Process Map(MEP)

  1. 1. MEP ENGINEERING MECHANICAL ELECTRICAL PLUMBING
  2. 2. ELECTICAL <ul><li>1-SERVICES LINE </li></ul><ul><li>2-ARCHITECTURAL DRAWINGS </li></ul><ul><li>3-PROJECT TYPES </li></ul><ul><li>4-DESIGN STAGES </li></ul>
  3. 3. SERVICES PROVIDED 1-HV/LV DISTRIBUTION 2 SMALL POWER 3-LIGHTING 4-FIRE DETECTION & ALARMS 5-SECURITY SYSTEMS 6-EARTHING & LIGHNING PROTECTION 7- TELECOMMUNICATION 8-BUILDING MANAGEMENT SYSTEM
  4. 4. ARCHITECTURAL DRAWINGS <ul><li>OBTAINED DRAWINGS FROM THE ARCH. </li></ul><ul><li>SAVE DRAWINGS IN THEIR RESPECTIVE FOLDERS. </li></ul><ul><li>INFORM THE CONCERN ENG </li></ul>
  5. 5. PROJECT TYPES <ul><li>RESIDENTIAL BUILDING </li></ul><ul><li>COMMERCIAL COMPLEX </li></ul><ul><li>RETAIL </li></ul><ul><li>THEATRE </li></ul><ul><li>OFFICE TOWERS </li></ul><ul><li>HOTEL </li></ul><ul><li>HOSPITAL </li></ul>
  6. 6. DESIGN STAGES <ul><li>CONCEPT </li></ul><ul><li>SCHEME </li></ul><ul><li>DETAIL </li></ul><ul><li>TENDER </li></ul><ul><li>CONSTRUCTION </li></ul>
  7. 7. CONCEPT <ul><li>PREPARING CONCEPT REPORT </li></ul><ul><li>PRELIMINARY LOAD CALCULATIONS </li></ul><ul><li>MEP PLANT AREA CALCULATION </li></ul><ul><li>HIGHLIGHT AREAS WHERE IMPROVRMRNT CAN BE MADE </li></ul><ul><li>DEFINE ENGG. STRATEGY & PARAMETERS IN RELATION TO BUILDING STRUCTURE. </li></ul><ul><li>FEE PROPOSAL </li></ul>
  8. 8. SCHEME <ul><li>PREPARING SCHEME REPORT </li></ul><ul><li>SCHEMATIC DIAGRAM OF ALL ELECTRICAL SERVICES. </li></ul><ul><li>PREPARING DRAWING ISSUE SHEETS </li></ul><ul><li>LOCATION OF ELECTRICAL LOAD POINTS. </li></ul><ul><li>GENERATOR SIZING </li></ul><ul><li>SUBSTATION AREA CALCULATIONS </li></ul><ul><li>LOCATION OF ELECTRICAL SERVICES PTS(FIRE, TELECOM, UPS, SECURITY SYSTEM, EARTHING & LIGHTNING). </li></ul><ul><li>COORDINATION WITH TEAM </li></ul>
  9. 9. DETAIL <ul><li>PREPARING DETAIL REPORT </li></ul><ul><li>ACTUAL LOAD CALCULATION </li></ul><ul><li>SKECHING THE LAYOUT DRAWINGS. </li></ul><ul><li>LIGHTING & POWER CIRCUITING. </li></ul><ul><li>LOAD DISTRIBUTION SHEDULE </li></ul><ul><li>CABLE, BUSBAR, TRAY SIZING </li></ul><ul><li>VOLTAGE DROP CALCULATIONS </li></ul><ul><li>SELECTION OF EQUIPMENTS & MATERIALS(ENERGY EFFICIENT) </li></ul><ul><li>CBU SIZING </li></ul><ul><li>DESIGNING OF OTHER ELECTRICAL </li></ul><ul><li>SERVICES(AS MENTIONED ABOVE) </li></ul><ul><li>FULFILING LOCAL AUTHORITIES STANDARDS & REGULATIONS </li></ul><ul><li>FOLLOWING QUALITY ASSURANCE PROCEDURES </li></ul><ul><li>PROJECT REVIEW </li></ul><ul><li>OBTAINING 50% PAYMENT </li></ul>
  10. 10. TENDER <ul><li>FOR APPROVAL OF DESIGN DRAWINGS & FULL PAYMENT </li></ul><ul><li>DOING NECESSARY AMENDMENTS </li></ul><ul><li>DRAWINGS ISSUED TO CONTRACTORS </li></ul>
  11. 11. CONSTRUCTION <ul><li>ISSUE OF DRAWINGS FOR CONSTRUCTION PURPOSE </li></ul><ul><li>COORDINATION WITH THE TEAM </li></ul><ul><li>COORDINATION WITH ARCHITECTURE & CONTRACTORS </li></ul>

×