Project «Variative system»
Upcoming SlideShare
Loading in...5
×
 

Project «Variative system»

on

  • 1,030 views

 

Statistics

Views

Total Views
1,030
Views on SlideShare
784
Embed Views
246

Actions

Likes
0
Downloads
1
Comments
0

5 Embeds 246

http://cctt.com.ua 232
http://www.auic.com.ua 5
http://www.linkedin.com 5
http://www.cctt.com.ua 2
http://auic.com.ua 2

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Project «Variative system» Project «Variative system» Presentation Transcript

  • Project «Variative system» Association “Ukrainian Innovation Companies” «Ukrainian Center of Commercialization and Technology Transfer» 49000, Ukraine, Dnepropetrovsk, 49000, Ukraine, Dnepropetrovsk, K.Marx av., 81 K.Marx av., 81 Website: www.auic.com.ua Website: www.cctt.com.ua E-mail: auic@auic.com.ua E-mail: cctt@cctt.com.ua Phone / Fax: +38 (0562) 35-00-80 Phone / Fax: +38 (056) 376-10-70
  • Solved Problems High specific Stepped modified torque High cost Low compactness metal capacity Significant Low dynamic High Low operational and specifications energy-consuming efficiency technology costs
  • Benefits of innovation unit Application of new units in transmissions will: Significantly expand the Increase the reliability and Reduce the capital intensity Delete a stepped Reduce scope of variable speed durability of machines and of 2 times, change of velocity energy consumption drives mechanisms the cost of 10-25% New units are capable to replace: Conventional motors, Gearboxes,which which have a constant discretely change the Regulated electric Friction and V-belt speed of rotation of frequency of rotation of devices variators output shaft output shaft
  • Stages of the project and list of works I stage Volume of investment Design and manufacture of prototypes, 12 months 172 505 $ bench and field testing, certification. II stage Production of experimental-industrial 12 months 321 250 $ lot. Carrying out industrial trials. III stage Construction of the plant and 32 organization of the production capacity months 326 901 750 $ of 100,000 variant systems per year.
  • Integral project performance indicators Investment Payback Period Hurdle rate profitability Current stage of the project: • Laboratory model was made. • Laboratory tests were conducted. • Ukraine patent was obtained. • Technical documentation was developed.
  • Product application areas Ukraine market, CIS market, Product Application area units per year units per year Automatic 1 variational gearboxes 85 000 900 000 Cars, trucks, buses and other equipment for cars Automatic 2 variational gearboxes 6 000 80 000 Tractors class 1,4 and 2 for tractors Variational transmissions Regulators step seeding seeders, combines 3 15 000 100 000 for other agricultural and drive units, etc. equipment Variational 4 transmissions 1 500 - Military vehicles for military vehicles Variators for Mechanical engineering, energy, mining 5 100 000 400 000 generators and welders equipment Metal-cutting equipment, 6 Technology drives variators 3 000 20 000 conveyors, compressors, gas-pumping stations, etc. TOTAL: 210 500 1 550 000
  • The volume of market and rate of market development Capacity of the world market of variable systems 1 000 000 000 000 $ Ukraine China $105 250 000 CIS $270 000 000 000 $775 000 000 Market prices and their dynamics The market value of The rise Variator products, in prices, thousands of $ % / year. Automatic gearboxes 1-4 for automobiles 4-8 Automatic gearboxes 3-5 for tractors Variators for agricultural vehicles (Regulators step seeding seeders, 0,5-2 combines and drive units, etc.) 5-10 Variators for electric motors 0,5-5 Technology 0,5-5 EU drives variators USA $260 000 000 000 $265 000 000 000
  • Partners Customers: AvtoZAZ SE Yuzhmash OJSC «Krasnaya Zvezda» CJSC «Ukravtozapchast» AvtoVAZ (Zaporozhye) (Dnepropetrovsk) (Kirovograd) (Kiev) (Togliatti) OJSC «Kherson combines» Kharkov Tractor Plant Minsk Tractor Plant OJSC«Lipetsk tractor» (Kherson) (Kharkov) (Minsk) (Lipetsk) Contractors: OJSC «Lozova Forging- CJSC «Lugansk foundry- «Promsnab» «Geophyspribor» OJSC «Teploavtomat» Mechanical Plant» mechanical plant» (Kramatorsk) (Kiev) (Kharkov) (PM Lozovaja) (Lugansk)