment is less than 1 crore been exempted from the preview of Environmental Clearance (EC). Setting up projects in Coastal zone area has also been regulated for the protection of Coastal area environment. Since public may be effected by a developmental project, provision of public consultation (with few exceptions) has been made in the EC process.Ministry of Environment & Forests has grouped 30 categories of projects in five-sub group depending on the similarity of EC process work flow.These groups are as under: 1. Industry 2. Mining 3. Thermal Power 4. River Valley and Hydro Electric 5. Infrastructure and Miscellaneous projects The projects falling in coastal Zone regulated area out of the above requires clearance under CRZ notification also. Life Cycle of a Project Screening: This phase facilitates decision-making about applicability of EC process. It provides clear guidance to decide whether the proposed project requires environmental clearance from MoEF or not. If not, does it require clearance from State Department (like in thermal Power plant) or to approach State Pollution Control Board for Consent to establish. Siting and EIA Report Preparation: This phase facilitates identifying the siting guidelines applicable to the project so as to select the right location for the proposed project. This phase also guides about the stage when it can start detail rapid EIA study. Public hearing: This phase facilitates screening the applicability of public hearing for the proposed project and what steps to follow for completion of public hearing completion. It also provides the direction of legislated time limit applicable to pubic hearing process and NOC from Pollution Control Board. Other Approvals, recommendations, and certifications: This phase provides direction for approvals / recommendation essential in case utilities like power, water, raw material, handling of hazardous chemicals, hazardous waste, explosives etc has the repercussion on environment before the EC process. These requirements would necessitate approvals from the concerned government departments. This phase also provide direction about the CRZ approvals requirement and its applicability. Clearance from IAA-MoEF: This phase facilitates the steps of EC process and time limits for completion of EC process. Post Environmental Clearance Monitoring: This phase defines the monitoring requirement once a project has been accorded environmental clearance. For mining investment clause is not applicable.
  • 3. Information required at different stages of mining sector project Environmental clearance procedure for Mining: Phase I ( Screening) Project Type New Project Expansion/modernization project Major Minerals No Increase in Mining Lease/ Annual Increase in capital Production or both NO Clearance Required. Yes Apply to SPCB for Consent to establish as applicable. Proceed for EC Phase-II NO Clearance Required Prospecting/Exploration Mining Lease Site Clearance Required Yes Site Clearance Required (MoEF) – Submit Area>500 Area>5 Yes (MoEF) – Submit Application Ha Ha Application to MoEF for Site to MOEF for Site Clearance Clearance No No No Clearance Required. Proceed for Apply to SPCB for Consent to Site Site EC , Phase II establish as applicable. Clearance Clearance Granted? Granted? Yes No Yes No Site Clearance is valid for Take alternative site and Take alternative site and Proceed for 5 years subject to certain Take clearance from MoEF Take clearance from MoEF EC , Phase II Conditions, Proceed for And Proceed for EC, and Proceed for EC, EC, Phase II Phase II Phase II
  • 4. Environmental Clearance: Phase II (Siting, EIA Report Preparation, Public hearing) Step I - If Diversion of Forest Land is Involved then Apply to State government for forest Site specific base line Clearence. data collection Submit Copy of Forest Clearence to MoEF along with the EC Application. - If area is ecologically sensitive area with Wildlife Habitat of Migration path within 7 km then Obtain Comments /observations / recommendations of Cheif Wildlife Warden. Submit Findings to MoEF along with the EC Application. - If the mineral is of Radioactive nature then Apply for clearance from Atomic Energy Step II Division. EIA , EMP report preparation and Submit Copy of NOC to MoEF along with EC Application Other Approvals including - If water is to be used from irrigation sources or abstraction of ground water then CRZ clearance as required Obtain clearance from Concerned agency (CGWA – if groundwater) - If the Mine is already in operation then Prepare report on Health status of workers Submit Copy of Report to MoEF along with EC Application Prepare Mining Plan and Get Approval from IBM for Major Minerals. Submit Copy of Approval (Mining plan, PSU-(Coal/Lignite) Project Approval Letter) to MoEF along with EC Application Step III Obtain Approvals for Electricity, Water Supply and Explosives Storage (if applicable) (Ascertain applicability of -Is Project falling under CRZ, if yes obtain CRZ clearance. public hearing) 1. Public Hearing required No 2. Submit requisite number of copies of Area <25 Ha Executive summary. 3. Submit one copy of EIA, air and water consent application 4. Form-1 and Form-13 5. Advertise and conduct public hearing Yes by SPCB . 6. Obtain details of public hearing 7. Obtain NOC from SPCB. Public hearing not required 8. Proceed for Phase III Obtain NOC from SPCB, (Clearance from IAA-MoEF Proceed for Phase III And Post EC monitoring) (Clearance from IAA-MoEF And Post EC monitoring) Maximum 60 Days
  • 5. Environmental Clearance: Phase III (Clearance from IAA-MoEF and Post EC monitoring) Step I Submission of Documents * to MoEF through state department of mining or through concerned central department/ 9 scheduled Ministry. (For Central Public Sector through concerned Administrative Ministry of GOI) if State Gov. has forwarded application at the time of Site Clearance, then no need to route again through State Govt. at 0 the time of EC D * Rapid EIA– 20 copies, EMP, filled in questionnaire, NOC, Public Hearing details, DPR, Application Form (Schedule - II) and Questionnaire. A Y S Yes Assessment by expert committee Step II Adequate data? (Site visit, study report if required) Review by IAA No Submit additional information to MoEF --> Review by IAA 3 Step III (Step II) Recommendation to IAA (if inadequacy persists, project may lead to rejection ) 0 D A Yes Environmental Clearance Y Step IV Project Accepted? (valid for 5 years for commencement of construction) S No Project rejected/Case closed (reconsideration possible in certain cases) Step V Post Environmental Clearance Monitoring, Pre Commissioning, Post Commissioning
  • 6. SCREENING Major activity Information to be Source of Stake collected(depending on the information holders project location,size and type there can be variation in the information needed) To check the Capital Investment Project proponent Project requirement of Technical Information of project Project proponent proponent Environmental Regulations Applicable and MoEF / SPCB / Clearance requirement under them State Department of Environment websites / Gazette Notification SITING Major Information to be Source of Stake Remarks activity collected(depending information holders on the project location,size and type there can be variation in the information needed) Obtain site Basic Project Project State For Mining and clearance Information – includes Proponent Pollution prospecting / consent information about Control Board, and to location, proposed State exploration of establish / investment, manpower, Department of major air and raw materials, Environment, minerals in water products, Project areas above consent manufacturing process, Proponent 500 Ha the from State siting details, climate, site clearance Pollution settlement is to be taken Control Regulations Applicable MoEF / SPCB / Concerned from the Board and requirement under State Government Ministry of them Department of Authorities Environment Environment and forest. websites / Gazette Notification (refer Appendix 1 for summary and linkages)
  • 7. Emission inventory of Project air pollution – includes Proponent information about melting furnaces, boilers, process emissions, emission control equipment for air pollution Assessment of waste water discharge – includes information like source of water supply, characteristics, water treatment details, disposal of waste water Solid Waste – information about solid waste generation, quantity, method of disposal Other type of pollution – like noise, odour pollution, emergency management Other attachments – industrial license, explosive license, permission from local body, land schedule of the site, layout map of proposed project, list of pollution control equipment, process flow chart Hazardous Waste – information about solid waste generation, quantity, method of disposal Additional Remarks: Some areas have been restricted for establishing of new thermal projects. These areas include: -Doon Valley - Dahanu Taluka -Antop Hill, Bombay -Taj Trapezium
  • 8. -Panchmari -Panchgani Murud-Janjira in Raigadh district EIA REPORT PREPARATION Information to be collected(depending on the project location,size Source of Major activity Stakeholders Remarks and type there can be information variation in the information needed) Preparation of General Information Project Proponent Project Proponent The EIA report Environmental about the proposed should be based on Impact facility three monthly Assessment Geographical Survey of India maps, monitoring data or Report and Information National Bureau of else as specified by submission to (includes Latitude Soil Survey and Land MoEF. Ministry of longitude, Use Planning, Nagpur Environment and geographical Forest for their characteristics, appraisal nature of soil, etc.) Environmental Census books, Project settings Proponent Current land usage Proposed projects area details Area features in a radius of 10 kms – includes ecological, man made features Information about Zoological Survey of flora and fauna in 10 India, Botanical km radius survey of India, Project Proponent Information about Indian Meteorology seismic activity Department If mining is to be done Chief Hydrographer in CRZ confirmation of mineral not available outside CRZ, also a layout plan showing the mining area Major Geological Geological survey of formation in the area India Mine Details Project Proponent Information about life of mines and details like lease period Type and method of mining Details of loading, transportation and unloading of minerals Details of machinery to be used at the mines Surface drainage pattern at the mine Micro- Indian Meteorology Meteorological Department, micro-
  • 9. Information meteorological survey Rain fall to be carried out by Hourly relatively the Project Proponent humidity Hourly Temperature Hourly average wind direction and speed Solar radiation Cloud cover Mixing height Air Environment Ambient air quality monitoring to be conducted by project proponent 24 hourly concentrations for SPM, RPM, SO2, NOX, CO, Lead Specific air pollution issues in the project area Predicted impact of the project on air environment Water Environment Central / state ground water authorities, water sampling to be carried out by project proponent Water requirement for the project and its components Source of raw water supply Ground water Information Physico chemical analysis of water to be used in project / township Waste water generation details from the project and its component Predicted impact on water quality of the receiving body Waste Management Waste analysis to be carried out by project proponent Details of the solid waste to be generated Possibility of recovery / recycle of the waste Details of solid waste disposal Details of the land fill in case the waste is to be disposed in a land fill Details of incinerator in case the waste is to incinerated Noise Environment Noise monitoring to Noise levels (Leq) at be carried out by generating source project proponent Ambient day-night
  • 10. noise level (Leq) Fuel / Energy Project Proponent Requirements Total power requirements Sources of Power Details of the fuels to be used Atmospheric impact Project Proponent Flue gas characteristics Stack emission details Predicted impact on air quality Pollution Load Project Proponent statement ( applicable to expansion / modernization plants) Comparison of land area, water, power, waste water, air emissions, hazardous chemical storage and solid waste details Occupational health Project Proponent and safety Details of occupational hazards/risks and consequences levels and control measures. Pollution control Project Proponent Details of pollution control equipments Green belt Project Proponent Details of plantation Construction phase Project Proponent Details of construction phase in regards to people employed, their requirements and facilities to be provided Human settlement Census, socio economic survey to be conducted by the project proponent Socio economic data for the population in 10 km radius Predicted socio economic impact Rehabilitation and resettlement plan (wherever applicable) Environment Management Plan Emergency Preparedness and Response plan
  • 11. PUBLIC HEARING Major Information to be Source of Stakeholders activity collected/submitted(depending information on the project location,size and type there can be variation in the information needed) Conduct Requisite number of copies of Project State Pollution of public Executive summary of the project in Proponent Control Board, hearing English and local language Project Proponent, of the EIA report (on request by concerned any person likely to project stake holder) be affected by the and grant Advertisement in two newspaper grant of of NOC notifying about the public hearing environmental from (one should be of the local clearance, any SPCB language) association of Filled in Form I prescribed under person not likely to Air(prevention and control of be affected, any pollution) Act 1983. local authority in Filled in Form 13 prescribed under whose jurisdiction Water(prevention and control of the project is falling, pollution) Act NGO’s OTHER CERTIFICATIONS , RECOMMENDATIONS AND APPROVALS Major activity Information to be Source of Stake Remarks collected(depending information holders on the project location,size and type there can be variation in the information needed) Grant of other Approval of ground Project Project The licenses, water board / Proponent proponent concerned approvals and irrigation department and the licenses are recommendations / municipality for respective to be from concerned water supply departments accrued by departments Approval of electricity the project connection from proponent electricity supply as per the board specific Approval of chief information controller of need of the explosives for storage concerned of hazardous department substances or ministry Forest Clearance from state department of
  • 12. Forest Approval from atomic Energy Division Mining plan approval from Indian Bureau of Mines / Ministry of Coal Observations / recommendations of chief wildlife warden CLEARANCES FROM IAA- MINISTRY IF ENVT. AND FOREST Major Information to be Source of Stakeholde Remarks activity collected/submitted(depen informatio rs ding on the project n location,size and type there can be variation in the information needed) Environment 20 copies of filled up Project Ministry of In case of al clearance application form as per Proponent Environment inadequac from Schedule II of EIA and Forest, y found by Ministry of notificagtion dated 27th Expert the Expert Environment January 1997. Committee, committee and Forest 20 copies of EIA /Risk Project clarificatio assessment report Proponent, ns to the Filled in Questionnaire along Public / NGO same are with enclosure/other to be approvals. provided 1 copy of project report(RAP by project report if required,NOC proponent & Public Hearing Report) POST PROJECT MONITORING Major Information to be Source of Stake activity collected/submitted(depending information holders on the project location,size and type there can be variation in the information needed) Monitoring of Six monthly compliance report to Project Proponent Project the terms and be submitted to the regional Proponent, conditions for MOEF State environmental Pollution safeguards as Control stipulated by Board, IAA Regional
  • 13. offices of MoEF Monitoring report/suggestions Regional MOEF Regional and recommendations to the MOEF, MOEF MOEF.