• Like
  • Save
Intervento Alessio Battistella per IN/ARCH
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

Intervento Alessio Battistella per IN/ARCH

  • 140 views
Published

International Scientific Conference …

International Scientific Conference
<< Modern city: modernization of territory and territory of modernization as the part of the festival "Days of Europe in Ekaterinburg" >>

Published in Education , Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
140
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. MILANO CURRENT PROJECTSTOWARDS A NEW CITYMILANO ONGOING PROJECTSTOWARDS A NEW CITY
  • 2. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/Galleria Vittorio Emanuele IIMilan
  • 3. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/POLAR CITYCENTRAL STRUCTUREThe growth of Milan around its center
  • 4. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/POLAR CITYCENTRAL STRUCTUREMilano Forma UrbisMunicipality of Milan, 1990
  • 5. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/PGTTHE MULTIPOLAR CITYThe new PGT - Piano di Governo delTerritorio (Governmental Territorial Plan)- november 2012)88 NIL - Nuclei di Identità Locale(Nuclei of Local Identity)
  • 6. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/NIL - Nuclei di Identità LocaliThe map of local servicesPGT
  • 7. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THE SLOW CITY- Quality of living- Local services- Sweet mobilityPGTCittà Lenta: qualità dell’abitare, servizi a scala locale, mobilità dolce e capillare
  • 8. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/TOWARDS A NEW URBAN FORMempty spaces constructed spacesTOWARDS ANEW ECOLOGYConsidering the empty public spacesbeyond the traditional figures of publicspaces
  • 9. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THE FAST CITYPGTThe infrastructure of the fast city:the city of the flow lines linked to thedynamics of labor, local facilitiec andinternational connections
  • 10. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THE FAST CITYThe nodes of the fast cityPGT
  • 11. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THE GREEN RING- Urban agriculture- Environmental recovery- Water systems recoveryTOWARDS ANEW ECOLOGY
  • 12. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THE GREEN RAYS- 50% of green in the new transformationareas- Reinforce the cycling and walking routes- Promote a slow city- Zero consumption of groundTOWARDS ANEW ECOLOGY
  • 13. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THE GREEN RAYS8 radial paths characterized by slow, localmoving. A continuous and protected pathto walk, run, cycle.Creation of new green areas andimproving of the existing ones.TOWARDS ANEW ECOLOGYRay 7 - Parco SempioneRay 2 - Giardini di Porta Venezia
  • 14. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/TOWARDS ANEW ECOLOGYTransformation areasGreen ringGreen rays
  • 15. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/RECENTPROJECTS1_ Porta Nuova2_ City Life3_ Portello4_ Gasometri Bovisa5_ Maciachini6_ Grande Bicocca7_ Santa Giulia8_9_ Fiera Rho10_ EXPO site 2015123456789 10Complesso Assago-Milanofiori
  • 16. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/RECENTPROJECTS1_ Porta Nuova2_ City Life3_ Portello4_ Gasometri Bovisa5_ Maciachini6_ Grande Bicocca7_ Santa Giulia8_9_ Fiera Rho10_ EXPO site 20154 million m² of transformation76154109823Complesso Assago-Milanofiori
  • 17. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5THE CHANGING MILANAn itinerary through the newurban transformationsTHROUGH
  • 18. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/La BicoccaMetro 5METRO 5La BicoccaTHROUGH
  • 19. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5La BicoccaThe site before the transformation projectTHROUGH
  • 20. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5La BicoccaThe transformation projectDelivery date: end of 2005300.000 m² of public areasTHROUGH
  • 21. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5La BicoccaTHROUGH
  • 22. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5La BicoccaThe cherry hillTHROUGH
  • 23. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5La BicoccaArch. Vittorio GregottiTHROUGH
  • 24. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5La BicoccaArch. Vittorio GregottiTHROUGH
  • 25. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaPorta NuovaMetro 5Metro 2THROUGH
  • 26. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaThe site before the transformation projectTHROUGH
  • 27. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaThe site before the transformation projectTHROUGH
  • 28. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaThe site before the transformation projectTHROUGH
  • 29. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaThe transformation projectmore than 160.000 m² of public areas3.720 parking places6 different mixed functionsLeed certification on progressTHROUGH
  • 30. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaThe transformation projectTHROUGH
  • 31. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaThe fast cityTHROUGH
  • 32. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaThe slow cityTHROUGH
  • 33. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaUnicredit Tower - Arch. Cesar PelliTHROUGH
  • 34. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaOffices and Show room - PiùarchTHROUGH
  • 35. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaOffices and residences - Munoz + AlbinTHROUGH
  • 36. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaResidences Bosco Verticale -Boeri StudioTHROUGH
  • 37. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaResidences Bosco Verticale -Boeri StudioTHROUGH
  • 38. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaPiazza Gae AulentiTHROUGH
  • 39. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaPiazza Gae AulentiTHROUGH
  • 40. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5Porta NuovaPiazza Aulenti entrance fromGaribaldi StationTHROUGH
  • 41. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5City LifeCity LifeMetro 5Metro 1THROUGH
  • 42. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5City LifeThe site before the transformation project- Sample’s marketTHROUGH
  • 43. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5City LifeThe site before the transformation projectTHROUGH
  • 44. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5City LifeThe transformation project170.000 m² of public areasClass A buildings (the higher italiancategory for not passive buildings)5 residence blocksTHROUGH
  • 45. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5City LifeArch. Zaha HadidArch. Daniel LibeskindArch. Arata IsozakiTHROUGH
  • 46. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/METRO 5City LifeResidences - Arch. Zaha HadidTHROUGH
  • 47. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THROUGHMETRO 5PortelloPortelloMetro 5
  • 48. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THROUGHMETRO 5PortelloThe site before the transformation project- Alfa Romeo Industries
  • 49. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THROUGHMETRO 5PortelloThe site before the transformation project- Alfa Romeo Industries
  • 50. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THROUGHMETRO 5PortelloThe transformation project70.000 m² of public areas50.000 m² of offices and shops
  • 51. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THROUGHMETRO 5PortelloResidences - Arch. Cino Zucchi
  • 52. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THROUGHMETRO 5PortelloBusiness Center - Arch. Gino Valle
  • 53. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THROUGHMETRO 5PortelloResidence Bosco Verticale -Arch. Charles Jenks and Andreas KiparStudio Land
  • 54. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/DEVELOPMENTOF A NEW URBANSPACEABITARE MILANO:PUBLIC HOUSINGVia Gallarate, Arch. Massimo Basile
  • 55. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/DEVELOPMENTOF A NEW URBANSPACEABITARE MILANO:PUBLIC HOUSINGVia Civitavecchia, Arch. Lorenzo Consalez
  • 56. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/DEVELOPMENTOF A NEW URBANSPACEABITARE MILANO:PUBLIC HOUSINGVia Senigallia, Arch. Remo Dorigati
  • 57. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/DEVELOPMENTOF A NEW URBANSPACEINTERVENTIONS ONTHE GREEN RAYEx Osram Area - Algarotti, Besozzi
  • 58. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/DEVELOPMENTOF A NEW URBANSPACEINTERVENTIONS ONTHE GREEN RAYEx Osram Area - Algarotti, BesozziBefore the intervention
  • 59. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/DEVELOPMENTOF A NEW URBANSPACEINTERVENTIONS ONTHE GREEN RAYEx Osram Area - Algarotti, BesozziAfter the intervention
  • 60. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/DEVELOPMENTOF A NEW URBANSPACEINTERVENTIONS ONTHE GREEN RAYEx Loro Parisini - Bugatti, CoppiBefore the intervention
  • 61. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/DEVELOPMENTOF A NEW URBANSPACEINTERVENTIONS ONTHE GREEN RAYEx Loro Parisini - Bugatti, CoppiAfter the intervention
  • 62. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/EXPO 2015 SITEMain axis: 1,5kmMore than 150.000 m² of pavillions69 countries already confirmed20.000.000 extimated visitors250.000 extimated visitors per day60% reaching the place by public means
  • 63. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/THE LANDSCAPETechnological and architectonic monumentalityAttention to the landscape and to the open common areasOffer the visitor a physical experience
  • 64. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/EXPO 2015HERITAGERESEARCH CENTERLast February The EXPO SpA signed anagreement with the Italian Ministery ofEnvironment for the construction of theINTERNATIONAL CENTER FOOD ANDENVIRONMENT SECURITY (CF&E)This research center is one of the projectsthat aim to leave important resources afterthe EXPO will end. This approuch is oneof the strongest and more important of thiseventGeneral purposes of the agreement- Balance of the CO2 emissions that the event is going to produce in preparation and realization phases (carbn foot printing)- Promote pilot projects in developing counties, with the purpose of spreading culture of food and environmental health- realize during the EXPO an archive of best practices for the sustainable and integrated use of natural, energetic and food resources.
  • 65. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/EXPO 2015HERITAGEDIGITAL INFRASTRUCTURE11 services related to infomobility6 services in the field of transportBased on the need to create an open environment that supports and enablescooperation amongst the participants, to initiate the creation of a Smart Cityand enable an authentic Digital Society, the main objectives are:Facilitate the connection between the participantsFacilitate and promote interoperability and integration of services andapplications developed.Make the fruition of the event easier to enhance the visitors’ enjoyment of the“off-site” services and increase their overall level of satisfaction.To propose an operational approach aimed at co-operation of those involvedwhilst respecting the diversity of business models and marketing strategies.CITYPEOPLE
  • 66. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONEXPO 2015ARCHITECTONIC FACILITIES AND RELATEDTEAM:HEAD DESIGNER:YEAR:ARCò - ARCHITECTURE AND COOPERATIONE PLUS STUDIOMADE ASSOCIATIMETAMORPHOSYSU-BOOTAlessio Batistella - ARCò2012
  • 67. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGSSHOPRESTAURANT+BBBBBBAAAAAA+++++++++MODULESAGGREGATIONDEFINITION OFFUNCTIONSTHE AGGREGATION SYSTEM ALLOWS TO ADAPT THEPROJECT TO THE DIFFERENT CONFIGURATIONSREQUIRED BY THE FUNCTIONAL PROGRAMFLEXIBILITYMODULEAMODULEBGENERAL STRATEGIES
  • 68. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGS3,605,705,70 15,00moduloAmoduloAmoduloAmoduloB5,70MODULARITA’construction systembaloon framemoduloAmoduloAmoduloAmoduloBARCHETIPO - CASA RURALEMODULARITA’sistema costruttivobaloon framesuperficifotovoltaichecascinaRICERCA DEL GIUSTO ORIENTAMENTO3,605,705,70 15,00moduloAmoduloAmoduloAmoduloB5,70ARCHETIPO - CASA RURALEMODULARITA’sistema costruttivobaloon frameenergyharvestingsurfacescascinaFIND THE RIGHT EXPOSURESUSTAINABILITY MODULESARCHETYPEProspettoINFOPOINscala 1:205.703.605.705.703.605.703.603.603.605.705.705.705.705.705.703.605.703.605.70 8.607882 22962410 10 1022211141110 10bbaabbARCHETYPE SUSTAINABILITYGENERAL STRATEGIESFLOORPLANMODULES
  • 69. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGS010406 070810 11090502 03FoundationSecond baloon frameThird baloon frameFirst baloon frame’spillars-Closing beamsfor roof and floorClosing beamsfor roof and floor andcross bracing systemFirst baloon frame’scrossbeamsFloors pluggingRoof plugging Greenroof plantationAssembly of prefab straw bales01 FoundationCONSTRUCTION KIT
  • 70. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGS010406 070810 11090502 03FoundationSecond baloon frameThird baloon frameFirst baloon frame’spillars-Closing beamsfor roof and floorClosing beamsfor roof and floor andcross bracing systemFirst baloon frame’scrossbeamsFloors pluggingRoof plugging Greenroof plantationAssembly of prefab straw bales02 First baloon frame’spillars-CONSTRUCTION KIT
  • 71. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGS010406 070810 11090502 03FoundationSecond baloon frameThird baloon frameFirst baloon frame’spillars-Closing beamsfor roof and floorClosing beamsfor roof and floor andcross bracing systemFirst baloon frame’scrossbeamsFloors pluggingRoof plugging Greenroof plantationAssembly of prefab straw bales03First baloon frame’spillarsFirst baloon frame’scrossbeamsCONSTRUCTION KIT
  • 72. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGS010406 070810 11090502 03FoundationSecond baloon frameThird baloon frameFirst baloon frame’spillars-Closing beamsfor roof and floorClosing beamsfor roof and floor andcross bracing systemFirst baloon frame’scrossbeamsFloors pluggingRoof plugging Greenroof plantationAssembly of prefab straw bales04 Second baloon frameCONSTRUCTION KIT
  • 73. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGS010406 070810 11090502 03FoundationSecond baloon frameThird baloon frameFirst baloon frame’spillars-Closing beamsfor roof and floorClosing beamsfor roof and floor andcross bracing systemFirst baloon frame’scrossbeamsFloors pluggingRoof plugging Greenroof plantationAssembly of prefab straw bales05Second baloon frame Closing beamsfor roof and floorCONSTRUCTION KIT
  • 74. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGS010406 070810 11090502 03FoundationSecond baloon frameThird baloon frameFirst baloon frame’spillars-Closing beamsfor roof and floorClosing beamsfor roof and floor andcross bracing systemFirst baloon frame’scrossbeamsFloors pluggingRoof plugging Greenroof plantationAssembly of prefab straw bales06 Third baloon frameCONSTRUCTION KIT
  • 75. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGS010406 070810 11090502 03FoundationSecond baloon frameThird baloon frameFirst baloon frame’spillars-Closing beamsfor roof and floorClosing beamsfor roof and floor andcross bracing systemFirst baloon frame’scrossbeamsFloors pluggingRoof plugging Greenroof plantationAssembly of prefab straw bales07Third baloon frame Closing beamsfor roof and floor andcross bracing systemCONSTRUCTION KIT
  • 76. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGS010406 070810 11090502 03FoundationSecond baloon frameThird baloon frameFirst baloon frame’spillars-Closing beamsfor roof and floorClosing beamsfor roof and floor andcross bracing systemFirst baloon frame’scrossbeamsFloors pluggingRoof plugging Greenroof plantationAssembly of prefab straw bales08 Floors pluggingCONSTRUCTION KIT
  • 77. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGS010406 070810 11090502 03FoundationSecond baloon frameThird baloon frameFirst baloon frame’spillars-Closing beamsfor roof and floorClosing beamsfor roof and floor andcross bracing systemFirst baloon frame’scrossbeamsFloors pluggingRoof plugging Greenroof plantationAssembly of prefab straw bales09 Assembly of prefab straw balesCONSTRUCTION KIT
  • 78. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGS010406 070810 11090502 03FoundationSecond baloon frameThird baloon frameFirst baloon frame’spillars-Closing beamsfor roof and floorClosing beamsfor roof and floor andcross bracing systemFirst baloon frame’scrossbeamsFloors pluggingRoof plugging Greenroof plantationAssembly of prefab straw bales10 Roof pluggingCONSTRUCTION KIT
  • 79. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/COMPETITIONFACILITIES’BUILDINGS010406 070810 11090502 03FoundationSecond baloon frameThird baloon frameFirst baloon frame’spillars-Closing beamsfor roof and floorClosing beamsfor roof and floor andcross bracing systemFirst baloon frame’scrossbeamsFloors pluggingRoof plugging Greenroof plantationAssembly of prefab straw bales11 Greenroof plantationCONSTRUCTION KIT
  • 80. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/350kmFENCEPATHSCOMPOST FOR AGRICULTUREBENCHES PLAYGROUND EQUIPMENTSTEPS FOR PUBLIC EVENTS830 mq PV PANELSgreen energyWODEN FENCEbuilding sites EXPO 201520.000 PLANKS9.000 STRAW BALE1.500 CROSSBEAMS550 BEAMSWODEN FENCE RAILROAD TIES20.000 PLANKS9.000 STRAW BALE1.500 CROSSBEAMS550 BEAMSnatural materialspotting shedzootechnicsreception and didacticstructuresPV PANELSPV PANELSPLANKS STRAW BALECROSSBEAMSBEAMSMATERIALSASSEMBLYRE-USERAILROAD TIESRAILROAD TIES830 mq PV PANELSgreen energyWODEN FENCEbuilding sites EXPO 201520.000 PLANKS9.000 STRAW BALE1.500 CROSSBEAMS550 BEAMSnatural materialsCROSSBEAMSBEAMSMATERIALSASSEMBLYRAILROAD TIESCOMPETITIONFACILITIES’BUILDINGSRE-USE STRATEGIES
  • 81. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/350kmFENCEPATHSCOMPOST FOR AGRICULTUREBENCHES PLAYGROUND EQUIPMENTSTEPS FOR PUBLIC EVENTS830 mq PV PANELSgreen energyWODEN FENCEbuilding sites EXPO 201520.000 PLANKS9.000 STRAW BALE1.500 CROSSBEAMS550 BEAMSWODEN FENCE RAILROAD TIES20.000 PLANKS9.000 STRAW BALE1.500 CROSSBEAMS550 BEAMSnatural materialspotting shedzootechnicsreception and didacticstructuresPV PANELSPV PANELSPLANKS STRAW BALECROSSBEAMSBEAMSMATERIALSASSEMBLYRE-USERAILROAD TIESRAILROAD TIESCOMPETITIONFACILITIES’BUILDINGSRE-USE STRATEGIES00 PLANKS0 CROSSBEAMSPV PANELSPLANKS STRAW BALECROSSBEAMSBEAMSASSEMBLYRE-USERAILROAD TIESOAD TIES
  • 82. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/350kmFENCEPATHSCOMPOST FOR AGRICULTUREBENCHES PLAYGROUND EQUIPMENTSTEPS FOR PUBLIC EVENTS830 mq PV PANELSgreen energyWODEN FENCEbuilding sites EXPO 201520.000 PLANKS9.000 STRAW BALE1.500 CROSSBEAMS550 BEAMSWODEN FENCE RAILROAD TIES20.000 PLANKS9.000 STRAW BALE1.500 CROSSBEAMS550 BEAMSnatural materialspotting shedzootechnicsreception and didacticstructuresPV PANELSPV PANELSPLANKS STRAW BALECROSSBEAMSBEAMSMATERIALSASSEMBLYRE-USERAILROAD TIESRAILROAD TIESCOMPETITIONFACILITIES’BUILDINGSRE-USE STRATEGIESFENCEPATHSCOMPOST FOR AGRICULTUREBENCHES PLAYGROUND EQUIPMENTSTEPS FOR PUBLIC EVENTSWODEN FENCE RAILROAD TIES20.000 PLANKS9.000 STRAW BALE1.500 CROSSBEAMS550 BEAMSPANELSPV PANELSRE-USE
  • 83. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/350kmFENCEPATHSCOMPOST FOR AGRICULTUREBENCHES PLAYGROUND EQUIPMENTSTEPS FOR PUBLIC EVENTS830 mq PV PANELSgreen energyWODEN FENCEbuilding sites EXPO 201520.000 PLANKS9.000 STRAW BALE1.500 CROSSBEAMS550 BEAMSWODEN FENCE RAILROAD TIES20.000 PLANKS9.000 STRAW BALE1.500 CROSSBEAMS550 BEAMSnatural materialspotting shedzootechnicsreception and didacticstructuresPV PANELSPV PANELSPLANKS STRAW BALECROSSBEAMSBEAMSMATERIALSASSEMBLYRE-USERAILROAD TIESRAILROAD TIESCOMPETITIONFACILITIES’BUILDINGSRE-USE STRATEGIES350kmULTUREPMENTpotting shedzootechnicsreception and didacticstructures
  • 84. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
  • 85. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
  • 86. Alessio Battistella ARCò . Architecture and Cooperation - http://www.ar-co.org/
  • 87. Alessio Battistella - ARCò architettura e cooperazionewww.ar-co.org - info@ar-co.org