Inchicore On Track <ul><li>Dart Underground and the Oral Hearing </li></ul><ul><li>Major impacts and great change </li></u...
Contents <ul><li>Who We Are  </li></ul><ul><li>Consultation & Participation </li></ul><ul><li>Planning, Station and Enviro...
Upcoming SlideShare
Loading in …5
×

Introduction slides

1,201 views
1,150 views

Published on

Inchicore on Track's presentation at the ABP Oral Hearing in March 2011, in relation to the Dart Underground coming Above ground in Inchicore. Introduction

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,201
On SlideShare
0
From Embeds
0
Number of Embeds
185
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Introduction slides

  1. 2. Inchicore On Track <ul><li>Dart Underground and the Oral Hearing </li></ul><ul><li>Major impacts and great change </li></ul><ul><li>Hasty Proposal </li></ul><ul><li>Insufficient Detail – Quality Compromised </li></ul><ul><li>Displacement of Responsibility </li></ul><ul><li>Time - is now on our side </li></ul>
  2. 3. Contents <ul><li>Who We Are </li></ul><ul><li>Consultation & Participation </li></ul><ul><li>Planning, Station and Environs and Proposed Future Development </li></ul><ul><li>Design, Architecture & Heritage </li></ul><ul><li>Construction and Operational Impacts & Issues </li></ul><ul><li>OTB Engineering </li></ul><ul><li>Community Gain and Corporate Social Responsibility </li></ul><ul><li>Conditions, Modifications and Improvements to the Railway Order </li></ul><ul><li>Conclusion to Oral Submission </li></ul>

×