Helmi Najamuddin, PLN - Power Project Development Updates and Kalimantan's Potential in Supporting the DMO

1,078
views

Published on

delivered the presentation at IMM’s 2014 Kalimantan Coal Conference. …

delivered the presentation at IMM’s 2014 Kalimantan Coal Conference.

The IMM’s Kalimantan Coal Conference brings together 120+ senior executives, decision makers from government, mining, infrastructure, shipping and supply sectors to discuss new policies and strategies for tackling the current and emerging issues within the burgeoning Kalimantan coal sector.

For more information about the event, please visit: http://www.immevents.com/kalicoalconference13

Published in: Business, Technology

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
1,078
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
62
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Power  Project  Development  Updates  and     Kalimantan’s  Poten7al  in  Suppor7ng  the  DMO   Helmi  Najamuddin,  Head  of  Coal  Division  –    PLN,  3/Sept/2013,  ibcasia,  Balikpapan   CFPP Suralaya (1 x 625 MW) CFPP Indramayu (3 x 330 MW) CFPP Pacitan (2 x 315 MW) CFPP Kendari (2 x 10 MW) CFPP Barru (2 x 50 MW) CFPP Lontar (3 x 315 MW)CFPP Rembang (3 x 315 MW) CFPP Tj. Balai Karimun (2 x 7 MW) CFPP Labuan (2 x 300 MW)
  • 2. Table  of  Contents   1. Introduction to PLN 2. 3. Coal Business and its derivatives Coal Demand Projection for Local Use in 2013 and beyond 4. 5. 6. Power Project Updates and Coal Consumption for PLN and IPP in Sumatera Power Project Updates and Coal Consumption for PLN and IPP in Kalimantan Power Project Updates and Coal Consumption for PLN and IPP in Sulawesi and East Indonesia 7. 8. 9. Coal Price – HBA Projected Coal Caloric value Closing Remarks
  • 3. 1.    Introduc7on  to  PLN    
  • 4. Corporate  Structure                  Ministry  of  State  Owned    Enterprises  (MSOE)    Ministry  of  Energy  and  Mineral   Resources  (MEMR)     Ministry  of  Finance  (MoF)     Ministry  of  the  Environment   NaBonal  Development  Planning   Authority    (BAPPENAS)   PT  Indonesia    Comnets  Plus   TelecommunicaBons  for   the  Electricity  Sector   PT  PLN  Batubara   Coal  Supplier  for  PLN   PT  Prima  Layanan   Nasional  Enjiniring    Engineering    and   ConstrucBon  Services   PT  PLN  Tarakan   Regional  Fully  Integrated   Electric  UBlity   PT  PLN  Batam   Regional  Fully  Integrated   Electric  UBlity   PT  Indonesia  Power   Electricity  GeneraBon   Government  of  Indonesia   will  con7nue     to  hold  100%  of  PLN   PT  PLN  (Persero)   Majapahit  Holding   B.V.   Financial  InsBtuBon   Oversight   PT  PLN  Geothermal   Geothermal  Energy   GeneraBon   PT  Pembangkitan   Jawa  Bali   Electricity  GeneraBon   PT  Pelayaran   Bahtera  Adhiguna   Shipping  Ac7vi7es   Note:  Excludes  Joint  Ventures.     PT  Haleyora  Power   Electricity  Supplier  
  • 5. Subsidy  for  Opex   Margin  for  Capex   PT  PLN   (Persero)   §  INPUT:   §  Coal,  Oil  Fuel,   Gas,     §  Electricity   from  IPP,  etc.   Market   Price   Public  Service  ObligaBon   5   §  OUTPUT:   §  Electrical  Energy   to  support   economic   growth   Regulated   Price   Government  of  Indonesia  is  to  provide     Subsidy  +  Margin  =  Market  Price  –  Regulated  Price  
  • 6. 6   Who  are  we  ?   The  biggest  Indonesia’s  State  Owned  Enterprise  Company  with  USD   56  billion  Assets     Total  electrical   generaBng  capacity    :     46.01  GW  serving  48   million  customers     Of  the  total,  21.5  GW  is   CFPP  (72%  owned  by   PLN),  require    64.1   million  ton  coal  in  2013   INSTALLED  CAPACITY  PER  DECEMBER  2012  
  • 7. Total Hydro 3,123 MW Geothermal 532 MW Steam- turbine 21,500 MW Combined Cycle 9,224 MW Gas-turbine 3,226 MW Diesel 2,033 MW Others 11 MW IPP 7,360 MW TOTAL 46,009 MW Java-Bali Hydro 2,390 MW Geo 375 MW Steam- turbine 12,990 MW Combined Cycle 7,156 MW Gas turbine 2,035 MW Diesel 263 MW IPP 4,502 MW TOTAL 29,711 MW NTB Diesel 292 MW Hydro 2 MW TOTAL 294 MW NTT Diesel 218 MW Geothermal 1 MW Hydro 1 MW TOTAL 220 MW Papua Diesel 246 MW Hydro 5 MW TOTAL 251 MW Maluku Diesel other 270 MW 1 MW TOTAL 271 MW Sulawesi Hydro 220 MW Geothermal 60 MW Steam- turbine 37 MW Gas-turbine 123 MW Diesel 936 MW IPP 297 MW TOTAL 1,672 MW Kalimantan Hydro 32 MW Steam- turbine 130 MW Combined Cycle 60 MW Gas- turbine 162 MW Diesel 1,219 MW Others 6 MW IPP 56 MW TOTAL 1,665 MW Sumatera Hydro 867 MW Geothermal 0 MW Steam-turbine 1,204 MW Combined Cycle 858 MW Gas-turbine 1,057 MW Diesel 1,952 MW IPP 779 MW TOTAL 5,719 MW PLN  has  an  extensive  generaBon  poraolio  with  total  installed  capacity  of  38,649  MW  and  IPP  7,360  MW.   Extensive  GeneraBon  Network  as  per  December  2012   Sumatera   Kalimantan   Sulawesi   Maluku   Papua   NTT   NTB  Java-­‐Bali  
  • 8. 2.      Coal  Business  and  its  Deriva7ves  
  • 9. Many  Hats  in  Coal  Business   •  Miners,  Contractors   •  Sellers   •  Buyers   •  Traders   •  Heavy  Equipment  Manufacturers   •  Lawyers,  Consultants   •  Regulators  (Government)   •  Ship  Owners  /  Ship  Operators   •  Charterers   •  Bankers   •  Ship  Managers  (Tech/Comm)   •  Shipbrokers   •  Ships  agents,  Stevedores   •  Marine  Insurance  underwriters  /  Brokers   •  ……..  Etc.  
  • 10. Coal  Supply  Contracts   q What  constraints  does  PLN  have?   q   LocaBon    -­‐  Coastal  or  inland  ?    -­‐  Mine  Mouth  ?   q   TransportaBon    -­‐  Vessel,  barge,  rail,  road,  conveyor  …    -­‐  Are  there  alternaBves  in  event  of  interrupBon  ?   q   Storage  capacity   -­‐ Does  the  plant  have  stockpile  capability  ?   -­‐   How  many  days  storage  ?   PLN’s  Posi7on  
  • 11. Coal  Supply  Contracts   q What  does  PLN  want?   q   Security  of  supply    -­‐  Diversity  (More  than  one  supplier)    -­‐  Reserves    -­‐  LocaBon   q   Best  price  and  minimal  price  risk   q Consistent  quality  matching  specificaBon   q   Reliability  of  delivery   q Back-­‐up  supply  for  emergencies   q   Strong  contract       PLN’s  Posi7on  
  • 12. Coal  Supply  Contracts   q What  constraints  does  the  Seller  have?   q   LocaBon    -­‐  Access  to  market  –  infrastructure   q   Weather    -­‐  Wet  season  interrupBons    -­‐  Buffer  stockpile  capacity    -­‐  Buffer  producBon  capacity   q   TransportaBon   -­‐   Road,  conveyor,  rail   -­‐   Port  faciliBes   Seller’s  Posi7on  
  • 13. Coal  Supply  Contracts   q What  does  the  Seller  want?   q   Security  of  sales    -­‐  Long  term  contracts    -­‐  Diversity  of  customers    -­‐  Prompt  payment   q   Market  price    -­‐  Index-­‐based  adjustment   q   Unambiguous  and  business-­‐friendly  regulatory   environment   q   Strong  contract   Seller’s  Posi7on  
  • 14. 3.      Coal  Demand  Projec7on  for  PLN  &  IPP      in  2013  and  beyond  
  • 15. PLN’s  Coal  Supply  Policy   To replace oil fuel by coal in fuel mix2   To consume Low Rank Coal: abundant resource in Indonesia (40.4% LRC, 49.9% MRC, 9.7% HRC) 3   To increase coal quality: Clean Coal Technologies 4   To strengthen security of coal supply by : ü Long term supply contract 1  
  • 16. Fuel  Mix  2005-­‐2019  :  Coal  share  to  be  increased   16   LNG   Geothermal   Hydropower   Natural  Gas     Coal   Oil  
  • 17. Fuel  Mix   Hydro   1 7 Year Fuel Oil GAS LNG COAL (10^9 litre) (bcf) (bcf) (10^6 ton) 2011 11.45 329.8 0.0 41.8 2012 7.56 337.8 59.6 53.2 Coal  
  • 18. 4.8   14.8   18.2   24.7   33.8   38.9   16.2   24.5   25.3   35.0   35.0   35.9   2.9   2.6   6.3   6.6   7.8   7.8   35.8   50.4   53.1   66.3   76.6   82.6   23.8   41.9   49.7   2010   2011   2012   2013   2014   2015   4000  -­‐  4500  kCal/kg   4501  -­‐  5500  kCal/kg   >  5500  kCal/kg   Target   Total  Consump7on   Coal  Demand  by  PLN  +  PLN’s  Sub  +  IPP,  2010-­‐2015   RealizaBon   EsBmaBon   *million  tonnes   LRC Increased by 600% in 6 year
  • 19. Coal  Demand,  Coal  Contracted  and   Coal  Power  Plant  Capacity:  PLN+PLN’s  Sub  +  IPP    66.3      76.6      82.6      88.1      96.8      85.2      85.5      85.5      85.6      85.6      21.5      24.2      25.1      28.5      29.6     0   5   10   15   20   25   30   35   0   20   40   60   80   100   120   2013   2014   2015   2016   2017   GW  Million  Ton   Demand   Contracted   Capacity  
  • 20. Coal  ConsumpBon  Guidance   By  PLN  +  PLN’s  Subsidiary  +  IPP    14.6      21.6      20.2      27.0      26.7      26.8      29.6      28.5      13.6      13.6      13.6      13.6      13.6      13.6      13.6      13.6      24.9      31.1      42.9      42.1      47.9      56.4      65.8      74.6      53.1      66.3      76.6      82.6      88.1      96.8      109.1      116.7      -­‐      20.0      40.0      60.0      80.0      100.0      120.0      140.0     2012   2013   2014   2015   2016   2017   2018   2019   Million  Tonnes   IPP   PLN's  Subsidiary   PLN   Total  
  • 21. Jan   s/d  Feb   s/d  Mar   s/d  Apr   s/d  May   s/d  Jun   s/d  Jul   s/d  Aug   s/d  Sep   s/d  Okt   s/d  Nov   s/d  Des   Rencana   4.35   8.59   13.04   17.48   21.93   26.38   31.07   35.86   40.46   44.69   48.91   53.14   Realisasi   3.89   7.77   11.79   15.93   20.4   24.82   29.64   33.74   38.12   42.99   46.35   49.71   0   10   20   30   40   50   60   Million  Tonnes   Planning  and  RealizaBon  of  Coal  ConsumpBon     PLN+PLN’s  Sub  +  IPP  in  2012    (cumulaBve)   Total  Target                                                        :  53,1      Milion  ton   Total  RealizaBon  up  to  Dec          :  49,71  Milion  Ton  
  • 22. Planning  and  RealizaBon  of  Coal  ConsumpBon   PLN  +  PLN’s  Sub  +  IPP  in  2013   (cumulaBve)   Total  Target  up  to  Dec  :    66,3  Million  ton   Total  RealizaBon  up  to  July  :  31,1  Million  ton  
  • 23. Total  Supply  up  to  July  2013    :    31,10  Million  ton   RealizaBon  Coal  Supply  by  Suppliers   PLN  +  PLN’s  Sub  +  IPP  in  2013  
  • 24. 4.  Power  Project  Development  Updates     and  Coal  Consump7on  for  PLN  and  IPP  in  Sumatera    
  • 25. LocaBon  of  Coal  Supplier  for  PLN   LEGEND:   1.  PT  Lanna  Harita  Indonesia  (LHI)    Kutai  –  East  Borneo   2.  PT  Kideco  Jaya  Agung  (KJA)      Pasir  –  East  Borneo   3.    PT  Oktasan  Baruna  Persada  (OBP)   Kotabara  –  South  Borneo   4.  PT  Arutmin  Indonesia  (PT  AI)      Satui  –  South  Borneo   5.      PT  Exploitasi  Energi  Indonesia  (PT    EEI)Tapin  –  South  Borneo   6.    PT  Rizki  Anugrah  Pratama  (PT  RAP)    Tapin  –  South  Borneo   7.    PT  Dwi  Guna  Laksana  (PT  DGL)    Banjar  –  South  Borneo   8.    PT  Kasih  Industri  Indonesia  (PT  KII)    Barito  Timur  –  South  Borneo    Tebo  -­‐  Jambi   9.    PT  Titan  Mining  Energy    (PT  TME)    Kutai  –  East  Borneo   10.  PT  Hanson  Energy  (PT  HE)    Ogan  Komering  Ulu,  South  Sumatera   11.  PT  Bukit  Asam  (PT  BA)    Tanjung  Enim,  South  Sumatera   12.  PT  Golden  Great  Borneo    (PT  GGB)    Lahat,  South  Sumatera   13.  PT  Kal7m  Prima  Coal  (PT  KPC)    Sanggata,  South  Borneo   14. PT  Adaro  Indonesia    Kelanis,  South  Borneo   1 2 3 4 5 6 7 8 9 10   11   12   8   13   14  
  • 26. Outlook  For  PLN  &  IPP  Coal   ConsumpBon  in  Sumatera   Aceh   North  Sumatra   Riau   West  Sumatra   Jambi   Riau  Archipelago   South  Sumatra   Lampung   Bangka   Belitung   Nagan  Raya   2x110  MW   CC  :  560.000  MT   Lab.  Angin   2x115  MW   CC  :  786.000  MT   Ombilin  (MRC)   2x100  MW   CC  :  740.000  MT   Teluk  Sirih   2x112  MW   CC  :  764.000  MT   Simp  Blimbing  (IPP)   2x100  MW   CC  :  740.000  MT   Tarahan  &  New  Tarahan   4x100  MW   CC  :  1.480.000  MT   Tj.  Kasam  (IPP)   2x55  MW   CC  :  463.000  MT   Bukit  Asam  (MRC)   4x65  MW   CC  :  1.380.000  MT   Tj.  Balai  Karimun   2x7  MW   COD  :  Maret  2014   Pangkalan  Susu     2x200  MW   COD  :  Maret  2014   Bangka  Baru     2x30  MW   CC  :  171.000  MT   Belitung     2x16,5  MW   COD  :  Juli  2014   Tenayan   2x100  MW   COD  :  Juli  2014   In  Opera7on   Construc7on   Mine  Mouth  Power   Plants   CC  :  4000  MT/MW   CC          :  Coal  ConsumpBon  per  Year   COD    :  EsBmated  Commercial     OperaBon  Date   MRC  :  5000  kCal/kg  (GAR)  
  • 27. Coal  Supplier  to  Each  Power  Plants   Aceh   North  Sumatra   Riau   West  Sumatra   Jambi   Riau  Archipelago   South  Sumatra   Lampung   Bangka   Belitung   Nagan  Raya      CS  :  PLN  BB,   BBSN  &  EBL   Lab.  Angin   CS  :  PTBA,   KII   Ombilin  (MRC)   CS  :  PLN  BB,   PTBA,  Local     Teluk  Sirih   CS  :  PLN  BB,  HE,   BBSN  &  EBL   Simp  Blimbing  (IPP)   Locals   Tarahan  &  New  Tarahan   CS  :  PLN  BB,  HE,  PTBA,     KUB  &  DBS   Tj.  Kasam  (IPP)   CS  :  PLN  BB,  KJA   Bukit  Asam  (MRC)   CS  :  PTBA   Tj.  Balai  Karimun   CS  :  PLN  BB,  KUB  &   DBS   Pangkalan  Susu     CS  :  PLN  BB,  HE   Bangka  Baru     CS  :  PLN  BB,  BBSN   &  EBL.   Belitung     CS  :  PLN  BB,  BBSN   &  EBL   Tenayan   2x100  MW   COD  :  Juli  2014   In  Opera7on   Construc7on   Mine  Mouth  Power   Plants   CC  :  4000  MT/MW   CS          :  Coal  Suppliers   PLN  BB  :  PLN  Batubara   PTBA  :  PT  Bukit  Asam   BBSN  &  EBL  :  Kons.  Batara  Batari  Sinergi  Nusantara  &  Energi  Batubara  Lestari   KUB  &  DBS  :  Kons.  Karya  Utama  Banua  &  Daya  Bambu  Sejahtera   KII  :  PT  Kasih  Industri  Indonesia   KJA  :  PT  Kideco  Jaya  Agung  
  • 28. Existing and Future Projects of Mine-mouth PP in Sumatra Ready for Tender = 2,600 MW No   Project  Name   Capacity   Status   COD   1   Bukit  Asam   4  x  65  MW   PLN,  Exis7ng   1987   2   Ombilin   2  x  100  MW   PLN,  Exis7ng   1996   3   Simpang  Belimbing   2  x  113.5  MW   IPP,  Exis7ng   2011-­‐2012   4   Sumsel  5   2  x  150  MW   IPP,  Construc7on   2016  -­‐  2017   5   Sumsel  6   2  x  300  MW   IPP,  Abort   -­‐   6   Sumsel  7   2  x  150  MW   IPP,  PPA  (Financing)   2017  –  2018   7   Sumsel  8   2  x  600  MW   IPP,  PPA  (Financing)   2017  –  2018   8   Riau   2  x  300  MW   IPP,  Abort  (No  Price  Agreement)   -­‐   9   Banjarsari   2  x  110  MW   IPP,  Construc7on   2015  -­‐  2016   10   Keban  Agung   2  x  120  MW   IPP,  Construc7on   2015  -­‐  2016   11   Jambi   2  x  400  MW   IPP,  Pre-­‐FS   2019  -­‐  2020   12   Sumsel    9   2  x  600  MW   IPP,  BidDoc  issued  on  2  Aug  2013   2018  –  2019   13   Sumsel  10   1  x  600  MW   IPP,  BidDoc  issued  on  2  Aug  2013   2018  –  2019   Total   6,747  MW  
  • 29. q Sumsel-­‐8:    2  x  600  MW,  2016   q Sumsel-­‐9:      2  x  600  MW,  2017   q Sumsel-­‐10:    1  x  600  MW,  2018   Muara  Enim   Mine Mouth Power Plants, using Low Rank Coal X  Bogor   Converter   q  The purpose of Sumsel 8, 9& 10 is to supply Jawa- Bali System q  PLN is responsible to develop T/L HVDC 500 kV line of about 520 kmr (“HVDC”) q  The HVDC project will be financed by JICA q  Project cost of the HVDC is about USD 2,3 billions to transfer power of about 3,000 MW
  • 30. 5.  Power  Project  Development  Updates      -­‐  Coal  Consump7on  for  PLN  and  IPP  in  Kalimantan    
  • 31. Outlook  For  PLN  &  IPP  Coal   ConsumpBon  in  Kalimantan  2014   Asam-­‐asam  &  New   Asam  -­‐  asam   4  x  55  MW   CC  :  926.000  MT   Embalut  (IPP)   2  x  112,5  MW   CC  :  786.000  MT   Pangkalan  Bun  (IPP)   2  x  6  MW   CC  :  64.000  MT   Pulang  Pisau   2  x  60  MW   COD  :  Jul  -­‐  14   Sanggau   2  x  7  MW   COD  :  Jan  -­‐  14   Kal7m     2  x  110  MW   COD  :  Oct  -­‐  14   Berau   2  x  7  MW   COD  :  Aug  -­‐  14   PLTGB  Putussibau  (IPP)   1  x  8  MW   COD  :  Mar  -­‐  14   Tanah  Grogot  (IPP)   2  x  7  MW   COD  :  Oct  -­‐  14   In  Opera7on   Construc7on   CC          :  Coal  ConsumpBon   COD:  Commercial  OperaBon  date  
  • 32. Coal  Supplier  to  Each  Power  Plants   Asam-­‐asam  &  New   Asam  -­‐  asam   4  x  55  MW   CS  :  PLN  BB,  Arutmin   Embalut  (IPP)   2  x  112,5  MW   CS  :  PLN  BB,  Locals   Pangkalan  Bun  (IPP)   2  x  6  MW   CS  :  Kons.  Cenko   Pulang  Pisau   2  x  60  MW   COD  :  Jul  -­‐  14   Sanggau   2  x  7  MW   COD  :  Jan  -­‐  14   Kal7m     2  x  110  MW   COD  :  Okt  -­‐  14   Berau   2  x  7  MW   COD  :  Agt  -­‐  14   PLTGB  Putussibau  (IPP)   1  x  8  MW   COD  :  Mar  -­‐  14   Tanah  Grogot  (IPP)   2  x  7  MW   COD  :  Okt  -­‐  14   CS          :  Coal  Suppliers   PLN  BB  :  PLN  Batubara   In  Opera7on   Construc7on  
  • 33. 6.  Power  Project  Development  Updates     -­‐  Coal  Consump7on  for  PLN  and  IPP     in  Sulawesi  and  East  Indonesia    
  • 34. Outlook  For  PLN  &  IPP  Coal  ConsumpBon  in  East   Indonesia  2014   Amurang   2x25  MW   CC  :  160.000  MT   Tawaeli  IPP   2x15  MW   CC  :  120.000  MT   Jeneponto  IPP   2x125  MW   CC  :  1.000.000  MT   Barru   2x50  MW   CC  :  340.000  MT   Kendari   2x10  MW   CC  :  100.000  MT   Ropa   2x7  MW   COD:  Jul-­‐14   Endog  &     Jiranjang  APBN   3x25  MW   CC  :  240.000  MT   Bima   2x10  MW   COD  :  Apr-­‐14   Kupang   2x16,5  MW   COD  :  Jul-­‐14   Ternate/Tidore   2x7  MW   COD  :  Apr-­‐14   Atambua   4x6  MW   COD  :  Sep-­‐14   Ambon   2x15  MW   COD  :  Des-­‐14   Sofifi   2x3  MW   COD  :  Agt-­‐14   Jayapura   2x10  MW   COD  :  Des-­‐14   Timika   4x7  MW   COD  :  Jul-­‐14   In  Opera7on   Construc7on   CC          :  Coal  ConsumpBon  per  Year   COD    :  EsBmated  Commercial  OperaBon  Date  
  • 35. Coal  Supplier  to  Each  Power  Plants   Amurang   2x25  MW   CS  :  PLN  BB,  DGL,   OBP   Tawaeli  IPP   2x15  MW   CS  :  PLN  BB   Jeneponto  IPP   2x125  MW   CS  :  PLN  BB,  ADARO,   KIDECO,  SSP   Barru   2x50  MW   CS  :  PLN  BB,  DGL   OBP   Kendari   2x10  MW   CS  :  PLN  BB,  DGL,   OBP  Ropa   2x7  MW   COD:  Jul-­‐14   Endog  &     Jiranjang  APBN   3x25  MW   CS  :  PLN  BB,  DGL,   OBP,  RAP   Bima   2x10  MW   COD  :  Apr-­‐14   Kupang   2x16,5  MW   COD  :  Jul-­‐14   Ternate/Tidore   2x7  MW   COD  :  Apr-­‐14   Atambua   4x6  MW   COD  :  Sep-­‐14   Ambon   2x15  MW   COD  :  Des-­‐14   Sofifi   2x3  MW   COD  :  Agt-­‐14   Jayapura   2x10  MW   COD  :  Des-­‐14   Timika   4x7  MW   COD  :  Jul-­‐14   In  Opera7on   Construc7on   COD    :  EsBmated  Commercial  OperaBon  Date   CS          :  Coal  Suppliers   PLN  BB  :  PLN  Batubara   DGL  :  Dwi  Guna  Laksana   OBP  :  Oktasan  Baruna  Persada   RAP  :  Rizki  Anugrah  Pratama   SSP  :  Sumber  Suryadaya  Prima  
  • 36. 7.      Coal  Price  -­‐  HBA  
  • 37. Weighted  Average  Coal  Price  Purchased  by  PLN   Rp/kg    219.75      230.82      230.75      251.55      335.81      338.76      489.23      732.32      659.71      695      702      618      -­‐      100      200      300      400      500      600      700      800     2002   2003   2004   2005   2006   2007   2008   2009   2010   2011   2012   2013  
  • 38. 8.    Projected  Coal  Caloric  Value  
  • 39. Projected  Coal  Caloric  Value  Trends  in   Indonesia   4800   4900   5000   5100   5200   5300   5400   5500   5600   5700   5800   2011   2012   2013   2014   2015   2016   2017   2018   2019   2020   CV  (adb)   Year   Average  Weighted  CV  2011-­‐2020   Source  :  Terry  Gray,  PT  Britmindo,  IHS  McCloskey  December  2012  
  • 40. 9.    Closing  Remarks  
  • 41. 1.  Indonesia  electricity  demand  is  sBll  high  (9.4%  per  year)  thus  need   a  huge  addiBonal  capacity  of  generaBon,  transmission  and   distribuBon.   2.  For  the  next  10  years,  the  electricity  supply  in  Indonesia  is  sBll   relying  on  CFPP  (Coal  Power  Plant)  including  Mine  Mouth  PP,  it  is   because  the  availability  of  coal  abundant  as  primary  energy  and   cost  of  producBon  is  relaBvely  cheap  compare  others  power   generaBon,  but  sBll  taking  into  account  of  environmental  sounds.   3.  PLN  is  the  biggest  coal  buyer  in  Indonesia  i.e.:  66.3  million  Ton      in   2013,  and      >100  million  Ton/year  aqer  2018   CONCLUSION  -­‐  1  
  • 42. 4.  Coal  Opportunity  businesses  in  Indonesia:     •  Local  coal  mining  closest  to  each  Power  Plant  locaBon,   •  Coal  Up  grading  of  Clean  Coal  Technologies,   •  And  related  businesses.   CONCLUSION  -­‐  2  
  • 43. Further contact : helminajamuddin@pln.co.id