STP 5000 cum /d capacity  STUDY at Tihar Jail Complex <br />M/s Enviro Engineers New Delhi<br />
Main Plant Pictures <br />
Stilling Chamber Cum Screening Chamber <br />
Scour Pipe of Screen cum stilling chamber<br />
Gritt Chamber 2 no one is statndbye<br />
UASB REACTOR <br />
UASB Reactor after Gritt Chamber Top View <br />
Air Compressors Unit for FAB Reactor<br />
View of Manfacturer Label on Compressor Motor<br />
Top View of FAB- I Reactor <br />
CHLORINE CONTACT TANK<br />
SS SCREEN OUT LET AT FAB I<br />
CLOSE UP VIEW OF FAB MEDIA<br />
FAB MEDIA IN MOTION<br />
TOP VIEW OF FAB -II<br />SS SCREEN AT THE OUT LET<br />
SEWAGE INLET TO FAB -I<br />AIR DIFFISURE <br />RETURN SLUDGE I N FAB -I<br />
Clarifier RCC Top View<br />
SLUDGE TANK<br />
SLUDGE COLLECTION SUMP<br />
CHOLORINE TANK<br />
FILTER MEDIA CONTAINERS<br />
TREATED SEWAGE AFTER CLARIFIER<br />
CHOLORINE DOSING TANK<br />
CHOLORINE DOSING TANK FILLED WITH WATER   NO CHOLORINE SOLUTION<br />
HDPE PIPE USED FOR INTER TANK CONNECTION <br />
MCC ROOM<br />
ELECTRIC CONTROL UNIT<br />
SLUDGE RECIRCULATION PUMPS<br />
SEWAGE SAMPLE BEFORE AND AFTER TREATMENT <br />
INSPECTING TEAM <br />
Upcoming SlideShare
Loading in...5
×

Stp 5000 cum enviro tech new delhi

479

Published on

Power point presentation of 3 no STP installed by bidders of Mukatsar STP - Report on study tour-STP at Tihar Jail New Delhi

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
479
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
9
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Stp 5000 cum enviro tech new delhi"

  1. 1. STP 5000 cum /d capacity STUDY at Tihar Jail Complex <br />M/s Enviro Engineers New Delhi<br />
  2. 2. Main Plant Pictures <br />
  3. 3. Stilling Chamber Cum Screening Chamber <br />
  4. 4. Scour Pipe of Screen cum stilling chamber<br />
  5. 5. Gritt Chamber 2 no one is statndbye<br />
  6. 6. UASB REACTOR <br />
  7. 7. UASB Reactor after Gritt Chamber Top View <br />
  8. 8. Air Compressors Unit for FAB Reactor<br />
  9. 9. View of Manfacturer Label on Compressor Motor<br />
  10. 10. Top View of FAB- I Reactor <br />
  11. 11. CHLORINE CONTACT TANK<br />
  12. 12. SS SCREEN OUT LET AT FAB I<br />
  13. 13. CLOSE UP VIEW OF FAB MEDIA<br />
  14. 14. FAB MEDIA IN MOTION<br />
  15. 15. TOP VIEW OF FAB -II<br />SS SCREEN AT THE OUT LET<br />
  16. 16. SEWAGE INLET TO FAB -I<br />AIR DIFFISURE <br />RETURN SLUDGE I N FAB -I<br />
  17. 17. Clarifier RCC Top View<br />
  18. 18. SLUDGE TANK<br />
  19. 19. SLUDGE COLLECTION SUMP<br />
  20. 20. CHOLORINE TANK<br />
  21. 21. FILTER MEDIA CONTAINERS<br />
  22. 22. TREATED SEWAGE AFTER CLARIFIER<br />
  23. 23. CHOLORINE DOSING TANK<br />
  24. 24. CHOLORINE DOSING TANK FILLED WITH WATER NO CHOLORINE SOLUTION<br />
  25. 25. HDPE PIPE USED FOR INTER TANK CONNECTION <br />
  26. 26. MCC ROOM<br />
  27. 27. ELECTRIC CONTROL UNIT<br />
  28. 28. SLUDGE RECIRCULATION PUMPS<br />
  29. 29. SEWAGE SAMPLE BEFORE AND AFTER TREATMENT <br />
  30. 30. INSPECTING TEAM <br />