Summery of project outcome

584 views
505 views

Published on

Presented in the ASEAN Cooperation on Utilization of Space Technology for Disaster Management Seminar, 11th Aug 2010 at Miracle Grand Convention Hotel, Thailand. Hosted by GISTDA

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
584
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Summery of project outcome

  1. 1. ASEAN Cooperation Project on Utilization of Space Technology for p gy Disaster Management - Summary of Project Outcome Chandima Subasinghe Ch di S b i h GeoInformatics Center Asian Institute of Technology, Thailand gy
  2. 2. Summary of Project Outcome • 1-Day Seminar to increase awareness among decision & policy makers, senior & junior about the use of space makers technologies for various disaster related activities • 5-Days Technical Training • Development of easy-reading materials introducing GIS/GPS/RS (translate them into local languages) • Two Regional Workshops in Thailand & Indonesia to g p share the gained knowledge and networking in the region
  3. 3. 1-Day Seminar Sessions Presentation by External Experts P t ti b E t lE t 1030 – 1100 Realizing a National Disaster Risk Reduction Program Current Trends of Disasters in the Asia-Pacific Region and Applications of g pp 1100 – 1130 Geoinformatics in Disaster Management 1130 – 1200 Future direction of Geoinformatics/ICT for Disaster Risk Reduction 1200 – 1330 Lunch Presentations by Local Agencies / Presentation of Case studies 1330 - 1350 Use of Space Technologies for Disaster Risk Reduction in Thailand p g 1350 – 1420 Forest Fire Detecting and Monitoring by MODIS/NOAA 1420 – 1450 Flooding: C Fl di A Case Study i C b di St d in Cambodia Tea/Coffee Break Natural Disasters, Present Policies and Procedures for Disaster Risk 1450 – 1530 Reduction i Th il d R d ti in Thailand 1530 – 1600 Landslide: A Case Study in Nan Province, Thailand 1600 – 1630 Drought: A Case study in Cambodia 1630 Closing Remarks
  4. 4. 5-Days Technical Training Monday Tuesday Wednesday Thursday Friday Landslides & Project Flooding Danger Case Study Case Study NK Landslide Introduction & Hazard Implementation Implementation Model Disaster Risk Mgt Flooding Danger Framework & Role F k R l Characterization Ch t i ti Case St d C Study Case St d C Study Case St d C Study of Satellite Remote (Flood Modeling Implementation Implementation Implementation Sensing & NK Models) Flood Risk NK-GIAS Software Management Case Study Case Study Case Study Introduction & (Practices Implementation Implementation Implementation Installation including i l di NK Activities) Case Study Watershed Case Study Case Study Discussion and Implementation Characteristics Introduction Implementation Windup
  5. 5. Translated Reading Materials on GIS/RS/GPS Video Demonstration
  6. 6. Case Studies WREA, Laos Remote Sensing Center,  GISTDA,  MONRE, Vietnam Thailand PHIVOLCS, Philippines Ministry of  National Geography  Science Department, Cambodia & Technology,  Myanmar Survey  Department, Brunei  Darussalam LAPAN, Indonesia 
  7. 7. Thank You
  8. 8. Project Goal j The goal of the project is to build the individual and institutional capacity Technical knowledge of using satellite images in utilizing in producing products & information and demonstrate the potential of space based technologies (remote sensing/GPS/GIS) for management and reduction of risks due to natural disasters using case study/studies t d / t di
  9. 9. Modules to Achieve the Goal Module 1: Needs Survey visiting each country Module 2: Development of easy-reading material introducing GIS/GPS/RS and Application to DRR Module 3: 1-Day Seminar to increase awareness y Module 4: 5 Days Hands-on Training Module 5: 2 Regional Conferences in Thailand and Indonesia
  10. 10. Modules to Achieve the Goal Module 3 1-day seminar to raise awareness among decision & y g policy makers, senior & junior about the use of space based technology for various disaster related activities activities. Target about 70-80 participants Module 4 Carryout at least 5 day technical training locally based on at y y g y least one case study. 30-40 participants given facilities. Module 5 Conduct 2 Regional Workshops in Thailand & Indonesia to share the gained knowledge and networking in the region.

×