• Save
Starchartppt
Upcoming SlideShare
Loading in...5
×
 

Starchartppt

on

  • 198 views

 

Statistics

Views

Total Views
198
Views on SlideShare
193
Embed Views
5

Actions

Likes
0
Downloads
0
Comments
0

2 Embeds 5

http://jacqueline12.blogspot.com 4
http://www.blogger.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Starchartppt Starchartppt Presentation Transcript

  • Texas Star Chart
    • Knox Junior High
    • Jacqueline Sterle
  • Star Chart Agenda:
    • What is Star Chart
    • Important Areas of Star CHart
    • Types of Star Chart Ratings
    • Knox Junior High’s ratings
    • Comparison to state summary
    • Conclusion
  • What is the Star Chart?
    • An Analysis chart based on the four key areas of the Texas Long Range Plan.
    • Shows efforts to improve student learning by the use of technology locally and statewide.
    • Online Resource Tool
    • Teaching and Learning
    • Educator Preparation
    • Administration and Support
    • Infrastructure
    Areas of the Star Chart:
  • Comparison Chart 2007-2010: Campus Information: http://starchart2.esc12.net / Years: Area I: Teaching and Learning Area II: Educator Preparation and Development Area III: Administration and Support Area IV: Infrastructure 2007-2008 Total: 15 Advanced Tech Total: 14 Developing Tech Total: 18 Advanced Tech Total: 15 Advanced Tech 2008-2009 Total: 14 Developing Tech Total: 13 Developing Tech Total: 18 Advanced Tech Total: 15 Advanced Tech 2009-2010 Total: 13 Developing Tech Total: 12 Developing Tech Total: 13 Developing Tech Total: 13 Developing Tech
  • Conclusion:
    • A noticeable trend from the past couple years shows we have stayed at the Developing Tech level for Area III.
    • We have stepped back a level in the rest of the areas.
    • We must make a goal of reaching the Target Tech level for the upcoming school year.
  • Questions?