Your SlideShare is downloading. ×
Planning station environs_proposed_future_slides
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Planning station environs_proposed_future_slides

389
views

Published on

Inchicore on Track's presentation at the ABP Oral Hearing in March 2011, in relation to the Dart Underground coming Above ground in Inchicore. Chapter 3: Planning, Station and Environs and Proposed …

Inchicore on Track's presentation at the ABP Oral Hearing in March 2011, in relation to the Dart Underground coming Above ground in Inchicore. Chapter 3: Planning, Station and Environs and Proposed Future Development


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
389
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Planning, Station and Environs and Future Development
  • 2. A Community Under Threat
    • Quiet and Green
    • Integrated with the Railway Works
    • A Cul-de-sac threatened by greater permeability and proposed future development of the Railway Works
  • 3. A Community Under Threat
    • Future Development: the Railway Works Site is Twice the Size of Temple Bar, similar to the Docklands
  • 4. A Community Under Threat
    • The community needs to be a participating stakeholder in any future development
  • 5. CIE’s History of Neglect and Failure to Plan
    • Section 43(1) , Transport (Railway Infrastructure) Act 2001 as amended by the Planning and Development, (Strategic Infrastructure) Act 2006, sets out matters Bord Pleanála is required to consider before deciding whether to grant the order
    • These include: ‘the likely consequence for proper planning and sustainable development in the area in which it is proposed to carry out the Railway Works and for the environment of such works.’(s. 43(1)(g)).
  • 6. CIE’s History of Neglect and Failure to Plan
    • Experience of the Third Track Works and Reinstatement
  • 7. Poor Reinstatement
  • 8. Permanent Way Compound and Fenced-off Areas
  • 9. Then
  • 10. Now
  • 11. Proposed Station
    • Demolition of Historic Buildings
  • 12. Proposed Station: Access
  • 13. Proposed Station: Access
  • 14. Proposed Station: Access
  • 15. A Terminus Station Image of station with dotted lines for provision of tie in to Kildare Route Project
  • 16. Implications for the Railway Estate: Anti-Social Behaviour Image of station with dotted lines for provision of tie in to Kildare Route Project
  • 17. Economic and Social Impact Image of Davitt Road Rubble
  • 18. Economic and Social Impact Image of empty shopfronts in Inchicore
  • 19. Economic and Social Impact Image of empty shopfronts in Inchicore
  • 20. Economic and Social Impact: Proposed Future Development Image of empty shopfronts in Inchicore
  • 21. A Vision