Your SlideShare is downloading. ×
0
Presentation slide
Presentation slide
Presentation slide
Presentation slide
Presentation slide
Presentation slide
Presentation slide
Presentation slide
Presentation slide
Presentation slide
Presentation slide
Presentation slide
Presentation slide
Presentation slide
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Presentation slide

430

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
430
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. INDUSTRIAL TRAINING PRESENTATION IEK YAN YEE 21077
  • 2. COMPANY BACKGROUND <ul><li>Gamuda Sdn Bhd </li></ul><ul><ul><li>Turnkey and B.O.T </li></ul></ul><ul><ul><li>Projects and Investments - South East and Far East Asia, Indochina, South Asia and Middle East </li></ul></ul><ul><ul><li>Scope of Expertise – highways and expressways, bridges, tunnels, dams and hydropower, hydraulic engineering and water treatment, railways and mass-rapid transit, marine works and ports, and buildings </li></ul></ul>
  • 3. MMC-Gamuda Joint Venture <ul><li>Project Delivery Partner (PDP) </li></ul><ul><ul><li>Serve as a single point of accountability </li></ul></ul><ul><ul><li>Deliver the project within agreed time and cost </li></ul></ul><ul><ul><li>Packaging the works </li></ul></ul><ul><ul><li>Calling tender </li></ul></ul><ul><ul><li>Evaluating bids </li></ul></ul><ul><ul><li>Selecting work packages contracts </li></ul></ul><ul><ul><li>Making the awards to work contractors </li></ul></ul>
  • 4. KLANG VALLEY MASS RAPID TRANSIT (KVMRT) PROJECT <ul><li>SBK LINE </li></ul><ul><ul><li>First line </li></ul></ul><ul><ul><li>From Sungai Buloh to Kajang </li></ul></ul><ul><ul><li>Cut through Kuala Lumpur City Center </li></ul></ul><ul><ul><li>Plan to serve 1.2 million passengers </li></ul></ul>
  • 5.  
  • 6. List of Stations
  • 7. SBK LINE LENGTH 51km LENGTH OF UNDERGROUND 9.5km NUMBER OF STATIONS 35 NUMBER OF INTERCHANGE STATIONS 4 NUMBER OF PARK AND RIDE 13 CONSTRUCTION PERIOD 2011 TO 2016
  • 8. SUMMARY OF ACTIVITIES <ul><li>AutoCAD and MX Road </li></ul><ul><li>Geotechnical </li></ul>
  • 9. AutoCAD and MX Road <ul><li>AutoCAD </li></ul><ul><ul><li>User-friendly, </li></ul></ul><ul><ul><li>easy to learn and use </li></ul></ul><ul><li>MX Road </li></ul><ul><ul><li>Has a lot of function to design alignment </li></ul></ul><ul><ul><li>Complicated, not easy to familiarize </li></ul></ul><ul><ul><li>Only useful if one is familiar with it </li></ul></ul>
  • 10.  
  • 11. Geotechnical <ul><li>Analyzing the soil characteristics </li></ul><ul><ul><li>Deep Bore Log </li></ul></ul><ul><li>Soil improvement </li></ul><ul><ul><li>Compensation Grouting </li></ul></ul><ul><ul><li>Compaction Grouting </li></ul></ul>
  • 12. Compensation Grouting
  • 13. Compaction Grouting
  • 14. THANK YOU

×