SEWERAGEINFRASTRUCTURE UNDER       GREATER KUALA  LUMPUR/KLANG VALLEY           INITIATIVES         River of Life & Sewera...
Contents     1        Background     2      Scopes of Project     3     Outcomes of Project
12 National Key EconomicAreas (NKEAs)                                       September 21, 2010                      Greate...
10 EPPs & 2 BOsEPP#1 – MNC AttractionEPP#2 – Talent AttractionEPP#3 – High Speed RailEPP#4 – Mass Rapid Transit           ...
GREATER KL/KV REGIONAL CATCHMENT                         RIVER                        OF LIFE                     SEWERAGE...
SEWERAGE ISSUES WITHIN    GREATER KL/KV CATCHMENT   Old plants which are unable to achieve DOE gazetted    standards.   ...
PROPOSED SOLUTIONS   Refurbishment problematic plants.                                                               Befo...
River of Life                                   1. RATIONALISATION OF 17 STPs AT6. UPGRADING OF 16 STPs AT         SETAPAK...
Sewerage Non River6. SEWER REHABILITATION WORKSAT KELANG, SHAH ALAM, SUBANGJAYA AND PETALING JAYA (F16 &F17, G10 & G11)7. ...
NEW SEWER PIPE                                      – 380.5 KM                                          2   CONNECTED PE  ...
Outcome of Project    Will be able to reduce number of small plants    Reduce the risk on non compliance to DOE standard...
PROGRESS STATUS PROJECT RIVER OF LIFE                       Implementation                                            No. ...
PROGRESS STATUS PROJECT SEWERAGE NON RIVER                              Implementation                                    ...
Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives
Upcoming SlideShare
Loading in...5
×

Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives

1,476

Published on

EASAN : Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives, Sanitasi, Air Limbah, Offsite System, Sistem Perpiaan

1 Comment
0 Likes
Statistics
Notes
  • Be the first to like this

No Downloads
Views
Total Views
1,476
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
65
Comments
1
Likes
0
Embeds 0
No embeds

No notes for slide

Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives

  1. 1. SEWERAGEINFRASTRUCTURE UNDER GREATER KUALA LUMPUR/KLANG VALLEY INITIATIVES River of Life & Sewerage Non River
  2. 2. Contents 1 Background 2 Scopes of Project 3 Outcomes of Project
  3. 3. 12 National Key EconomicAreas (NKEAs) September 21, 2010 Greater KL/KV Aspiration 20-20 by 2020 To be the only metropolis in Asia that simultaneously achieves top-20 economic growth and be among the global top-20 most livable cities by 2020
  4. 4. 10 EPPs & 2 BOsEPP#1 – MNC AttractionEPP#2 – Talent AttractionEPP#3 – High Speed RailEPP#4 – Mass Rapid Transit TIMELINE : 2011 – 2020 AGENCY : SSDEPP#6 – Greener KL CAPITAL COST : RM 5.6 BILEPP#7 – Global AttractionsEPP#8 – Pedestrian Network TOTALEPP#9 – Solid Waste Management PROJECT : 21EPP#10 – Property - ROL – 9 - SNR - 12BO#1 – Vitalizing Putrajaya
  5. 5. GREATER KL/KV REGIONAL CATCHMENT RIVER OF LIFE SEWERAGE NON RIVER
  6. 6. SEWERAGE ISSUES WITHIN GREATER KL/KV CATCHMENT Old plants which are unable to achieve DOE gazetted standards. Defective sewerlines. Undersized sewerlines unable to cater for rampant growth. Illegal discharge Issues. Buffer issues. Property Connection Issues Risks beyond control-Flooding, structure failures, landslide/erosion High number of private plants Septic Tank
  7. 7. PROPOSED SOLUTIONS Refurbishment problematic plants. Before Upgrading of non complying plants to meet Category 1 standard for nutrient removal. Rationalization & Regionalization programmes. Property connection works for premises where ISTs are still being used. Sewer investigation works to identify condition of existing aged sewers. After Sewer rehabilitation works for sewers in deteriorating condition which prior investigation works been carried out. Sewer upsizing works for sewers which are undersized and overloaded in the city centre due to rampant growth.
  8. 8. River of Life 1. RATIONALISATION OF 17 STPs AT6. UPGRADING OF 16 STPs AT SETAPAK, KERAMAT, WANGSA SELAYANG ( B19 – B22 ) MELAWATI (PAKEJ 1 & PAKEJ 2) 2. RATIONALISATION & UPGRADING OF STPs AT BUKIT ANTARABANGSA7. SEWER PIPE REHABILITAITONWORKS (G06 – G07) 3. CONNECTION WORKS TO PREMISES AT AMPANG HILIR , SEPUTEH & TITWANGSA (D39 – D42)8. RATIONALISATION OF 19 STPs AT DAMANSARA 4. JINJANG KEPONG STP & NETWORK9. STUDIES ON ABANDON STPs AT AMPANG, SELAYANG & KUALA 5. BUNUS STP & NETWORK LUMPUR
  9. 9. Sewerage Non River6. SEWER REHABILITATION WORKSAT KELANG, SHAH ALAM, SUBANGJAYA AND PETALING JAYA (F16 &F17, G10 & G11)7. RATIONALISATION OF 27 STPs ATJLN KLANG LAMA 1. SEWER NETWORK CONSTRUCITON AT JALAN KLANG LAMA, PETALING8. RATIONALISATION OF 33 STPs AT JAYA & SEPUTEH (D47 & D48)PUCHONG 2. CHERAS BATU 11 STP & NETWORK9. SEWER REHABILITATION WORKSIN SELANGOR (G08) 3. CHERAS JAYA STP & NETWORK10. LOT 130 STP & NETWORK 4. KAJANG 2 STP & NETWORK11 A) UPGRADING OF STPs (B23 – B37) 5. KAJANG 1 & 3 STP & NETWORK B) UPPER KERAYONG STP & NETWORK12. STUDIES ON GREENTECHNOLOGY APPLICATION TOEXISTING STPs
  10. 10. NEW SEWER PIPE – 380.5 KM 2 CONNECTED PE 2,060,000 PE PIPE 1 3 RAHABILITATION – 87.3 KM OUTPUT 4 STPs RATIONALISATION – 710 nos. Premis Connection 6 Public STP – 678 nos. Private STP – 32 nos. (IST) – 3,500 unit of houses 5** PE = Population Equivalent UPGRADING & REFURBISHMENT STP – 87 nos.
  11. 11. Outcome of Project Will be able to reduce number of small plants Reduce the risk on non compliance to DOE standards. Reduce the pollution loading on the receiving water courses. All upgraded & regionalized plants will meet DOE Standard A Category 1 Eliminate the risk of receiving complaints due to odour, buffer, noise & aesthetics Unlock land for potential redevelopment on rationalised STP sites
  12. 12. PROGRESS STATUS PROJECT RIVER OF LIFE Implementation No. Project Category Activities Remarks status Packages  Rasionalisation 17 STPs in Setapak, Keramat and Wangsa Melati (Pakej 1)  G06 Construction stage 6 package  G07Physical Projects  B19(8 projects, 18  B21packages)  B22 Tender / Evaluation  Rasionalisation 17 STPs in Setapak, Keramat and Wangsa Melati (Pakej Pre- 2) Construction  Rasionalisation in Bukit Stage Preparation of design / tender Antarabangsa 8 package (Conventional) document  Property connection in Taman Seputeh (D40)  Property connection (3 packages)**  Jinjang Kepong STP**  Bunus STP** Pre-Qualification Tender /  Rasionalisation Damansara 1 package Evaluation Pre- Construction Tender / Evaluation 1 package  B20 Stage (D&B) Preparation of need statement /  Jinjang Kepong Network 2 package  Bunus Network pre-bid document Research on abandoned STPs in KL,Non-physical Project Selayang dan Ampang Research Research on-going 1 package
  13. 13. PROGRESS STATUS PROJECT SEWERAGE NON RIVER Implementation No. Project Category Activities Remarks status Packages  Rasionalisasi 27 Loji di Jalan Klang LamaPhysical Projects  Kajang 2 STP(11 projects; 36 packages) Construction stage 5 packages  Kajang 2 Network  Lot 130 STP  G08  G10 & G11* Preparation of design / tender Pre- Construction  Kajang 1&3 STP* document and to be tendered Stage 6 packages  Cheras Jaya STP* in (Conventional)  Cheras Batu 11 STP* 2013  Upper KerayongSTP* Pre-Qualification Tender /  3 Pakej B28- B30 4 packages Evaluation  Puchong Network  Seputeh & PJ Network (D47 & D48)  4 pakej B24 – B27 10 Pre- Construction Tender / Evaluation  Lot 130 Network packages Stage  B23 (D&B)  F16 & F17  Cheras Jaya Network  Cheras Batu 11 Network Preparation of need 11  Kajang 1&3 Network* statement / pre-bid document packages  7 Pakej B31-B37*  Upper Kerayong Network*