Your SlideShare is downloading. ×
215 k rahul sharma
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
280
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Cluster Approach for Effective Decentralization in Off-grid Energy Project: A Case Study from Dhenkenal District, Odisha Paper Code: 215 Debajit Palit, K Rahul Sharma, Sudhakar Sundaray The Energy and Resources Institute, New Delhi IV th International Conference on Advances in Energy Research Indian Institute of Technology Bombay, Mumbai 12th December 2013
  • 2. Contents 1. 2. 3. 4. 5. Introduction and Rationale of Study The OASYS project in Dhenkanal, Odisha Study Objectives Methodology Results and Discussions
  • 3. Introduction and Rationale • Decentralised renewable energy power plants have emerged as one possible solution to providing energy access to remote communities. • A large number of programmes have been initiated, with varying degrees of success. • The design approach including the selection of services to be provided, technology, local institution and business models vary from model to model. • The objective here is to present a design approach for solar mini-grids, adopted under the OASYS project in Dhenkanal, Odisha: with a focus on the clustering approach – technical versus institutional clustering
  • 4. The OASYS project in Dhenkanal, Odisha • A multi-consortium project: ‘Decentralised off-grid electricity generation in developing countries: Business models for off-grid electricity supply’, known as ‘OASYS South Asia Project • Project aims to develop innovative and participatory business models for decentralised off-grid electricity supply in South Asia • One component of the project is to develop an off-grid delivery model framework and implementation of demonstration project(s), covering un-electrified villages, to test the framework. • The project area under consideration comprises of four villages and one hamlet, namely Rajanga, Kanka, Chadoi, Baguli and Rajanga Hamlet.
  • 5. The OASYS project in Dhenkanal, Odisha • The village cluster is at a distance of 120 km from the state capital of Bhubaneswar. • The households are mostly from the tribal communities and are completely un-electrified. • These villages have also not been considered under the RGGVY scheme have also little chance of getting access to electricity through grid extension as they lie inside the Kandhara Reserve Forest which falls under an elephant corridor in the district. Name of Village Rajanga Kanaka Baguli Chaddoi Latitude/ Longitude N 20o34’07.6” E 85o16’26.3” N 20o32’45.6” E 85o16’0.67” N 20o33’19.6” E 85o17’47.2” N 20o32’51.9” E 85o16’38.6” Rajanga Hamlet(Pu ranaSahi) N 20o34’26.4” E 85o16’24.7” Total households 34 43 35 12 12 Total Population 140 189 142 46 38
  • 6. Study Objectives • Clustering (along with distribution lines to clustered villages) is the preferred approach and prescribed by the DDG guidelines. • Clustering has benefits due to economies of scale • However, it is important to assess the benefits of clustering, specific to the sites under consideration – from design, investment, O&M and institutional perspectives. • Additionally, clustering methods need to be modified for different technologies – solar v/s biomass for instance • Hence this study was undertaken to compare the techno-economics and institutional benefits of different models of clustering – one which is technical and another which is institutional
  • 7. Methodology • An energy demand and livelihood assessment exercise has already been carried out using (Participatory Rural Appraisal) PRA techniques, the results of which are inputs to this paper • From the resource point of view, biomass, solar, wind and small hydro were considered and solar emerged as the most feasible option. Biomass, though available, is largely in the reserve forest. • Components of the project as a whole include: solar PV power plants, civil construction, public distribution network and household wiring, institutional overheads, human resources and O&M • Costs of components are based on quotations taken from local vendors • O&M costs at 0.5% of capex have been considered for 5 years assuming an inflation of 10% • 2 cases have been considered: – Distributed power plants in all 5 sites – A centralised power plant at Rajanga (most accessible site)
  • 8. Methodology Appliances Capacity Purpose Grinder 2 HP at Rajanga For grinding turmeric and chilli powder Electronic Weighing Scale and Sealing Machine Weighing Scale – 10-20 W at Rajanga Sealing Machine – 150 W at Rajanga For accurately weighing and packaging of ground turmeric and chilli powder. These have wider application since users can use the machi ne for other products as well and bring about standardization throu gh accurate weighing, delinking them from the middle-men Saal Leaf Plate Pressing Ma 0.5 HP at Rajanga chine Water pumps The community is currently engaged in the stitching of basic Sal leaf plates, called Khalis. By pressing two Khalis together in the machine, a firm plate can be moulded which has a much higher value in the m arket. 2 HP each at Rajanga an Agricultural is possible only during the monsoon and the farm lands lie unused during the rest of the year. Hence, to improve agricultural d Kanaka yield, especially of high value crops such as brinjal, water pumps are being provided to initiate activities during the non-monsoon period. 50 LPH, 75 W each at Ra For provision of clean drinking water janga, Kanaka and Bagul i In addition to the above, provision for the following services has been included in the sizing of the power plant: TV-DVD at the community centres (for educational and training purposes) Community centre lighting and fans (to create a resource/community centre for people to work and also for meetings, discussions, trainings, etc.) 2 light points and a plug point at every household Water Purifier
  • 9. Methodology Case 1 - Based on the load profiles and one day of autonomy for night time loads, the total PV and battery size have been calculated - 5 independent systems have been designed - The three power plants catering to a larger number of households, community, productive and/or agricultural loads (in Rajanga, Kanaka and Baguli) are designed as AC power plants. Taking costs into consideration, the two smallest sites (with 12-15 households with basic 2 light points and mobile charging requirements) are being provided with DC micro grids. However the quality of service (lumen output of lighting and hours of operation) are the same in AC or DC - The pumps have been connected to the main power plants (rather than an independent solar PV set) via a distribution line (at a slightly higher cost): - - (i) cater to any future requirements of increase in pump size and (ii) cater to inrush current required by the pump when it is switched on. Demand side management (alternating pump with other livelihoods) has been factored in to optimise PLF
  • 10. Length of the distribut Total length of th ion line along the long e distribution lin est feeder (meters) e (meters) 6 kWp SPV power plant, 6 kVA inv 1500 2100 erter (grid tied), 48 V 500 Ah batte ry bank 5 kWp SPV power plant, 5 kVA inv 900 1400 erter, 48 V 600 Ah battery bank Site AC/DC Plant Design Rajanga AC Kanaka AC Chadoi AC 2.5 kWp SPV power plant, 2 kVA in verter, 48 V 500 Ah battery bank 700 1100 Baguli DC 200 Wp, 24 V 100 Ah battery bank , 15 A charge controller 200 300 Rajanga Hamlet DC 200 Wp, 24 V 100 Ah battery bank , 15 A charge controller 200 300
  • 11. Methodology Alternative Designs: Cases 2 and 3 Case 1 was arrived at with the objective of optimizing system design, reducing losses and minimizing projects costs In cases 2 and 3 we consider the alternative of a central power plant at Rajanga since it is the easiest to access and leads to lowered transport costs and reduction in delays
  • 12. Methodology
  • 13. Results and Discussion Case 2: Village/ Hamlet Rajanga hamlet Kanaka Chadoi Baguli Economic Voltage (kV) as per allowable standar as per calculation d voltages 3.4 3.3 7.3 6.6 6.7 6.6 7.3 6.6 As expected, the design becomes unfeasible Cost of transmission cables, step-up and step-down transformers and protection devices would be several times of the power plant cost
  • 14. Results and Discussion Case 3 - High power loss unto 11% in one case occurs To compensate for this loss: For option -1, where same local cables are extended, the size will increase by 1,660 Wp and for option - 2, where a 45.6 mm2 cable is used, the power plant size would need to be increased by 830 Wp Site Rajanga AC/DC AC Length of the distribution line along the longest fee der (meters) 14.6 kWp SPV power plant, 2*9 kV 3,700 A inverter (one grid tied), 96 V 800 Ah battery bank Plant Design Total length of the distribution line (m eters) 13,800 Cost (INR) Particulars Solar Power Plant Distribution Line Household connections Construction Requirements Annualised O&M cost over a 5 year period TOTAL Case 1 3,162,229 1,748,000 272,000 1,983,923 241,894 7,166,152 Case 3 2,926,000 5,244,000 272,000 1,523,861 100,948 9,965,861
  • 15. Results and Discussion - 40% higher cost of implementation with O&M costs factored in for a 5 year period - Transmission costs however have increased 3 times - There may be some operational benefits from a centralised system, however a strong case can be made for distributed systems (with a single entity to manage the cluster) owning to increased capex and overall reduction in system efficiency. Also for such a community, maintaining the health of such a long PDN will be difficult. - This may be the case for solar (which is highly modular) but not for biomass or other RE where there is a limit on the minimum capacity of power plant and a clustering of loads around a single power plant is preferred - Population density is another factor where results will vary, owing to the sparse population of the area under consideration - Future research can look into similar techno-economic analyses of implementation costs and can have useful implications for programmatic implementation of renewable energy technologies.