Barry Holden, Port of Townsville: The Port Expansion Project - Townsville

768 views
555 views

Published on

Barry Holden, CEO, Port of Townsville delivered this presentation at the 2012 Regional Ports conference in Perth/Australia. showcase the latest port developments and assess the policy, planning and operating strategies designed to maximise the efficiency of Australia's regional ports: gateways for facilitating trade, engagement and regional growth. For more information, please visit www.informa.com.au/regionalports13

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
768
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
16
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Barry Holden, Port of Townsville: The Port Expansion Project - Townsville

  1. 1. 18/06/2012 Port Expansion Project Regional Ports Conference 28 June, 2012 PORT OF TOWNSVILLE LIMITED: SUMMARY Snapshot of the Port of Townsville Growth Projections Projects under way – Townsville Port Inner Harbour Expansion • Berth 8 Upgrade • Berth 10 Reconstruction Projects Proposed – Port Expansion Project • Berth 12 • Berths 14 – 19 Landside Infrastructure • Townsville Port Access Road • Eastern Access Rail • Townsville State Development Area Logistics Chain Coordination 1
  2. 2. 18/06/2012 Current Berth Activities Berth 11 Berth 2 Berth 1 Berth 3 Berth 10 Berth 9 Berth 4 Berth 8 Berth 7 2
  3. 3. 18/06/2012 PORT OF TOWNSVILLE LIMITED: TRADE PERFORMANCE and OUTLOOK (high growth) 70 60 Tonnes (Millions) 50 40 30 20 10 - Low Growth Bulk Project/s Capacity - Do Nothing Capacity - Enhancements MAJOR PROJECTS: BERTH 8 and BERTH 10A 3
  4. 4. 18/06/2012 MAJOR PROJECTS: BERTH 10 Terminal Building 4
  5. 5. 18/06/2012 MAJOR PROJECTS: BERTH 10 B & C Stages B and C Stage A 5
  6. 6. 18/06/2012 MAJOR PROJECTS: BERTH 12 Current Berth 11 Proposed Berth 12 6
  7. 7. 18/06/2012 MAJOR PROJECTS: PORT EXPANSION PROJECT 7
  8. 8. 18/06/2012 Port of Townsville - 2040 PORT OF TOWNSVILLE LIMITED: TOWNSVILLE STATE DEVELOPMENT AREA • The TSDA covers about 4,900 hectares and includes the Stuart Industrial Area and the Townsville Port Access Road. • An area with a number of potential port-related uses. • Investigations underway into how to best utilise the asset. • Development of the area would enable future port activity to move away from urban environments. 8
  9. 9. 18/06/2012 Thank you! 9

×