Italian experience  and best practiceStara Zagora - Final side event28th of February 2013Katia Gerunda
Ree_trofit - the project at a glance
Ree_trofit –                project’s partners•   Italy:       Lucense (Coordinator)•   Italy:       Lucca Chamber of Comm...
Ree_trofit –          the project at a glance• Co-financed by: Intelligent Energy - Europe programme (the EUs  tool for fu...
Ree_trofit –               The main purpose To contribute to solve one of the major bottlenecks for increasing energy  pe...
Ree_trofit - Objectives1.   To define best practices for implementation and institutionalisation of     training2.   To pr...
Italy vocational training              results-3 training batches have been carried out: the first edition in 2011,the sec...
Italy vocational training              resultsThe analysis of the questionnaires of satisfaction, made at the end of thefi...
Laboratory            for Sustainable Building•aims at promoting innovation and at disseminating new building expertise an...
The projectLaboratory for Sustainable Buildingis a 3 years project aimed to builders and construction workers that has th...
Laboratory for Sustainable Building                        MODULE 1             MODULE 2             MODULE 3             ...
Module structureEach module consists in 3 main encounters:1) Theoretical lesson (workshops)    Traditional frontal lesson...
Lucca Chamber of Commerce        best practice                  The Lucca              Technological Park
Lucca Chamber of Commerce                     best practice    The objectives        The Lucca Technological park was crea...
Lucca Chamber of Commerce                  best practiceThe locationIndustrial area former Bertolli, in Lucca.To reduce at...
Lucca city center1km from urban walls                                           Highway                        Lucca Techn...
The premises – an eco-sustainable forefront                          facilityTwo buildings, realized by the Lucca Chamber ...
The premises – an eco-sustainable forefront                          facilityThe buildings have the following features:1. ...
The premises – an eco-sustainable forefront                                facility      Building 1 Research centre for   ...
The premises – an eco-sustainable forefront                     facility  Building 2   Businessincubation and acceleration
The premises – an eco-sustainable forefront facility                                              Building 1 Energy effici...
The premises – an eco-sustainable forefront facility                                 Building 2Building 2 has been build b...
Contacts               Katia GerundaLucca Chamber of Commerce/Lucca Promos Scrl          Corte della Campana, 10          ...
Thank you for your attention
Upcoming SlideShare
Loading in …5
×

Stara zagora, final side event

462 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
462
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Stara zagora, final side event

  1. 1. Italian experience and best practiceStara Zagora - Final side event28th of February 2013Katia Gerunda
  2. 2. Ree_trofit - the project at a glance
  3. 3. Ree_trofit – project’s partners• Italy: Lucense (Coordinator)• Italy: Lucca Chamber of Commerce and Industry• Italy: Abita Interuniversity Research Centre• Bulgaria: Bulgarian Chamber of Commerce and Industry• Bulgaria: European Labour Institute• Denmark: Engineering College of Aarhus• France: Chamber of Commerce and Industry Drome• Greece: Technological Educational Institute of Crete• Hungary: Chamber of Commerce and Industry Bács-Kiskun County
  4. 4. Ree_trofit – the project at a glance• Co-financed by: Intelligent Energy - Europe programme (the EUs tool for funding action to move us towards a more energy intelligent Europe)• Total amount: € 1.562.004• Funding: 75% (€ 1.171.503)• Grant agreement n. IEE/09/886/SI2.558310• Project duration: 36 months (01/05/2010 - 30/04/2013)
  5. 5. Ree_trofit – The main purpose To contribute to solve one of the major bottlenecks for increasing energy performance of existing building stocks: shortage of local qualified and accredited retrofitting expert by setting up a large-scale educational scheme and by fostering exchange of knowledge and best practices among participants
  6. 6. Ree_trofit - Objectives1. To define best practices for implementation and institutionalisation of training2. To prepare and plan a European vocational training program3. To improve training courses effectiveness and productiveness with an eco- building repository and other on-line tools4. To carry out 3 cycles of vocational training in the 6 participating countries5. To develop a validation strategy for assessing and further fostering the impact of the project6. To define and implement a communication and dissemination strategy to assure the maximum visibility
  7. 7. Italy vocational training results-3 training batches have been carried out: the first edition in 2011,the second in the spring of 2012 and the last one in the autumn of2012-The vocational training courses have had a great success-Some figures: Electrical installers 53 participants Thermo hydraulic 56 participants installers Building enterprises 60 participants
  8. 8. Italy vocational training resultsThe analysis of the questionnaires of satisfaction, made at the end of thefirst batch, has been very useful in order to improve the other editions.Main innovations have been the following:-improvement of the practical part by reducing the number of academicteachers and increasing the number of professionals;-reduction of the number of speakers in order to ease the teaching;-introduction of a preliminary common module, with a session of 2 hours, forthe three types of participants. The experience gained during the three REE_TROFIT training batches, permitted to improve the training. A specific enhanced training batch, a follow- up of REE_TROFIT called “Laboratory for Sustainable Building” is now going on.
  9. 9. Laboratory for Sustainable Building•aims at promoting innovation and at disseminating new building expertise andskills in construction industry of the Lucca area;•consists in multi-level specializing courses based on monothematic workshopsthat allows the establishment of personalized classes on specific topics for bothretraining and qualification. Courses were projected to be fully personalized on students request.
  10. 10. The projectLaboratory for Sustainable Buildingis a 3 years project aimed to builders and construction workers that has the purpose to generate a platform for non-stop training of qualified workers.is organized in 5 monothematic modules (12 hours each) on specific topic about different aspects of Green building and Sustainability, with great care of re-qualification and restoration of the present building assets. MODULES: 1. ENVIRONMENTAL- and ENERGY PERFORMANCE- CERTIFICATION / NEARLY ZERO- ENERGY BUILDING 2. BIOCOMPATIBLE and ECOSUSTAINABLE MATERIALS / INDOOR COMFORT 3. RESOURCES MANAGEMENT 4. RETROFITTING OF BUILDING ENVELOPE / EARTHQUAKE–SAFETY 5. MANAGEMENT OF ENERGY SUPPLY / INSTALLATION
  11. 11. Laboratory for Sustainable Building MODULE 1 MODULE 2 MODULE 3 MODULE 4 MODULE 5           ENVIRONMENTAL- BIOCOMPATIBLE  RESOURCES  RETROFITTING OF   MANAGEMENT OF  ENERGY  ECOSUSTAINABLE  MANAGEMENT BUILDING ENVELOPE ENERGY SUPPLY PERFORMANCE- MATERIALS +INDOOR     + EARTHQUAKE + INSTALLATION CERTIFICATION  COMFORT -SAFETY NEARLY ZERO-     ENERGY BUILDING   WORKSHOPs 4h 4h 4h 4h 4h THEORY THERMAL CAMERA  AIR-CONDITIONING  TERMAL BRIDGE  MATERIALS DOMOTICS BUILDING DIAGNOSTIC SYSTEMS + CONDENSATIONHANDS-ON TRAININGWITH CONSTRUCTION 4h 4h 4h 4h 4h PRACTICE COMPANIES DESIGNING IN THE   TECNICAL SOLUTIONS  UMIDITY HANDLING  BUILDING/ DESIGNING THE  INSTALLATIONS  MEDITERRANEAN  +  BUILDING SITE  AND VENTILATION  BUILDING ENVELOPE  INTERFACES  CONTEXT  MANAGEMENT  PROJECT PROJECT WORK 20h
  12. 12. Module structureEach module consists in 3 main encounters:1) Theoretical lesson (workshops) Traditional frontal lesson Real building projects explanation Critical examination and analysis of 1:1 scale product samples, components and systems at the center of education and divulgation “ABITARE MEDITERRANEO”, LUCENSE (project founded by “Regione Toscana”)2) Hands-on training Meeting with building companies and firms producing construction materials, building products and systems; Hands-on manual use of some samples in the designed facility at the laboratory of the Builder School in Lucca with the participation of companies representative for each field;3) Project work Development of a technical intervention, likely basing on real situations, working in teams composed by participant harboring different expertise.
  13. 13. Lucca Chamber of Commerce best practice The Lucca Technological Park
  14. 14. Lucca Chamber of Commerce best practice The objectives The Lucca Technological park was created with the goal of:• Favouring the installation and strengthening of distinctive enterprises and competencies in the field of innovation and technological transfer.• Promoting the design and the implementation of innovative R&D proposals.• Realizing collaborative platform among Universities, research system and enterprises.
  15. 15. Lucca Chamber of Commerce best practiceThe locationIndustrial area former Bertolli, in Lucca.To reduce at minimum the environmental impact it was favoured the replacementof pre existing buildings with new ones characterized by high energy efficiency,without the occupation of additional surfaces.The new park is conceived as a green port, starting and arrival point of the cycletrack and the pedestrian routes, open to everyone: the south park of Lucca,which favours relationships between enterprises and citizens.
  16. 16. Lucca city center1km from urban walls Highway Lucca Technological Park
  17. 17. The premises – an eco-sustainable forefront facilityTwo buildings, realized by the Lucca Chamber of Commerce with the financialsupport of the Tuscany Region and the Lucca Cassa di Risparmio Foundation.Building 12.600 sqm, 5 incubation modules for innovative enterprises; already located:LUCENSE – research body with its Paper quality centre, e-centre and itslaboratories for innovation and technological transfer (www.lucense.it) and 55100– development of high-end bespoke furniture, fittings, interiors, fixture andequipment using cardboard made from recycled and sustainable paper sources (www.55100.it).Building 2 (inaugurated on the 18th of July 2013)3650 sqm, space to host 23 innovative enterprises in the growth and developmentphase, 14 enterprises in incubation. Already located: 12 enterprises of which 3 inacceleration (http://www.polotecnologicolucchese.it/content.php?p=13). 4 newenterprises, in incubation, will settle within the end of March.
  18. 18. The premises – an eco-sustainable forefront facilityThe buildings have the following features:1. Eco-sustainabilityVentilated walls, use of renewable energies and of materials with lowenvironmental impact, reuse of rainwater.2. Bio-compatibilityPriorities of the project: healthiness and comfort in order to assure the best livingconditions to those who will occupy the buildingsA positive energy balance: Lucca Technological Park generates more energythan used.
  19. 19. The premises – an eco-sustainable forefront facility Building 1 Research centre for innovation andtechnological transfer
  20. 20. The premises – an eco-sustainable forefront facility Building 2 Businessincubation and acceleration
  21. 21. The premises – an eco-sustainable forefront facility Building 1 Energy efficiency and clean energyWalls and floors have been built in layers ofmaterials that allow excellent isolationperformances.Automatic internal luminous intensityadjustment. Use of photovoltaic panels on buildings roofs. Lot 1 uses methane micro turbines for thermal and electric energy cogeneration. Gener Exhau ator st Recuperator Coolin Outlet g Fins Air Compressor Gen Turbi Bear erat ne ings or
  22. 22. The premises – an eco-sustainable forefront facility Building 2Building 2 has been build by taking into consideration the following strategies of intervention: •Choice of the orientation and structure of the building; •Integration of system of casing highly efficient; •Roof garden; •Application of active integrated system for the exploitation of solar energy(photovoltaic and thermal); •Use of geothermal and of heat pumps coupled with a system of trigeneration to optimise inner spaces; •Natural ventilation and the improvement of air quality; •Natural lighting of inners spaces, through a proper sizing and orientation of the openings; •Mobile systems of shielding for transparent, vertical, horizontal surfaces; •Radiant floor and ceiling; •Use of "naturals" materials(cements, plasters, stone and wood coatings, vegetable insulating); •Use of hydraulic systems for the recovering of rain waters and optimisation of consumptions of water.
  23. 23. Contacts Katia GerundaLucca Chamber of Commerce/Lucca Promos Scrl Corte della Campana, 10 55100 Lucca (Italy) Tel. 0039 0583 976683 Fax. 0039 0583 976698 Email: katia.gerunda@lu.camcom.it
  24. 24. Thank you for your attention

×