Insightr InSite Web Analytics Process

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

0 comments

Post a comment

    Post a comment
    Embed Video
    Edit your comment Cancel

    1 Favorite

    Insightr InSite Web Analytics Process - Presentation Transcript

    1. Introducing Insightr “InSite” Website Governance, Measurement & Analytics

    2. What is InSite? A process to help organisations realise the value of digital business through structured web measurement and analytics © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 2
    3. Why do you need InSite? Source: Modified from eMarketer Visualisation via Unica & eMedia “The Web Analytics War: Reader Survey” (Sept 2009)" Web Analytics is a headache* * eMarketer September 2009 © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 3
    4. Insightr website measurement process. 1 Business  Business Appraisal Establish strategic business goals, assess measurement maturity, understand processes Analysis 2 Stakeholder Interviews Set objectives with business leaders, define goals and ownership of these 3 Systems Audit Identify current sources of data, identify gaps, opportunities and technology needed Data 4 Metrics & KPI Plan Document agreed metrics and KPI’s, create data relationships and drill downs, Planning 5 Monetisation / Goals Create ROI model for acquisition / retention, set benchmarks against targets Data 6 Data Design Document data capture process, identify variable, dimension & metric scope Collection 7 Implement & Code Project management of application coding process, administration of analytics tools 8 Report & Reporting Design report templates, prepare data extraction and design data visualisations Analyse 9 Relate metrics and KPI’s to campaigns / projects, analyse impact and predict results Analysis 10 Provide recommendations for performance improvements, set new targets & goals Action Planning © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 4
    5. Business Appraisal •  Business Appraisal the process of establishing strategic objectives for the business / project. We aim to understand current measurement processes and create broad measurement driven frameworks. " •  This work is carried out through the use of an established WAMM (Web Analytics Maturity Model) to template current and expected status " •  Deliverables:" •  Project planning & Initial goal setting discovery " •  Stakeholder identification& Review of project work already in progress " •  Face to face meetings with clients" © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 5
    6. Stakeholder Interviews •  Our Stakeholder Interviews gather business leadership requirements on measurement challenges; understanding how the business measures itself and what needs to be done to improve, fix, streamline internal processes." •  Deliverables:" •  Survey question preparation " •  Managing pre-interview survey (launching, hosting, analysis) " •  Running interviews / workshop sessions on-site " •  Notes write-up " •  Secondary (follow-up) telephone interviews " •  Final write-up " © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 6
    7. Systems Audit •  In the Systems Audit, the analyst will inspect the current measurement systems (metrics, reports), tool selection &or implementation, organisational structure to ensure that future recommendations align with current state and that changes can be successfully integrated." •  Deliverables:" •  Review of current metrics " •  Digital tactic analysis " •  Audit of current technologies and measurement plans" •  Exploration of systems (web and partners)" •  Identification of data issues, platform issues (eg tracking web 2.0, social media)" © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 7
    8. Metrics & KPI Plan •  The measurement plan is the core reference document for providing reporting and analysis structures – by ensuring standardization and agreement on metrics and enabling efficient data collection processes to be rolled out." •  Deliverables:" •  Mapping tactics to metrics " •  Documenting metrics " •  Framework development " •  Prioritization of metrics " •  Presentation and reviews " © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 8
    9. Monetisation / Goals •  Developing a Monetization and Goals model supplements the measurement plan by creating targets with dollar values attributed to them in which to measure success and ROI of the project. By monetizing we help provide ROI calculations for projects" •  Deliverables:" •  Identify project goals according to measurement plan" •  Create a value matrix for goals (eg lead is worth $50)" •  Create tiered model for goals (high, med, low) for importance and value (for weighting)" •  Create scenario plan for conversion events required to break even" © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 9
    10. Data Design •  In Data Design we take the measurement plan and transform into a tactical variable design document that identifies exactly how we are going to capture data that can later be exported and visualised in a report. This involves two key processes – identification of dimensions and creation of metrics. " •  Deliverables:" •  Dimension & Metric creation" •  Wireframe, IA review " •  Consulting on tool selection " © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 10
    11. Implement & Code •  Implementation is a critical component in the process, making sure that data collection methodologies are well formed, that web engineers are able to code for this and that data collected is well formed via rigorous QA are all important deliverables in this stage. " •  Deliverables:" •  Develop tagging documents " •  Engineer walk-through " •  Tool configuration " •  QA and testing " © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 11
    12. Reporting •  Reporting configuration and automation are the primary objectives here. Streamlined processes will free stakeholders from populating data to enabling data driven decision making." •  Deliverables:" •  Report template design" •  Data extraction " •  Data visualization / charting / formatting " •  Report automation " © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 12
    13. Analysis •  Analysis of your data is done to provide insight that will help your business go beyond expected goals. Our analysis approaches are based on over a decadeʼs experience in deriving segmented and targeted learnings from complex web data that will ensure you and your management team get more ROI from digital investments" •  Deliverables:" •  Brainstorming and identification of analysis opportunities" •  Data collection and management" •  Interpretation shared and next steps analysis /presentation" © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 13
    14. Action Planning •  Action Planning is a collaborative exercise where analytical insight is transformed into strategic and tactical process or content recommendations are developed. Typically action planning leads directly into the introduction of testing programs via a2a (Analysis to Action)" •  Deliverables:" •  Project plan identifying key follow up analysis projects" •  Identification of testing plans and strategy to deploy improvements" •  Partnership with agencies to develop content and user experience fixes" © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 14
    15. Test, Optimise & Learn •  Using our a2a (Analysis to Action) process we are able to achieve what most organisations struggle with: making data relevant, actionable and a causal factor in generating and increasing digital marketing ROI " •  Deliverables:" •  Testing plan and prioritisation matrix" •  Partnership with agencies to develop and deploy test content to sites" •  Observation and Analysis of test data" © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 15
    16. If this is of interest to you, let’s talk about your business © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 16
    17. talk@insightr.com © All Rights Reserved / 2009 Insightr Consulting" DATE September 09 SLIDE 17

    + Insightr ConsultingInsightr Consulting, 2 months ago

    custom

    544 views, 1 favs, 1 embeds more stats

    In this presentation you'll learn about "InSite" th more

    More info about this document

    CC Attribution-NonCommercial LicenseCC Attribution-NonCommercial License

    Go to text version

    • Total Views 544
      • 507 on SlideShare
      • 37 from embeds
    • Comments 0
    • Favorites 1
    • Downloads 0
    Most viewed embeds
    • 37 views on http://insightr.com

    more

    All embeds
    • 37 views on http://insightr.com

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories