Your SlideShare is downloading. ×
Hydro Energy By Sta Jafri
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Hydro Energy By Sta Jafri

938
views

Published on

115 MW Sharmai Hydropower Project by STA Jafri

115 MW Sharmai Hydropower Project by STA Jafri

Published in: Technology, Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
938
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. 115 MW SHARMAI HYDROPOWER PROJECT District Dir, NWFP Syed Tanveer Ahmed Jafri Vice President Jafri & Associates Consulting Engineers IEEP 22 nd Multi-Topic International Symposium 2007
  • 2. Benefits to Pakistan
    • Reduce D ependency on imported Fuel
    • Reduce E mission level
    • Increase E mployment in Rural area
    • Increase P rosperity of the Local population
    • Driving Force Behind PPIB Aggressive Pursuit to get Investment in Hydel Sector
  • 3. Background
    • 2002 Power Policy initially discouraged Oil Based IPP
    • In 2003 it was widely reported that Natural Gas Reserved were dwindling
      • This led to restriction on Natural Gas Connection to New IPP
  • 4. Benefits to IPP Hydel Specific
    • Hydel projects to be implemented under Build-Own-Operate-Transfer (BOOT) basis.
    • Hydrological Risk to be borne by Power Purchaser.
    • For Hydropower projects, priority dispatch with economic load dispatch criteria.
    • Provide protection against specified political risk.
    • Provide protection against charges in taxes and duties regimes.
  • 5. Benefits to IPP Hydel Specific
    • Two-part tariff structure consisting of fixed capacity and variable energy component is recommended with the proviso that fixed capacity payment for Hydel projects would fall between 60% to 66% of the total tariff.
    • To eliminate protracted negotiation, Implementation Agreement IA, Power Purchase Agreement PPA, Water Use License WUL have been standardized
  • 6. Seven Hydropower Projects
    • In February 2005
    • PPIB Advertised Seven (7) Hydropower Projects on ICB
    • They Were
      • Suki Kinari Hydropower Project, 655 MW Mansehra NWFP
      • Karrang Hydropower Project, 458 MW District Kohistan, NWFP
      • Madyan Hydropower Project, 148 MW Swat, NWFP
      • Patrind Hydropower Project, 130 MW Mansehra NWFP
      • Sharmai Hydropower Project, 115 MW Dir, NWFP
      • Mahl Hydropower Project, 245 MW Kohala, AJK
      • Harighel Hydropower Project, 53 MW Bagh AJK
      • Devastating Earthquake--- Major Setback happened on 8th of October 2005
    • (Almost all the LOI were issued in Oct/Nov 2005)
  • 7. Projects That Survived
  • 8. 115 MW SHARMAI HYDROPOWER PROJECT 1 of 5 that Survived
  • 9. Project Location & Statistical Data Catchment area : 1,915 km 2 Reservoir Capacity : 8.0 million m 3 Reservoir impounded area : 0.875 km 2 Design Discharge : 69.0 m 3 /s Gross Head : 220 m Plant Factor : 50 % Installed Capacity : 115 MW Annual Energy Output : 547 GWh/year Length of Headrace tunnel : 7.0 km (approx.) Length of Penstock : 2.0 km (approx.) Salient Features of the Project in the Previous Study Peshawar Islamabad Project Site Dam Site Powerstation Site
  • 10. Photo taken in 2005 Dam/Weir Site Intake Site Tail end of Reservoir Ushiri Khwar Panjkora River Powerstation Site
  • 11. Tectonic Map of Pakistan - India Project Site
  • 12. Seismicity around the project site 100km 50km 200km Dam site 2005.10.8 M>6 USGS NEIC data, 1900-2006
  • 13. Satellite Image by Google Earth Dam site Headrace tunnel Panjkora River Dir city
  • 14. Conditions of the Main Civil Structures Left Bank at Dam Site Road near Penstock and Powerhouse Upstream dam site Downstream dam site
  • 15.
    • Power station sites
    Surge tank and Penstock routes
  • 16. Preliminary Reviews of Main Project Features proposed
    • Main features of the Project proposed
    • Installed capacity: 115MW, Plant discharge: 69m 3 /s
    • Energy generated: 547GWh/yr, Plant factor: 0.54
    Comparison with CCGT Plant