FLOATING DECK SOLUTIONS: A NEW WAY FOR THE
PILBARA AND BEYOND

REGIONAL PORTS 2013
Presentation by COO Paul Toussaint-Jack...
Floating Deck Systems: New Projects for Dampier
•

The DFD (Dampier Floating Deck) and FDTS (Floating Deck Trans-shipment ...
Floating Deck System Design Elements
•

Easily and rapidly scalar to suit developing trade;

•

Uses shallow bathymetry (f...
Current logistics constraints
•

The Port of Dampier is one of the world’s largest bulk export ports and has excellent
pri...
GENERAL CARGO
VESSELS CAN BE
ALONGSIDE FOR A
WEEK TO SUIT CRANE
TO TRUCK
OPERATIONS

THE DCW : DUE TO
WIDTH AND SWL LIMITS...
•

Critical Supply Chain 1 (high cycle offshore support) is constrained because its
vessels need frequent and ready access...
4

Currently China to Pilbara
supply chain takes 31 days
(red route)
4

FDTS supports China to
Pilbara supply chain of jus...
DFD
3500 m2
25 tonnes/m2
2 x 100m berths
Drilling mud
Fuel
Fresh water
All hydraulic
Lateral movement <100mm
Demobilisatio...
OFFSHORE PLATFORMS MUST HAVE ACCESS TO A
SUPPLY BASE FUNCTION THAT IS CLOSE BY TO
OPTIMISE THE SUPPLY CHAIN AND REDUCE CHA...
DFD: solution for critical supply chain 1
•

Directly addresses berth constraints for both OSV and general freight
tonnage...
FDTS
3500 m2 floating decks
15000 tonne cargo dwt
Land-backed terminal
AQIS wash-down
Customs licensed
FDTS: the ‘shock absorber’
Trans-shipment in sheltered port anchorage
RORO or LOLO exchange
Deep water allows port access ...
DFD and FDTS for Dampier 2014

13
FDTS Floating Deck Cargo Area Capacity
Sample cargo area capacity (theoretical tight stow only) based on 110m x 38m floati...
Floating decks de-mobilised to sheltered cyclone moorings
15
FDTS – The Logistics Game Changer


Enables for the first time a pure cargo liner service to operate to the Pilbara by ac...
Floating Deck Systems – further applications


It is clear from the projects at Dampier that this type of infrastructure ...
FDTS under construction – Dampier, WA
Upcoming SlideShare
Loading in...5
×

Paul Toussaint-Jackson, DPA: Floating deck solutions: A new way for the Pilbara and beyond

751

Published on

Paul Toussaint-Jackson, Chief Operating Officer, Dampier Port Authority delivered this presentation at the 2013 Regional Ports Conference. The event showcased the latest port developments and assessed the policy, planning and operating strategies designed to maximise the efficiency of Australia's regional ports: gateways for facilitating trade, engagement and regional growth. Featuring local and national case studies, the two day event provided a spotlight on port developments across the country, highlighting the infrastructure, investment and long-term planning necessary to meet Australia’s current and potential competitiveness. For more information on the annual event, please visit the conference website: https://www.informa.com.au/regionalportsconference

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
751
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
25
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Paul Toussaint-Jackson, DPA: Floating deck solutions: A new way for the Pilbara and beyond"

  1. 1. FLOATING DECK SOLUTIONS: A NEW WAY FOR THE PILBARA AND BEYOND REGIONAL PORTS 2013 Presentation by COO Paul Toussaint-Jackson DFD and FDTS Concepts Designer and Developer 1
  2. 2. Floating Deck Systems: New Projects for Dampier • The DFD (Dampier Floating Deck) and FDTS (Floating Deck Trans-shipment System) are two projects that I have designed and developed on behalf of the Port of Dampier to improve critical supply chain constraints affecting both the Port and the Pilbara region in general. • These projects are intended have the maximum trade facilitation impact at a fraction of the cost of conventional infrastructure and with much shorter development times. • The DFD I conceived as a forward floating supply base function to directly assist the logistics of supplying offshore oil and gas platforms out of Dampier. • The FDTS I designed as a land-backed facility with a moving floating deck that will allow genuine international liner cargo shipping services to call at Dampier for the first time. • Both the FDTS and DFD are designed as logistics systems rather than simple infrastructure solutions; • These projects are game changers for logistics into the Northwest and are expected to do much to fundamentally address some of the core logistics productivity issues we have in that very important region for the Australian economy.
  3. 3. Floating Deck System Design Elements • Easily and rapidly scalar to suit developing trade; • Uses shallow bathymetry (for the FDTS) as an asset rather than an obstacle: no dredging is required. These facilities have minimal environmental impact; • Rapidly constructed in a far shorter timeframe than conventional infrastructure; • Far lower capital cost than conventional infrastructure of equivalent capability; • Highly robust, safe and flexible and be highly suitable for use in cyclone prone areas; • Readily handled by existing port services and operations; • Completely privately funded but provide good revenue returns to the State, legacy assets for the State and retain key controls for the State over the land or seabed through lease/license instruments; • Open access for general custom and have Customs and AQIS approved facilities. • All types of project cargo handled including multi-thousand tonne pre-assembled modules;
  4. 4. Current logistics constraints • The Port of Dampier is one of the world’s largest bulk export ports and has excellent private facilities for the export of LNG, condensate, iron ore and salt. These facilities are profit-driven and fit for purpose. • The principal import facility however, the Dampier Cargo Wharf (DCW), requires expanded capacity to cope with the growth in trade. Congestion causes delays and demurrage costs for project vessels, additional costs to projects and reinforces the use of inefficient long-distance road-haul services to our region for large oversize and out of gauge project cargo. • In 2011 I undertook a study to find a solution to not only the constraints of the DCW facility but also the wider logistics productivity issue for the Pilbara. • From this study I identified two critical supply chains that conflict at Dampier: - Critical Supply Chain 1 – The high cycle marine services supply to offshore oil and gas installations; and, - Critical Supply Chain 2 – The inwards industrial and re-export supply chain. • Both of these supply chains rely heavily on access to the DCW. • Finally I recognised the advantages of enabling direct call international liner services.
  5. 5. GENERAL CARGO VESSELS CAN BE ALONGSIDE FOR A WEEK TO SUIT CRANE TO TRUCK OPERATIONS THE DCW : DUE TO WIDTH AND SWL LIMITS CARGO CANNOT BE STACKED ON THE WHARF BUT MUST BE WORKED TO TRUCK OFFSHORE SUPPLY VESSELS NEED RAPID CYCLE ACCESS TO THE DCW.
  6. 6. • Critical Supply Chain 1 (high cycle offshore support) is constrained because its vessels need frequent and ready access to the DCW. The development of trade requires further berths: a general cargo vessel can occupy the existing western berths for up to a week. • Critical Supply Chain 2 (Inwards industrial supply) is constrained because the development of trade requires further berths: project or general cargo exchange requires extra time due to the need to work crane to truck. • Both supply chains do not have stacking and handling areas available within the port gates and must rely on private sites located elsewhere. Available land for private use in the general port environs for cargo facilitation is in limited supply and in high demand. The DCW cargo operations are therefore impacted by varying truck cartage cycle times, the number of available trucks and the additional time required to stevedore oversize and out of gauge cargo. • By removing the constraints to both critical supply chains I realised that regular internationally networked cargo liner shipping services to the Pilbara could be facilitated. This would allow re-work of current supply networks through Eastern and Southern main ports and reduce an over reliance on long-distance road-haul. To get genuine liner services to call at the port would however require a complete re-think on infrastructure.
  7. 7. 4 Currently China to Pilbara supply chain takes 31 days (red route) 4 FDTS supports China to Pilbara supply chain of just 9 days 2 12 Legend 3 Current rail haul Current road haul East Coast liner route 5 2 Optional road haul 3 New West Coast liner options 5 6 FDTS provides a general cargo terminal function at Dampier supporting the development of new liner services. 5 4 4
  8. 8. DFD 3500 m2 25 tonnes/m2 2 x 100m berths Drilling mud Fuel Fresh water All hydraulic Lateral movement <100mm Demobilisation < 1 hour
  9. 9. OFFSHORE PLATFORMS MUST HAVE ACCESS TO A SUPPLY BASE FUNCTION THAT IS CLOSE BY TO OPTIMISE THE SUPPLY CHAIN AND REDUCE CHARTER COSTS. DAMPIIER IS IN PROXIMITY TO THE OFFSHORE DEVELOPMENTS AND ITS DFD PROJECT IS IDEALLY SITUATED TO FACILITATE PLATFORM SERVICES.
  10. 10. DFD: solution for critical supply chain 1 • Directly addresses berth constraints for both OSV and general freight tonnage into the Pilbara; • Creates forward ‘supply base’ function to facilitate the service supply chain for the oil and gas industry and to enable its re-design reducing pressure on land close to the Port; • Reduces cost to the oil and gas industry by improving cycle times for OSVs and reducing overall charter requirements.
  11. 11. FDTS 3500 m2 floating decks 15000 tonne cargo dwt Land-backed terminal AQIS wash-down Customs licensed
  12. 12. FDTS: the ‘shock absorber’ Trans-shipment in sheltered port anchorage RORO or LOLO exchange Deep water allows port access by large cargo liners At Dampier floating deck will take 1.5 hours to shore
  13. 13. DFD and FDTS for Dampier 2014 13
  14. 14. FDTS Floating Deck Cargo Area Capacity Sample cargo area capacity (theoretical tight stow only) based on 110m x 38m floating deck (4180 m2 of useable area). OR 28 CAT 797 Mining Haul Trucks Largest mechanical haul trucks in the world (400 tonne payload) 114 CAT D9 Tractors 48.8 tonnes OR 144 Hammersley Iron Ore Rail Wagons 560+ TEU Sea Containers double stacked or 280 single stacked
  15. 15. Floating decks de-mobilised to sheltered cyclone moorings 15
  16. 16. FDTS – The Logistics Game Changer  Enables for the first time a pure cargo liner service to operate to the Pilbara by acting as a logistics ‘shock absorber’ thereby removing all current constraints to liner services.  Is ideally suited to a global RORO break-bulk service enabling realignment of major industrial supply chains;  Has national supply chain ramifications including reducing supply chain times from China by up to 70%;  Facilitates LOLO operations and relieves spot-chartered general cargo vessel congestion;  Facilitates cold supply chain into the Pilbara;  Reduces oversize vehicle movements on the North West Coastal Highway;  Improves the economics and prospects for coastal shipping services.
  17. 17. Floating Deck Systems – further applications  It is clear from the projects at Dampier that this type of infrastructure could have ready application elsewhere. I believe it is infrastructure for the future.  Coastal topography, meteorological and environmental conditions need to be carefully assessed for each new development;  The real solution for each site is not as infrastructure alone but as a logistics system if the full value of the installation is to be realised.  The many attributes of these systems including lower capital cost make them attractive to the private sector.  The systems are designed to be complementary to traditional infrastructure and can be applied to developed ports or greenfield sites.  Low environmental impact makes the systems ideal for environmentally sensitive sites.
  18. 18. FDTS under construction – Dampier, WA
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×