The Emergence of Mid-Scale
Barge Based LNG Plants

Wison Offshore & Marine
November 2013

www.wison.com | www.wison-offsho...
Introduction to the Wison Group

www.wison.com | www.wison-offshore.com

Page:2
The Wison Group


Founded November 1997



Presently China’s largest private
chemical engineering company



A provider...
Business Segments
Focusing on the Energy Industry and Hi-tech Sectors

Wison Group
Engineering Services

Specializing in
p...
Caribbean FLNG Project – Setting
the stage for small-medium scale
FLNG

www.wison.com | www.wison-offshore.com

Page:5
Caribbean FLNG Project Background
 Pacific Rubiales Energy (PRE) via its
subsidiary Pacific Stratus Energy Colombia
Corp....
The FLRSU Solution
 Selected FLRSU solution
is a non-propelled barge
moored to an offshore jetty.
 FLRSU is to be locate...
Caribbean FLNG Project Details and Scope




Wison is the primary EPCIC
contractor to EXMAR for the
barge-based FLRSU.
W...
FLNG Block Flow
BLOCK FLOW DIAGRAM
CO2
VENT

H2O

REFRIGERANT
MAKEUP/
STORAGE

FEED GAS

FUEL

DEHYDRATION
/Hg REMOVAL

TR...
PRICO® SMR Liquefaction Technology




Black & Veatch’s patented PRICO®
Single Mixed Refrigerant technology
is the simpl...
Gas Handling and Transfer System
 TGE to provide 3 x 5,367 m3 LNG tanks
giving a total of 16,100 m3 capacity.
 Tanks are...
FLRSU GA Drawing – Plan View

View shows locations of 3 LNG Storage Tanks inside hull

www.wison.com | www.wison-offshore....
FLSRU Mooring Arrangement

 FLRSU is moored to four guide piles
using a bracket system that allow
vertical motion (heave)...
LNG Loading/Offloading
 Pipeline gas will enter FLRSU via
(conventional) export hoses between
FLRSU and jetty.
 LNG will...
Project Schedule – Key Milestones
MILESTONE

DATE

Project Start Date

April 2012

FLRSU Strike Steel

December 2012

FLSR...
Nantong Yard
 Fully operational in 2006
‒ Located at the bank of the Yangtze River
(76 km from the open sea)
‒ Occupies 6...
Yard Fabrication & Commissioning Sequence
FLRSU Barge Build Sequence:
Hull & Deck Block Fabrication & Dry Dock Build

Hull...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

WHI’s Dry Dock (260m x 68m)

www.wison.com | www.wison-offshore.com

Page:18
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.1 LIFTING BLOCK HB04/05/06C

www.wison.com | www.wison-offshore.com

Page:1...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.1 LIFTING BLOCK HB04/05/06C

www.wison.com | www.wison-offshore.com

Page:2...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.2 LIFTING BLOCK HB01/02/03C

www.wison.com | www.wison-offshore.com

Page:2...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.2 LIFTING BLOCK HB01/02/03C

www.wison.com | www.wison-offshore.com

Page:2...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.3 LIFTING HT11

www.wison.com | www.wison-offshore.com

Page:23
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.3 LIFTING BLOCK HT11

www.wison.com | www.wison-offshore.com

Page:24
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.4 LIFTING BLOCK HB04/05/06P

www.wison.com | www.wison-offshore.com

Page:2...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.4 LIFTING BLOCK HB04/05/06P

www.wison.com | www.wison-offshore.com

Page:2...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.5 LIFTING BLOCK HB04/05/06S

www.wison.com | www.wison-offshore.com

Page:2...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.5 LIFTING BLOCK HB04/05/06S
www.wison.com | www.wison-offshore.com

Page:28
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.6 LIFTING BLOCK HB07/08C

www.wison.com | www.wison-offshore.com

Page:29
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.6 LIFTING BLOCK HB07/08C
www.wison.com | www.wison-offshore.com

Page:30
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.7 LIFTING BLOCK HB09/10C

www.wison.com | www.wison-offshore.com

Page:31
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.7 LIFTING BLOCK HB09/10C

www.wison.com | www.wison-offshore.com

Page:32
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.8 LIFTING BLOCK E101C

www.wison.com | www.wison-offshore.com

Page:33
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.8 LIFTING BLOCK E101C

www.wison.com | www.wison-offshore.com

Page:34
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.9 LIFTING BLOCK HT21
www.wison.com | www.wison-offshore.com

Page:35
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.10 LIFTING BLOCK HB01/02/03P

www.wison.com | www.wison-offshore.com

Page:...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.11 LIFTING BLOCK HB01/02/03S
www.wison.com | www.wison-offshore.com

Page:3...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.12 LIFTING BLOCK HB07/08/09/10P
www.wison.com | www.wison-offshore.com

Pag...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.13 LIFTING BLOCK HB07/08/09/10S

www.wison.com | www.wison-offshore.com

Pa...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.14 LIFTING BLOCK E102C

www.wison.com | www.wison-offshore.com

Page:40
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.15 LIFTING BLOCK E101P

www.wison.com | www.wison-offshore.com

Page:41
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.16 LIFITNG BLOCK E101S

www.wison.com | www.wison-offshore.com

Page:42
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.17 LIFTING BLOCK F101P/S

www.wison.com | www.wison-offshore.com

Page:43
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.18 LIFTING BLOCK HS04/05/06P

www.wison.com | www.wison-offshore.com

Page:...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.19 LIFTING BLOCK HS04/05/06S

www.wison.com | www.wison-offshore.com

Page:...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.20 LIFTING BLOCK HS07/08/09/10P

www.wison.com | www.wison-offshore.com

Pa...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.21 LIFTING BLOCK HS07/08/09/10S之前

www.wison.com | www.wison-offshore.com

...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.21 LIFTING BLOCK HS07/08/09/10S
www.wison.com | www.wison-offshore.com

Pag...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.22 LIFTING BLOCK HS01/02/03P

www.wison.com | www.wison-offshore.com

Page:...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.23 LIFTING BLOCK HS01/02/03S

www.wison.com | www.wison-offshore.com

Page:...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.24 LIFTING BLOCK F201P/S

www.wison.com | www.wison-offshore.com

Page:51
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.25 LIFTING BLOCK E201C
www.wison.com | www.wison-offshore.com

Page:52
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.26 LIFTING BLOCK E202C
www.wison.com | www.wison-offshore.com

Page:53
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.27 LIFTING BLOCK F301P/S

www.wison.com | www.wison-offshore.com

Page:54
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.28 LIFTING BLOCK E201/301/401P
www.wison.com | www.wison-offshore.com

Page...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.29 LIFTING BLOCK E201/301/401S

www.wison.com | www.wison-offshore.com

Pag...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

TGE TANK LIFTING

www.wison.com | www.wison-offshore.com

Page:57
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.30 LIFTING BLOCK HD07/08/09
www.wison.com | www.wison-offshore.com

Page:58
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.31 LIFTING BLOCK HD04/05/06

www.wison.com | www.wison-offshore.com

Page:5...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.32 LIFTING BLOCK HD01/02/03

www.wison.com | www.wison-offshore.com

Page:6...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

MAIN GENERATOR INSTALLATION
www.wison.com | www.wison-offshore.com

Page:61
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.33 LIFTING E401C

www.wison.com | www.wison-offshore.com

Page:62
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.34 LIFTING BLOCK L101/201/301/401P/S

www.wison.com | www.wison-offshore.co...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.35 LIFTING FN

www.wison.com | www.wison-offshore.com

Page:64
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

NO.36 LIFTING WP

www.wison.com | www.wison-offshore.com

Page:65
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

HULL ASSEMBLY COMPLETE

www.wison.com | www.wison-offshore.com

Page:66
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

HULL MAIN DECK TOPVIEW

www.wison.com | www.wison-offshore.com

Page:67
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

TOPSIDE PIPE RACK INSTALLATION

www.wison.com | www.wison-offshore.com

Page:6...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

TOPSIDE EQUIPMENT INSTALLATION

www.wison.com | www.wison-offshore.com

Page:6...
EXMAR FLRSU PROJECT – BUILDING METHODOLOGY

TOPSIDE TOWER EQUIPMENT INSTALLATION

www.wison.com | www.wison-offshore.com

...
Block Assembly Mar 2013

www.wison.com | www.wison-offshore.com

Page:71
Block Assembly Mar 2013

www.wison.com | www.wison-offshore.com

Page:72
Block Assembly Mar 2013

www.wison.com | www.wison-offshore.com

Page:73
Fabrication of Piping Rack Mar 2013

www.wison.com | www.wison-offshore.com

Page:74
Hull Construction June 2013

www.wison.com | www.wison-offshore.com

Page:75
Keel Laying July 2013.

www.wison.com | www.wison-offshore.com

Page:76
Tank Delivery and Installation Oct 2013

www.wison.com | www.wison-offshore.com

Page:77
Setting the Last Deck Nov 2013

www.wison.com | www.wison-offshore.com

Page:78
Transportation & Installation

Voyage: ~13,000 n.miles

 Following yard commissioning, FLRSU will be loaded onto transpor...
FLRSU Project Technical Challenges
Area

Reason

Mitigation Strategy

Project Execution Efficiency

Project execution at m...
Australian FLNG Barge Applications

www.wison.com | www.wison-offshore.com

Page:81
Australian Opportunities
 Wison has signed an agreement with Black & Veatch to deliver FLNG barges
globally.
 The Austra...
Summary & Conclusions
 The first FLNG Barge, owned and
operated by EXMAR for Pacific
Rubiales Energy will be installed
of...
Wison Offshore & Marine
Suite 24, Level 24, 77 St Georges Tce, Perth, WA.
Kris Martinick – LNG Projects Development Manage...
Upcoming SlideShare
Loading in …5
×

Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

3,095 views
2,904 views

Published on

Kris Martinick, LNG Project Development Manager, Wison Offshore & Marine delivered this presentation at the 2013 FLNG Forum in Perth. The two day conference brings attendees key insights into the technology and concepts that will unlock Australia’s stranded gas reserves. This event brings together case studies, keynote and technical presentations from the experts at the forefront of the Floating LNG projects. For more information about the forum, please visit the event website: http://www.informa.com.au/flngforum2013

Published in: Business
0 Comments
4 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
3,095
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
222
Comments
0
Likes
4
Embeds 0
No embeds

No notes for slide

Kris Martinick, Wison Offshore & Marine: Fabricating Exmar’s Columbia FLNG barge in partnership with Black & Veatch

  1. 1. The Emergence of Mid-Scale Barge Based LNG Plants Wison Offshore & Marine November 2013 www.wison.com | www.wison-offshore.com Page:1
  2. 2. Introduction to the Wison Group www.wison.com | www.wison-offshore.com Page:2
  3. 3. The Wison Group  Founded November 1997  Presently China’s largest private chemical engineering company  A provider of engineering, project management, and construction management services  11 Member Companies across 4 sectors  Wison Engineering Limited was listed on the Hong Kong stock exchange in December 2012 www.wison.com | www.wison-offshore.com Page:3
  4. 4. Business Segments Focusing on the Energy Industry and Hi-tech Sectors Wison Group Engineering Services Specializing in petrochemicals, coal chemicals and refining industries Offshore & Marine A word-class EPC Contactor focused providing solutions on international oil and gas EPC Projects. Clean Energy Using coal as feed stock, Wison Energy provides high quality industrial gases via clean coal technology. Emerging Business Development of emerging chemical and LNG related businesses. The Wison Group employs approximately 3,000 people worldwide www.wison.com | www.wison-offshore.com Page:4
  5. 5. Caribbean FLNG Project – Setting the stage for small-medium scale FLNG www.wison.com | www.wison-offshore.com Page:5
  6. 6. Caribbean FLNG Project Background  Pacific Rubiales Energy (PRE) via its subsidiary Pacific Stratus Energy Colombia Corp. (PSE), signed a natural gas/ LNG Liquefaction, Regasification, Storage and Loading Services Agreement with Belgium based EXMAR NV: − EXMAR will build, operate and maintain a Floating Liquefaction Regasification & Storage Unit (FLRSU) to be located on the Colombian Caribbean coast. − PSE will have exclusive rights to supply and liquefy up to 0.5 mmtpa of LNG over a 15 year period, under a tolling structure.  The source of the gas is PSE’s La Creciente Field.  PSE will build an 18 inch pipeline to transport gas from the field to the coast (88 Km). www.wison.com | www.wison-offshore.com Page:6
  7. 7. The FLRSU Solution  Selected FLRSU solution is a non-propelled barge moored to an offshore jetty.  FLRSU is to be located 4 Km offshore in 14 m water depth.  FLSRU storage and process requirements are: - Storage - 16,000 m3 - Liquefaction - 0.5mtpa - Regasification - 400mmscfd Regasification option:  65% of Colombia’s electricity comes from hydropower.  In some years (la Nina) water shortages may require importing LNG to generate power to maintain supply. www.wison.com | www.wison-offshore.com Page:7  Alongside FLRSU is 170,000 m3 LNG Floating Storage Unit (FSU).
  8. 8. Caribbean FLNG Project Details and Scope   Wison is the primary EPCIC contractor to EXMAR for the barge-based FLRSU. Wison’s Scope: −  FLRSU Project Management, Engineering, Procurement, Construction, Commissioning, Transportation, Installation and Start-up of the Facility. Major subcontractors : - - Black & Veatch: Topside LNG Equipment Design, Procurement & Commissioning TGE: Cargo Tanks & Cargo Handling Systems www.wison.com | www.wison-offshore.com Page:8
  9. 9. FLNG Block Flow BLOCK FLOW DIAGRAM CO2 VENT H2O REFRIGERANT MAKEUP/ STORAGE FEED GAS FUEL DEHYDRATION /Hg REMOVAL TREATING LIQUEFACTION LNG FLASH/ FUEL COMPRESSOR LPG/ CONDENSATE FRACTIONATION LIQUID SEPARATOR INLET RECEPTION LNG STORAGE LNG POWER GENERATION (OPTION) WARM FLARE CRYOGENIC FLARE EMERGENCY POWER EFFLUENT TREATING FLARES www.wison.com | www.wison-offshore.com WATER TREATING/ DISTRIBUTION FIRE UTILITY POTABLE HOT OIL OR STEAM NITROGEN CONSUMABLES STORAGE LUBE OILS CHEMICALS MISC. INSTRUMENT AIR PLANT AIR Page:9 CONDENSATE LPG
  10. 10. PRICO® SMR Liquefaction Technology   Black & Veatch’s patented PRICO® Single Mixed Refrigerant technology is the simplest form of mixed refrigerant cycle. B&V has considerable experience in the field: -     27 global LNG plants in operation 11 plants under construction Process is scalable over wide capacity range but core process remains the same. Compact layout with modular philosophy lends itself to use offshore. Simplicity of process results in relatively low cost. Simplified operations lead to quick startup. www.wison.com | www.wison-offshore.com Page:10
  11. 11. Gas Handling and Transfer System  TGE to provide 3 x 5,367 m3 LNG tanks giving a total of 16,100 m3 capacity.  Tanks are robust IMO Type C, no sloshing and no secondary barrier, strong against inner and outer pressure with safe and simple control. Tanks are designed for easy operation and maintenance.  TGE has more than 25 years experience in the field and more than 100 gas carrier contracts.  Stand-alone tank design selected to minimize overall project schedule – tanks may be fabricated in parallel and lifted into FLRSU hull at shipyard.  TGE also to supply cargo transfer system, and associated gas safety systems, electrical equipment and instrumentation, and auxiliary systems. www.wison.com | www.wison-offshore.com Page:11
  12. 12. FLRSU GA Drawing – Plan View View shows locations of 3 LNG Storage Tanks inside hull www.wison.com | www.wison-offshore.com Page:12
  13. 13. FLSRU Mooring Arrangement  FLRSU is moored to four guide piles using a bracket system that allow vertical motion (heave) of barge hull only.  FSU is (conventionally) moored to mooring piles on offshore jetty. www.wison.com | www.wison-offshore.com Page:13 Bracket & Fender Elements
  14. 14. LNG Loading/Offloading  Pipeline gas will enter FLRSU via (conventional) export hoses between FLRSU and jetty.  LNG will be offloaded from FLRSU to FSU via midship manifolds using EXMAR’s STS (ship-to-ship) transfer system.  System is well-proven with more than 400 transfers already recorded. Product Flow – LNG Export www.wison.com | www.wison-offshore.com Page:14
  15. 15. Project Schedule – Key Milestones MILESTONE DATE Project Start Date April 2012 FLRSU Strike Steel December 2012 FLSRU Keel Laying Start July 2013 Topside Construction Start October 2013 FLRSU Equipment Installation Start November 2013 Hull Construction Complete November 2013 FLRSU Mechanical Completion July 2014 FLRSU Provisional Acceptance Ex-Yard September 2014 FLSRU Sail to Colombia on Dry Tow Vessel December 2014 FLSRU Moored at Offshore Jetty January 2015 FLRSU Final Commissioning Start January 2015 FLRSU Final Commissioning End April 2015 Provisional Acceptance on Site – Project End April 2015 www.wison.com | www.wison-offshore.com Page:15
  16. 16. Nantong Yard  Fully operational in 2006 ‒ Located at the bank of the Yangtze River (76 km from the open sea) ‒ Occupies 640,000 square meters and maintains 735 meters of river front  Annual throughput capacity of 70,000 Tonnes  Staffing: ‒ Normal: 2,300 (700 direct employees plus 1,600 contractors) ‒ Peak: 3,500 (including contractors) www.wison.com | www.wison-offshore.com www.wison-offshore.com Page:16
  17. 17. Yard Fabrication & Commissioning Sequence FLRSU Barge Build Sequence: Hull & Deck Block Fabrication & Dry Dock Build Hull & Deck Equipment Deliveries Mechanical Completion Commissioning Out-dock, Trials & Seafastening www.wison.com | www.wison-offshore.com Page:17
  18. 18. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY WHI’s Dry Dock (260m x 68m) www.wison.com | www.wison-offshore.com Page:18
  19. 19. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.1 LIFTING BLOCK HB04/05/06C www.wison.com | www.wison-offshore.com Page:19
  20. 20. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.1 LIFTING BLOCK HB04/05/06C www.wison.com | www.wison-offshore.com Page:20
  21. 21. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.2 LIFTING BLOCK HB01/02/03C www.wison.com | www.wison-offshore.com Page:21
  22. 22. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.2 LIFTING BLOCK HB01/02/03C www.wison.com | www.wison-offshore.com Page:22
  23. 23. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.3 LIFTING HT11 www.wison.com | www.wison-offshore.com Page:23
  24. 24. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.3 LIFTING BLOCK HT11 www.wison.com | www.wison-offshore.com Page:24
  25. 25. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.4 LIFTING BLOCK HB04/05/06P www.wison.com | www.wison-offshore.com Page:25
  26. 26. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.4 LIFTING BLOCK HB04/05/06P www.wison.com | www.wison-offshore.com Page:26
  27. 27. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.5 LIFTING BLOCK HB04/05/06S www.wison.com | www.wison-offshore.com Page:27
  28. 28. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.5 LIFTING BLOCK HB04/05/06S www.wison.com | www.wison-offshore.com Page:28
  29. 29. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.6 LIFTING BLOCK HB07/08C www.wison.com | www.wison-offshore.com Page:29
  30. 30. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.6 LIFTING BLOCK HB07/08C www.wison.com | www.wison-offshore.com Page:30
  31. 31. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.7 LIFTING BLOCK HB09/10C www.wison.com | www.wison-offshore.com Page:31
  32. 32. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.7 LIFTING BLOCK HB09/10C www.wison.com | www.wison-offshore.com Page:32
  33. 33. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.8 LIFTING BLOCK E101C www.wison.com | www.wison-offshore.com Page:33
  34. 34. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.8 LIFTING BLOCK E101C www.wison.com | www.wison-offshore.com Page:34
  35. 35. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.9 LIFTING BLOCK HT21 www.wison.com | www.wison-offshore.com Page:35
  36. 36. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.10 LIFTING BLOCK HB01/02/03P www.wison.com | www.wison-offshore.com Page:36
  37. 37. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.11 LIFTING BLOCK HB01/02/03S www.wison.com | www.wison-offshore.com Page:37
  38. 38. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.12 LIFTING BLOCK HB07/08/09/10P www.wison.com | www.wison-offshore.com Page:38
  39. 39. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.13 LIFTING BLOCK HB07/08/09/10S www.wison.com | www.wison-offshore.com Page:39
  40. 40. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.14 LIFTING BLOCK E102C www.wison.com | www.wison-offshore.com Page:40
  41. 41. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.15 LIFTING BLOCK E101P www.wison.com | www.wison-offshore.com Page:41
  42. 42. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.16 LIFITNG BLOCK E101S www.wison.com | www.wison-offshore.com Page:42
  43. 43. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.17 LIFTING BLOCK F101P/S www.wison.com | www.wison-offshore.com Page:43
  44. 44. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.18 LIFTING BLOCK HS04/05/06P www.wison.com | www.wison-offshore.com Page:44
  45. 45. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.19 LIFTING BLOCK HS04/05/06S www.wison.com | www.wison-offshore.com Page:45
  46. 46. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.20 LIFTING BLOCK HS07/08/09/10P www.wison.com | www.wison-offshore.com Page:46
  47. 47. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.21 LIFTING BLOCK HS07/08/09/10S之前 www.wison.com | www.wison-offshore.com Page:47
  48. 48. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.21 LIFTING BLOCK HS07/08/09/10S www.wison.com | www.wison-offshore.com Page:48
  49. 49. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.22 LIFTING BLOCK HS01/02/03P www.wison.com | www.wison-offshore.com Page:49
  50. 50. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.23 LIFTING BLOCK HS01/02/03S www.wison.com | www.wison-offshore.com Page:50
  51. 51. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.24 LIFTING BLOCK F201P/S www.wison.com | www.wison-offshore.com Page:51
  52. 52. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.25 LIFTING BLOCK E201C www.wison.com | www.wison-offshore.com Page:52
  53. 53. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.26 LIFTING BLOCK E202C www.wison.com | www.wison-offshore.com Page:53
  54. 54. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.27 LIFTING BLOCK F301P/S www.wison.com | www.wison-offshore.com Page:54
  55. 55. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.28 LIFTING BLOCK E201/301/401P www.wison.com | www.wison-offshore.com Page:55
  56. 56. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.29 LIFTING BLOCK E201/301/401S www.wison.com | www.wison-offshore.com Page:56
  57. 57. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY TGE TANK LIFTING www.wison.com | www.wison-offshore.com Page:57
  58. 58. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.30 LIFTING BLOCK HD07/08/09 www.wison.com | www.wison-offshore.com Page:58
  59. 59. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.31 LIFTING BLOCK HD04/05/06 www.wison.com | www.wison-offshore.com Page:59
  60. 60. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.32 LIFTING BLOCK HD01/02/03 www.wison.com | www.wison-offshore.com Page:60
  61. 61. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY MAIN GENERATOR INSTALLATION www.wison.com | www.wison-offshore.com Page:61
  62. 62. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.33 LIFTING E401C www.wison.com | www.wison-offshore.com Page:62
  63. 63. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.34 LIFTING BLOCK L101/201/301/401P/S www.wison.com | www.wison-offshore.com Page:63
  64. 64. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.35 LIFTING FN www.wison.com | www.wison-offshore.com Page:64
  65. 65. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY NO.36 LIFTING WP www.wison.com | www.wison-offshore.com Page:65
  66. 66. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY HULL ASSEMBLY COMPLETE www.wison.com | www.wison-offshore.com Page:66
  67. 67. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY HULL MAIN DECK TOPVIEW www.wison.com | www.wison-offshore.com Page:67
  68. 68. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY TOPSIDE PIPE RACK INSTALLATION www.wison.com | www.wison-offshore.com Page:68
  69. 69. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY TOPSIDE EQUIPMENT INSTALLATION www.wison.com | www.wison-offshore.com Page:69
  70. 70. EXMAR FLRSU PROJECT – BUILDING METHODOLOGY TOPSIDE TOWER EQUIPMENT INSTALLATION www.wison.com | www.wison-offshore.com Page:70
  71. 71. Block Assembly Mar 2013 www.wison.com | www.wison-offshore.com Page:71
  72. 72. Block Assembly Mar 2013 www.wison.com | www.wison-offshore.com Page:72
  73. 73. Block Assembly Mar 2013 www.wison.com | www.wison-offshore.com Page:73
  74. 74. Fabrication of Piping Rack Mar 2013 www.wison.com | www.wison-offshore.com Page:74
  75. 75. Hull Construction June 2013 www.wison.com | www.wison-offshore.com Page:75
  76. 76. Keel Laying July 2013. www.wison.com | www.wison-offshore.com Page:76
  77. 77. Tank Delivery and Installation Oct 2013 www.wison.com | www.wison-offshore.com Page:77
  78. 78. Setting the Last Deck Nov 2013 www.wison.com | www.wison-offshore.com Page:78
  79. 79. Transportation & Installation Voyage: ~13,000 n.miles  Following yard commissioning, FLRSU will be loaded onto transport vessel for dry transport to Colombia.  FLRSU will be offloaded at inshore location and wet-towed to final installation site.  Permanent mooring brackets will be installed while temporarily moored at site.  Gas export hoses will be installed from jetty to FLRSU. www.wison.com | www.wison-offshore.com Page:79
  80. 80. FLRSU Project Technical Challenges Area Reason Mitigation Strategy Project Execution Efficiency Project execution at multiple sites worldwide Dedicated interface engineers at subcontractors sites, detailed project execution plan and schedule Topsides Process Equipment Design (Liquefaction & Regasification) Proper process operation critical to functionality of unit Use experienced subcontractor with extensive track-record (Black & Veatch) Storage Tank Design Tank delivery significantly impacts hull fabrication schedule Use experienced subcontractor with extensive track-record (TGE) Mooring & Jetty System Mooring system must interface properly with FLSRU hull structure Although responsibility of Client, WOM to assign dedicated interface engineer FLRSU Barge Structure Fabrication Extension of WHI DSV Shipbuilding experience Experienced project management team with extensive project systems and procedures in place FLRSU Commissioning (Nantong) Proper process operation critical to functionality of unit, delays effect transportation schedule. Topsides subcontractor (Black & Veatch) to assist with equipment commissioning. Dedicated WOM Commissioning Engineering team. FLRSU Barge Transportation Long transportation route from China to Colombia, around COGH due to cargo size Use experienced subcontractor with extensive track-record. Monitor progress of Panama Canal widening project. System Installation & Final Commissioning (Colombia) Multiple project components need to be integrated together. Equipment start-up critical to client. Dedicated site Installation and Commissioning Engineering team and local Colombian service contracts for hardware, logistics and manpower. www.wison.com | www.wison-offshore.com 80 Page:80
  81. 81. Australian FLNG Barge Applications www.wison.com | www.wison-offshore.com Page:81
  82. 82. Australian Opportunities  Wison has signed an agreement with Black & Veatch to deliver FLNG barges globally.  The Australian topography and current productivity situation lends itself to near-shore Floating solutions: − Smaller environmental footprint as there is no need to carry out large civil works to prepare for an on-shore site. − Barges can be transported to site for installation on a prepared structure or sunk on the seabed as a gravity based structure. − Facility can be towed away after a prosperous service life minimising abandonment costs. − Fabrication of the facility in a controlled environment ensures completion within schedule and budget without stretching limited local labor pool further. − Compact lay-out on the floater along with storage in a hull minimizes footprint and negates the need for onshore tanks which are expensive to build and slow to permit.  Douglas Channel, Woodfibre and Kitsault have already publically disclosed barge intentions in Canada. www.wison.com | www.wison-offshore.com Page:82
  83. 83. Summary & Conclusions  The first FLNG Barge, owned and operated by EXMAR for Pacific Rubiales Energy will be installed offshore Colombia in the Caribbean Sea in 2015.  Wison’s scope in this project is FLRSU Project Management, Engineering, Procurement, Construction, Commissioning, Transportation, Installation and Start-up of the Facility.  The Caribbean FLNGis a bargebased system being fabricated in the WHI Nantong Yard. The topsides equipment will be supplied by Black & Veatch and the storage tanks and cargo handling system by TGE. www.wison.com | www.wison-offshore.com  Page:83 Barge based FLSU/FSRU systems are flexible and cost-effective, and provide an enabler for future small to mid-scale liquefaction/regasification for emerging markets (e.g., Asia, North & South America) especially in remote areas.
  84. 84. Wison Offshore & Marine Suite 24, Level 24, 77 St Georges Tce, Perth, WA. Kris Martinick – LNG Projects Development Manager Tel: +61 421 322 737 Alex Yuan – Chief Representative Tel: +61 405 150 473 www.wison.com | www.wison-offshore.com Thank You www.wison.com | www.wison-offshore.com Page:84

×