Your SlideShare is downloading. ×
Civilian Infrastructure Monitoring System Generic
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Civilian Infrastructure Monitoring System Generic

639

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
639
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • tgt
  • tgt
  • Transcript

    • 1. Civilian Infrastructure Monitoring System (CIMS) April 2008 Confidential
    • 2.
      • Traditional Monitoring
        • Inspectors dispatched to remote sites
        • Perform inspection of infrastructure on site
        • Record data through manual or electronic means
        • Data analyzed off-site
      April 2008 Confidential
    • 3.
      • Traditional Monitoring
      April 2008 Confidential
    • 4.
      • What is CIMS
        • CIMS is the acronym for Civilian Infrastructure Monitoring System
        • Remote monitoring of bridges, buildings, roads and other civilian infrastructure
        • Collection and secure transmission of data from remote site to CIMS servers in SIRTA data center
        • Data Storage and presentation to customers via CIMS Portal through the Internet
        • Data includes measurements presented in graphical format as well still pictures.
      April 2008 Confidential
    • 5. April 2008 Confidential
    • 6.
      • Remote Monitoring with CIMS
        • One time site visit (for installation)
        • Remote site monitoring at any location
        • Continuous 24x7 data collection
        • Raw measurement data collected
        • Snapshots of study area collected
        • On-demand data presentation via Internet
        • Secure connectivity
      April 2008 Confidential
    • 7.
      • Equipment
        • Datalogger
        • Camera
        • Modem
        • Crackmeter
      • Installation time?
        • One day
        • Includes Site visit
        • Survey of incumbent area
      April 2008 Confidential Test Site Installation Datalogger Camera Modem
    • 8.
        • Monitoring equipment installed at Test Bridge
        • Equipment powered by battery and solar panel
        • Expected timeframe for Pilot is 1 month
        • Data and images are collected and transmitted via cell modem every hour
        • Collection and transmission frequency can be changed
      April 2008 Confidential Test Site Installation
    • 9. April 2008 Confidential Test Site Installation Battery
    • 10. April 2008 Confidential Test Site Installation Solar Panel
    • 11. April 2008 Confidential Test Site Installation Enclosure
    • 12.
        • CIMS Portal is configured on servers in SIRTA’s data center
        • User ID and password is required to login
        • Data and images are collected 24x7 from remote site
        • Select date and time range to display data or images
      April 2008 Confidential CIMS Portal
    • 13. April 2008 Confidential CIMS Portal
      • Portal main page
      • Select login
      • Enter userid and password
    • 14. April 2008 Confidential CIMS Portal
      • Enter organization, site, start, and end date
    • 15.
        • Each DEF_COR_Min data point represents the lowest reading of 6 measurements of the last hour of the crack width in millimeters.
        • Each DEF_COR_Max data point represents the highest reading of 6 measurements of the last hour of the crack width in millimeters.
        • DEF_COR_Avg is a running average of the last 6 crack width readings in millimeters.
        • The resolution of the readings 0.025% FS, ie 0.0125 millimeters with a ± 0.1% of 50 millimeter accuracy
        • Positive and negative numbers indicate expansion and contraction respectfully .
      April 2008 Confidential CIMS Portal – Data Plot
    • 16. April 2008 Confidential CIMS Portal – Crack Images
    • 17. April 2008 Confidential CIMS Portal – Crack Images
    • 18. April 2008 Confidential CIMS Portal – Crack Images
    • 19.
      • Future trends for CIMS
          • Monitoring of cracks
          • Monitoring of slope movement
          • Monitoring of water levels
          • Monitoring of vertical or horizontal displacement
      • Perform Demo
      April 2008 Confidential
    • 20.
        • Contact:
        • SIRTA
        • Office: 55 Town Center Court
        • Suite 700-35
        • Scarborough, Ontario
        • M1P 4X4
        • Phone: 647-477-3509
        • Fax: 416-352-5463
        • Email: [email_address]
      April 2008 Confidential

    ×